Permit history for 500 Boylston St
Boston, MA · 500 permits on file · 2017–2026
500
Permits on file
2017
First permit
2026
Most recent
154
Unique contractors
$189,143,363
Declared value (all work)
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
Apr 2, 2026
Declared cost: $568,000
Permit fee: $360
Apr 2, 2026
Declared cost: $35,000
Permit fee: $370
Apr 2, 2026
Declared cost: $86,000
Permit fee: $110
Mar 2, 2026
Declared cost: $20,502
Permit fee: $20
Feb 27, 2026
Declared cost: $4,800,000
Permit fee: $48,510
Feb 13, 2026
Declared cost: $200,000
Permit fee: $221
Feb 13, 2026
Declared cost: $12,000
Permit fee: $140
Feb 11, 2026
Declared cost: $15,000
Permit fee: $280
Dec 1, 2025
Declared cost: $10,070,692
Permit fee: $6,440
Nov 25, 2025
Declared cost: $7,997,587
Permit fee: $270
Nov 24, 2025
Permit fee: $100
Nov 20, 2025
Declared cost: $308,157
Permit fee: $260
Oct 30, 2025
Declared cost: $540,000
Permit fee: $1,035
Oct 16, 2025
Permit fee: $50
Oct 8, 2025
Declared cost: $40,000
Permit fee: $420
Sep 30, 2025
Declared cost: $3,008
Permit fee: $60
Sep 26, 2025
Declared cost: $32,000
Permit fee: $94
Sep 26, 2025
Declared cost: $7,000
Permit fee: $90
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Sep 19, 2025
Declared cost: $45,000
Permit fee: $470
Sep 11, 2025
Declared cost: $11,260
Permit fee: $140
Sep 9, 2025
Declared cost: $10,500
Permit fee: $40
Sep 8, 2025
Declared cost: $8,000
Permit fee: $25
Aug 26, 2025
Declared cost: $22,600
Permit fee: $500
Aug 26, 2025
Declared cost: $8,200
Permit fee: $285
Aug 25, 2025
Declared cost: $29,618
Permit fee: $350
Aug 25, 2025
Declared cost: $9,200
Permit fee: $45
Aug 22, 2025
Declared cost: $19,500
Permit fee: $791
Aug 22, 2025
Declared cost: $2,500
Permit fee: $50
Aug 21, 2025
Declared cost: $98,300
Permit fee: $900
Aug 21, 2025
Declared cost: $7,400
Permit fee: $350
Aug 21, 2025
Declared cost: $3,000
Permit fee: $50
Aug 12, 2025
Declared cost: $247,369
Permit fee: $3,440
Aug 12, 2025
Declared cost: $350,000
Permit fee: $692
Aug 12, 2025
Declared cost: $53,000
Permit fee: $550
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
charles BOISVERT
Status: Closed
Aug 7, 2025
Declared cost: $379,834
Permit fee: $4,260
Aug 4, 2025
Declared cost: $48,500
Permit fee: $315
Jul 31, 2025
Declared cost: $2,250,000
Permit fee: $23,510
Jul 31, 2025
Declared cost: $1,702,000
Permit fee: $17,355
Jul 16, 2025
Declared cost: $41,000
Permit fee: $320
Jul 9, 2025
Declared cost: $20,000
Permit fee: $220
Jul 8, 2025
Declared cost: $250,000
Permit fee: $2,520
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Jul 1, 2025
Declared cost: $540,000
Permit fee: $5,860
Jun 30, 2025
Declared cost: $20,000
Permit fee: $220
Jun 18, 2025
Declared cost: $1,849,575
Permit fee: $954
Jun 12, 2025
Permit fee: $20
Jun 12, 2025
Declared cost: $480,125
Permit fee: $5,045
May 20, 2025
Declared cost: $500,000
Permit fee: $3,090
Apr 30, 2025
Declared cost: $11,480
Permit fee: $170
Apr 29, 2025
Declared cost: $2,043,487
Permit fee: $20,620
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
Apr 28, 2025
Declared cost: $53,000
Permit fee: $550
Apr 17, 2025
Declared cost: $18,000
Permit fee: $450
Mar 18, 2025
Declared cost: $45,000
Permit fee: $310
Mar 13, 2025
Declared cost: $30,000
Permit fee: $290
Mar 10, 2025
Declared cost: $4,500
Permit fee: $320
Mar 10, 2025
Declared cost: $22,697
Permit fee: $250
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Open
Mar 7, 2025
Declared cost: $159,000
Permit fee: $2,050
Mar 5, 2025
Declared cost: $25,000
Permit fee: $270
Feb 24, 2025
Declared cost: $16,000
Permit fee: $180
Feb 21, 2025
Declared cost: $45,000
Permit fee: $470
