How to Get a Kitchen Remodel Permit in Burbank, CA (2026 Guide)

Everything you need to know about kitchen remodel permits in Burbank, CA, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 3, 2026 · How we research →

$90 – $600 Permit Fees
about 2 weeks Approval Time
5 Local Rules

Check your specific kitchen remodel project

Get an instant, personalized answer for your exact project details in Burbank.

Free Permit Lookup →

Do You Need a Kitchen Remodel Permit in Burbank?

Based on Burbank's local building codes, you'll need a permit when:

Required·Rule 1

Kitchen plumbing changes require a plumbing permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 2

Removing or modifying walls requires a building permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 3

Adding a kitchen island with plumbing or electrical requires permits.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source
Required·Rule 4

Gas line work requires a mechanical/gas permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

These kitchen remodel projects are typically exempt in Burbank:

Exempt·Rule 1

Cosmetic kitchen updates do not require a permit.

SourceCalifornia Building Code / 2022 IRC with local amendments · view source

Permit Fees in Burbank

Based on local Burbank permit data, fees for kitchen remodel projects typically range:

$90 – $600 Burbank Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Cosmetic remodel (no plumbing/electrical/structural)Usually exempt
Electrical permit (adding circuits or outlets)$50 – $500
Plumbing permit (moving or adding fixtures)$50 – $500
Building permit (structural changes)$150 – $900
Full gut remodel (all trade permits combined)$500 – $3,000+
Structural engineering (wall removal, if needed)$1,000 – $1,800 (separate from permit)

Fees are typically calculated based on estimated project value. Contact Building & Safety Division for exact amounts.

How Long Does It Take?

In Burbank, typical approval time for kitchen remodel permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Kitchen Remodel Permit in Burbank

  1. 1 Check requirements: Use our free lookup tool or contact Building & Safety Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Burbank accepts applications online at Building & Safety Division.
  4. 4 Pay fees: Pay the applicable permit fees ($90 – $600).
  5. 5 Wait for approval: Your application will be reviewed by Burbank plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building & Safety Division at (818) 238-5220 to schedule required inspections at each phase of the project.

Burbank Building Department Contact

NameBuilding & Safety Division
Apply OnlineApply online
Address150 N Third Street, Burbank, CA 91502
HoursMon-Thu 8am-3:30pm; Fri 8am-3pm

Required Inspections in Burbank

Most kitchen remodel projects in Burbank require inspections at each construction stage:

Inspection·Stage 1

Rough Framing Inspection, Correct lumber sizes, spacing, and species/grade per approved plans, headers and beams matching engineering calculations, proper bearing and connections, metal connectors and joist hangers installed with correct fasteners, fireblocking in place, and overall structural integrity.

WhenAfter wall removal, new framing, and structural modifications are complete but before insulation or drywall, inspector must see all structural work
Common FailuresBeam or header undersized for the span, missing or incorrect metal connectors, improper bearing at beam ends, fireblocking not installed.
Inspection·Stage 2

Rough Electrical Inspection, Wire gauge appropriate for circuit amperage, proper box placement and fill calculations, two dedicated 20-amp small-appliance circuits present (NEC 210.11(C)(1)), GFCI and AFCI protection where required, dedicated circuits for dishwasher and disposal, and countertop receptacle spacing compliance.

WhenAfter wiring is run but before walls are closed, often inspected at the same time as framing
Common FailuresMissing dedicated 20-amp kitchen circuits, incorrect wire gauge, GFCI not provided for all kitchen receptacles, countertop outlets spaced too far apart.
Inspection·Stage 3

Rough Plumbing and Gas Inspection, Supply lines properly sized and supported, drain system properly sloped and vented, gas piping pressure-tested (typically 15 PSI air test held for 15+ minutes with no pressure drop), no leaks at any joints, and proper pipe materials and connections.

WhenAfter supply lines, drain/waste/vent piping, and gas lines are installed but before walls are closed
Common FailuresGas piping failing pressure test, drain slope insufficient, vent too far from trap, undersized supply lines for new fixture locations.
Inspection·Stage 4

Final Inspection, All outlets work and GFCI trips properly, all covers on electrical boxes, plumbing has no leaks and drains properly, gas appliances connected and leak-tested, structural connections complete, range hood exhausts to exterior, smoke and CO detectors installed and functional, and overall compliance with approved plans.

WhenAfter all work is complete, cabinets, countertops, appliances, and fixtures installed and connected
Common FailuresGFCI not functioning on all kitchen receptacles, gas leak at appliance connection, range hood not vented to exterior, uncovered electrical boxes.

Schedule inspections with Building & Safety Division at (818) 238-5220 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your kitchen remodel project. In Burbank, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for kitchen remodel projects in Burbank typically range from $90 – $600. Fees are usually based on the estimated project value.

Typical approval time in Burbank is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Burbank can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Burbank can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your kitchen remodel project in Burbank?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

Kitchen Remodel Permits in Nearby Cities

See kitchen remodel permit requirements in other California cities:

See Detailed Kitchen Remodel Rules for Burbank

View all local rules, exemptions, and fee details on the permit page.

Kitchen Remodel Permit Rules →
Disclaimer: This guide provides general information about kitchen remodel permit requirements in Burbank, CA. Requirements can change. Always confirm with Building & Safety Division before starting any project. PermitMint provides general guidance, not legal advice.