How to Get a Electrical Work Permit in Burbank, CA (2026 Guide)

Everything you need to know about electrical work permits in Burbank, CA, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 3, 2026 · How we research →

$45 – $720 Permit Fees
about 1 week Approval Time
4 Local Rules

Check your specific electrical work project

Get an instant, personalized answer for your exact project details in Burbank.

Free Permit Lookup →

Do You Need a Electrical Work Permit in Burbank?

Based on Burbank's local building codes, you'll need a permit when:

Required·Rule 1

Adding new circuits requires an electrical permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 2

Upgrading an electrical panel requires an electrical permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 3

Rewiring requires an electrical permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

These electrical work projects are typically exempt in Burbank:

Exempt·Rule 1

Replacing a light fixture or outlet does not require a permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

Permit Fees in Burbank

Based on local Burbank permit data, fees for electrical work projects typically range:

$45 – $720 Burbank Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Minor work (1–2 outlets, single circuit)$50 – $150
Dedicated circuit (EV charger, appliance)$75 – $200
Sub-panel installation$100 – $250
Panel upgrade (200A service)$100 – $350
Whole-house rewire$250 – $600+
Re-inspection fee (if work fails)$50 – $100

Fees are typically calculated based on estimated project value. Contact Building & Safety Division for exact amounts.

How Long Does It Take?

In Burbank, typical approval time for electrical work permits is about 1 week.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Electrical Work Permit in Burbank

  1. 1 Check requirements: Use our free lookup tool or contact Building & Safety Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Burbank accepts applications online at Building & Safety Division.
  4. 4 Pay fees: Pay the applicable permit fees ($45 – $720).
  5. 5 Wait for approval: Your application will be reviewed by Burbank plan reviewers. Typical turnaround is about 1 week.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building & Safety Division at (818) 238-5220 to schedule required inspections at each phase of the project.

Burbank Building Department Contact

NameBuilding & Safety Division
Apply OnlineApply online
Address150 N Third Street, Burbank, CA 91502
HoursMon-Thu 8am-3:30pm; Fri 8am-3pm

Required Inspections in Burbank

Most electrical work projects in Burbank require inspections at each construction stage:

Inspection·Stage 1

Rough-In Electrical Inspection, Wire routing and support (stapled within 12 inches of boxes, every 4.5 feet per NEC 334.30 for NM cable), proper box placement and sizing per NEC Article 314, correct wire gauge for circuit amperage, nail plates installed where wires pass through studs within 1.25 inches of the edge (NEC 300.4), grounding conductors present and continuous, proper separation of high and low voltage wiring, and AFCI/GFCI circuit identification.

WhenAfter new wiring is run through open walls and ceilings but before drywall is installed, inspector must see all wiring
Common FailuresWrong wire gauge for the breaker, missing nail plates, wires not properly supported, overcrowded boxes, missing grounding conductor.
Inspection·Stage 2

Final Electrical Inspection, All devices installed and functioning, GFCI outlets tested with test button, AFCI breakers tested, panel properly labeled per NEC 408.4 (every circuit identified), proper clearances around panel (36 inches deep, 30 inches wide, 78 inches high per NEC 110.26), cover plates on all boxes, outdoor receptacles with weather-resistant in-use covers, correct polarity on all outlets, tamper-resistant receptacles installed, and smoke/CO detectors operational where applicable.

WhenAfter all devices are installed, circuits are energized, and the panel is complete
Common FailuresMissing GFCI or AFCI protection (most common), panel labeling incomplete, missing cover plates, outdoor outlets without in-use covers, clearance violations around the panel.

Schedule inspections with Building & Safety Division at (818) 238-5220 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your electrical work project. In Burbank, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for electrical work projects in Burbank typically range from $45 – $720. Fees are usually based on the estimated project value.

Typical approval time in Burbank is about 1 week. Complex projects requiring structural review may take longer.

In most cases, homeowners in Burbank can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Burbank can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your electrical work project in Burbank?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

Electrical Work Permits in Nearby Cities

See electrical work permit requirements in other California cities:

See Detailed Electrical Work Rules for Burbank

View all local rules, exemptions, and fee details on the permit page.

Electrical Work Permit Rules →
Disclaimer: This guide provides general information about electrical work permit requirements in Burbank, CA. Requirements can change. Always confirm with Building & Safety Division before starting any project. PermitMint provides general guidance, not legal advice.