Feb 19, 2025
Declared cost: $15,125
Permit fee: $180
Feb 18, 2025
Declared cost: $298,000
Permit fee: $756
Feb 18, 2025
Declared cost: $14,000
Permit fee: $160
Feb 14, 2025
Declared cost: $12,000
Permit fee: $390
Feb 14, 2025
Declared cost: $3,000
Permit fee: $50
Feb 7, 2025
Declared cost: $20,000
Permit fee: $220
Feb 5, 2025
Declared cost: $54,000
Permit fee: $325
Jan 31, 2025
Declared cost: $45,438
Permit fee: $510
Jan 27, 2025
Declared cost: $44,000
Permit fee: $460
Jan 22, 2025
Declared cost: $600,000
Permit fee: $471
Jan 17, 2025
Declared cost: $1,500
Permit fee: $50
Jan 14, 2025
Declared cost: $22,000
Permit fee: $25
Jan 14, 2025
Declared cost: $6,500
Permit fee: $25
Jan 10, 2025
Declared cost: $85,000
Permit fee: $104
Jan 10, 2025
Declared cost: $2,500
Permit fee: $50
Jan 8, 2025
Declared cost: $1,849,575
Permit fee: $19,835
Nov 20, 2024
Declared cost: $32,000
Permit fee: $840
Nov 15, 2024
Declared cost: $4,000
Permit fee: $310
Nov 15, 2024
Declared cost: $19,000
Permit fee: $460
Nov 8, 2024
Permit fee: $50
Nov 7, 2024
Declared cost: $592,500
Permit fee: $1,115
Oct 24, 2024
Declared cost: $712,000
Permit fee: $952
Oct 23, 2024
Declared cost: $1,656,984
Permit fee: $1,612
Oct 22, 2024
Declared cost: $310,000
Permit fee: $8,680
Oct 9, 2024
Declared cost: $130,000
Permit fee: $270
Oct 4, 2024
Declared cost: $500,000
Permit fee: $5,510
Oct 3, 2024
Declared cost: $3,000
Permit fee: $50
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Nicholas Tuttle
Status: Open
Sep 30, 2024
Declared cost: $25,281
Permit fee: $720
Sep 17, 2024
Declared cost: $33,413
Permit fee: $360
Sep 3, 2024
Declared cost: $31,000
Permit fee: $580
Aug 26, 2024
Declared cost: $7,997,587
Permit fee: $80,990
Aug 21, 2024
Declared cost: $57,585
Permit fee: $823
Aug 21, 2024
Declared cost: $5,340
Permit fee: $80
Aug 8, 2024
Declared cost: $19,500
Permit fee: $220
Aug 7, 2024
Declared cost: $12,500
Permit fee: $282
Aug 7, 2024
Declared cost: $1,000
Permit fee: $25
Aug 5, 2024
Declared cost: $325,000
Permit fee: $3,935
Aug 2, 2024
Declared cost: $127,557
Permit fee: $700
Aug 1, 2024
Declared cost: $130,000
Permit fee: $1,760
Jul 29, 2024
Declared cost: $24,448
Permit fee: $300
Jul 29, 2024
Declared cost: $209,548
Permit fee: $2,620
Jul 16, 2024
Declared cost: $8,389
Permit fee: $110
Jul 15, 2024
Declared cost: $6,595
Permit fee: $90
Jun 20, 2024
Declared cost: $22,000
Permit fee: $40
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Jun 14, 2024
Declared cost: $2,500
Permit fee: $50
Jun 7, 2024
Declared cost: $1,656,984
Permit fee: $17,780
May 28, 2024
Declared cost: $115,000
Permit fee: $160
May 20, 2024
Declared cost: $325,000
Permit fee: $3,520
May 15, 2024
Declared cost: $2,601,644
Permit fee: $1,560
May 10, 2024
Declared cost: $100,000
Permit fee: $138
May 9, 2024
Declared cost: $308,157
Permit fee: $3,800
Apr 26, 2024
Declared cost: $50,362
Permit fee: $309
Apr 26, 2024
Declared cost: $28,960
Permit fee: $310
Apr 22, 2024
Declared cost: $310,000
Permit fee: $3,610
Apr 9, 2024
Declared cost: $6,000
Permit fee: $330
Apr 8, 2024
Declared cost: $2,500
Permit fee: $50
Apr 5, 2024
Declared cost: $2,649
Permit fee: $50
Mar 8, 2024
Declared cost: $6,500
Permit fee: $340
Mar 8, 2024
Declared cost: $7,500
Permit fee: $100
Mar 8, 2024
Declared cost: $19,000
Permit fee: $210
Mar 6, 2024
Declared cost: $45,700
Permit fee: $480
Feb 23, 2024
Declared cost: $30,000
Permit fee: $320
Feb 22, 2024
Declared cost: $60,000
Permit fee: $25
Feb 14, 2024
Declared cost: $50,000
Permit fee: $520
Feb 8, 2024
Declared cost: $15,781
Permit fee: $180
Feb 7, 2024
Declared cost: $325,000
Permit fee: $328
Feb 7, 2024
