How to Get a Shed Permit in Burbank, CA (2026 Guide)

Everything you need to know about shed permits in Burbank, CA, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 3, 2026 · How we research →

$45 – $225 Permit Fees
about 2 weeks Approval Time
3 Local Rules

Check your specific shed project

Get an instant, personalized answer for your exact project details in Burbank.

Free Permit Lookup →

Do You Need a Shed Permit in Burbank?

Based on Burbank's local building codes, you'll need a permit when:

Required·Rule 1

Accessory structures over 120 square feet require a building permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

These shed projects are typically exempt in Burbank:

Exempt·Rule 1

Accessory structures 120 square feet or less do not require a building permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

Permit Fees in Burbank

Based on local Burbank permit data, fees for shed projects typically range:

$45 – $225 Burbank Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Small shed (under 200 sq ft, storage only)$50 – $150
Medium shed (200–400 sq ft)$100 – $300
Large shed or workshop (400+ sq ft)$150 – $500+
Electrical permit (if adding power to shed)$50 – $150 additional
Plumbing permit (if adding water)$50 – $200 additional
Habitable conversion (ADU/tiny home)$500 – $2,000+

Fees are typically calculated based on estimated project value. Contact Building & Safety Division for exact amounts.

How Long Does It Take?

In Burbank, typical approval time for shed permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Shed Permit in Burbank

  1. 1 Check requirements: Use our free lookup tool or contact Building & Safety Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Burbank accepts applications online at Building & Safety Division.
  4. 4 Pay fees: Pay the applicable permit fees ($45 – $225).
  5. 5 Wait for approval: Your application will be reviewed by Burbank plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building & Safety Division at (818) 238-5220 to schedule required inspections at each phase of the project.

Burbank Building Department Contact

NameBuilding & Safety Division
Apply OnlineApply online
Address150 N Third Street, Burbank, CA 91502
HoursMon-Thu 8am-3:30pm; Fri 8am-3pm

Required Inspections in Burbank

Most shed projects in Burbank require inspections at each construction stage:

Inspection·Stage 1

Foundation Inspection, Forms and reinforcing are in place, proper depth below grade, rebar size and spacing, anchor bolt placement, and soil conditions. For simpler foundations (gravel pads), this inspection may be combined with the final.

WhenAfter the foundation is prepared but before the shed is placed or framing begins, applies to sheds on permanent foundations (concrete slabs, piers, or footings)
Common FailuresInsufficient depth, missing anchor bolts, improper rebar placement, foundation not matching approved plans.
Inspection·Stage 2

Framing Inspection (larger sheds), Lumber sizes and grades, connections and nailing patterns, hurricane ties and straps, header sizes over openings, and overall structural compliance with approved plans.

WhenAfter framing is complete but before sheathing and siding are installed, typically required only for larger site-built sheds
Common FailuresWrong lumber sizes, missing hurricane ties, inadequate connections, framing not matching approved plans.
Inspection·Stage 3

Final Inspection, Shed is in the correct location per the approved site plan, proper setbacks from property lines, adequate anchoring and tie-down, roof installation, door and window installation, drainage, and overall compliance with approved plans. If electrical was permitted, wiring and panel are checked separately.

WhenAfter all work is complete, for small sheds, this may be the only inspection required
Common FailuresShed not in the approved location, insufficient anchoring, setback violations, electrical work not to code.

Schedule inspections with Building & Safety Division at (818) 238-5220 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your shed project. In Burbank, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for shed projects in Burbank typically range from $45 – $225. Fees are usually based on the estimated project value.

Typical approval time in Burbank is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Burbank can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Burbank can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your shed project in Burbank?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Shed Rules for Burbank

View all local rules, exemptions, and fee details on the permit page.

Shed Permit Rules →
Disclaimer: This guide provides general information about shed permit requirements in Burbank, CA. Requirements can change. Always confirm with Building & Safety Division before starting any project. PermitMint provides general guidance, not legal advice.