How to Get a Shed Permit in Los Angeles, CA (2026 Guide)
Everything you need to know about shed permits in Los Angeles, CA, local requirements, fees, timelines, and how to apply.
By Joey, Founder · Last updated May 15, 2026 · How we research →
Check your specific shed project
Get an instant, personalized answer for your exact project details in Los Angeles.
Free Permit Lookup →Do You Need a Shed Permit in Los Angeles?
Based on Los Angeles's local building codes, you'll need a permit when:
Any accessory structure with electrical wiring requires both a building permit and an electrical permit. Electrical work must be performed by a licensed C-10 electrical contractor or the homeowner under an owner-builder permit with proper disclosure.
Any accessory structure with plumbing requires both a building permit and a plumbing permit. Plumbing work must be performed by a licensed plumbing contractor or the homeowner under an owner-builder permit.
Accessory structures exceeding 120 square feet require a building permit. Plans showing the structure's dimensions, setbacks, and construction details must be submitted for review.
These shed projects are typically exempt in Los Angeles:
Detached accessory structures (sheds) not exceeding 120 square feet, single story, without electrical or plumbing, are exempt from building permits per CBC §105.2. The structure must be used for storage only and not for habitation.
Permit Fees in Los Angeles
Based on local Los Angeles permit data, fees for shed projects typically range:
Here's how fees break down by project scope nationally:
| Project Scope | Typical Permit Fee |
|---|---|
| Small shed (under 200 sq ft, storage only) | $50 – $150 |
| Medium shed (200–400 sq ft) | $100 – $300 |
| Large shed or workshop (400+ sq ft) | $150 – $500+ |
| Electrical permit (if adding power to shed) | $50 – $150 additional |
| Plumbing permit (if adding water) | $50 – $200 additional |
| Habitable conversion (ADU/tiny home) | $500 – $2,000+ |
Fees are typically calculated based on estimated project value. Contact Los Angeles Department of Building and Safety for exact amounts.
How Long Does It Take?
In Los Angeles, typical approval time for shed permits is about 2 weeks.
More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.
How to Apply for a Shed Permit in Los Angeles
- 1 Check requirements: Use our free lookup tool or contact Los Angeles Department of Building and Safety to confirm your project needs a permit.
- 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
- 3 Submit online: Los Angeles accepts applications online at Los Angeles Department of Building and Safety.
- 4 Pay fees: Pay the applicable permit fees ($200 – $1,200).
- 5 Wait for approval: Your application will be reviewed by Los Angeles plan reviewers. Typical turnaround is about 2 weeks.
- 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
- 7 Schedule inspections: Call Los Angeles Department of Building and Safety at (213) 482-0000 to schedule required inspections at each phase of the project.
Los Angeles Building Department Contact
Required Inspections in Los Angeles
Most shed projects in Los Angeles require inspections at each construction stage:
Foundation Inspection, Forms and reinforcing are in place, proper depth below grade, rebar size and spacing, anchor bolt placement, and soil conditions. For simpler foundations (gravel pads), this inspection may be combined with the final.
Framing Inspection (larger sheds), Lumber sizes and grades, connections and nailing patterns, hurricane ties and straps, header sizes over openings, and overall structural compliance with approved plans.
Final Inspection, Shed is in the correct location per the approved site plan, proper setbacks from property lines, adequate anchoring and tie-down, roof installation, door and window installation, drainage, and overall compliance with approved plans. If electrical was permitted, wiring and panel are checked separately.
Schedule inspections with Los Angeles Department of Building and Safety at (213) 482-0000 at least 24–48 hours in advance.
Frequently Asked Questions
Whether you need a permit depends on the size and scope of your shed project. In Los Angeles, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.
Permit fees for shed projects in Los Angeles typically range from $200 – $1,200. Fees are usually based on the estimated project value.
Typical approval time in Los Angeles is about 2 weeks. Complex projects requiring structural review may take longer.
In most cases, homeowners in Los Angeles can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.
Working without a required permit in Los Angeles can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.
Ready to check your shed project in Los Angeles?
Use our free lookup tool to get a personalized answer based on your specific project details.
Free Permit Lookup →Other Permit Guides for Los Angeles, CA
Explore more permit guides for Los Angeles:
Shed Permits in Nearby Cities
See shed permit requirements in other California cities:
See Detailed Shed Rules for Los Angeles
View all local rules, exemptions, and fee details on the permit page.
Shed Permit Rules →