Declared cost: $32,000
Permit fee: $590
Feb 6, 2024
Declared cost: $450,000
Permit fee: $535
Feb 3, 2024
Declared cost: $26,000
Permit fee: $35
Feb 2, 2024
Declared cost: $120,000
Permit fee: $37
Jan 29, 2024
Declared cost: $1,500
Permit fee: $21
Jan 9, 2024
Declared cost: $509,699
Permit fee: $5,810
Dec 6, 2023
Declared cost: $150,000
Permit fee: $1,520
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
Nov 17, 2023
Declared cost: $99,533
Permit fee: $1,520
Nov 7, 2023
Declared cost: $50,000
Permit fee: $41
Nov 7, 2023
Declared cost: $10,000
Permit fee: $120
Nov 6, 2023
Declared cost: $220,000
Permit fee: $125
Nov 3, 2023
Declared cost: $17,900
Permit fee: $543
Nov 2, 2023
Declared cost: $100,000
Permit fee: $30
Oct 30, 2023
Declared cost: $40,000
Permit fee: $369
Oct 10, 2023
Declared cost: $5,600
Permit fee: $30
Oct 7, 2023
Declared cost: $5,600
Permit fee: $30
Sep 19, 2023
Declared cost: $102,000
Permit fee: $1,040
Sep 19, 2023
Declared cost: $31,000
Permit fee: $580
Sep 18, 2023
Declared cost: $1,216,318
Permit fee: $12,190
Aug 30, 2023
Declared cost: $2,601,644
Permit fee: $26,230
Aug 15, 2023
Declared cost: $30,000
Permit fee: $289
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
Jul 18, 2023
Declared cost: $139,272
Permit fee: $1,670
Jun 27, 2023
Declared cost: $450,000
Permit fee: $5,710
Jun 5, 2023
Declared cost: $3,200
Permit fee: $60
May 22, 2023
Declared cost: $5,500
Permit fee: $80
May 16, 2023
Declared cost: $100,000
Permit fee: $1,020
May 9, 2023
Declared cost: $12,000
Permit fee: $44
May 3, 2023
Declared cost: $307,603
Permit fee: $289
May 3, 2023
Declared cost: $47,000
Permit fee: $295
Apr 24, 2023
Declared cost: $83,887
Permit fee: $1,110
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Charles Boisvert
Status: Closed
Apr 13, 2023
Declared cost: $1
Permit fee: $1,020
Apr 6, 2023
Declared cost: $24,000
Permit fee: $38
Feb 17, 2023
Declared cost: $196,000
Permit fee: $210
Jan 12, 2023
Declared cost: $19,000
Permit fee: $210
Dec 20, 2022
Declared cost: $15,000
Permit fee: $28
Dec 20, 2022
Declared cost: $4,000
Permit fee: $310
Dec 6, 2022
Declared cost: $6,500
Permit fee: $522
Dec 1, 2022
Declared cost: $1,144,000
Permit fee: $11,460
Long Form/Alteration Permit INTEXT
Interior/exterior work
Contractor:
Charles R Boisvert
Status: Open
Nov 29, 2022
Declared cost: $1,049,475
Permit fee: $12,385
Nov 15, 2022
Declared cost: $50,000
Permit fee: $920
Nov 9, 2022
Declared cost: $15,000
Permit fee: $36
Nov 8, 2022
Declared cost: $10,000
Permit fee: $280
Nov 4, 2022
Declared cost: $196,000
Permit fee: $2,670
Nov 4, 2022
Declared cost: $150,000
Permit fee: $319
Oct 26, 2022
Declared cost: $130,000
Permit fee: $1,570
Oct 20, 2022
Declared cost: $471,591
Permit fee: $572
Sep 15, 2022
Declared cost: $22,000
Permit fee: $81
Sep 7, 2022
Declared cost: $3,200
Permit fee: $60
Sep 5, 2022
Declared cost: $640
Permit fee: $30
Aug 9, 2022
Declared cost: $434,531
Permit fee: $270
Jul 26, 2022
Declared cost: $1,000
Permit fee: $25
Jul 22, 2022
Declared cost: $55,000
Permit fee: $48
Jul 22, 2022
Declared cost: $15,000
Permit fee: $170
Jun 8, 2022
Declared cost: $76,925
Permit fee: $1,105
May 16, 2022
Declared cost: $500
Permit fee: $30
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Apr 29, 2022
Declared cost: $3,053,719
Permit fee: $1,628
Apr 29, 2022
Declared cost: $2,650
Permit fee: $50
Apr 25, 2022
Declared cost: $81,900
Permit fee: $203
Apr 19, 2022
Declared cost: $50,000
Permit fee: $40
Apr 13, 2022
Permit fee: $20
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Chris Ferragamo
Status: Closed
Apr 13, 2022
Declared cost: $434,531
Permit fee: $5,660
Apr 8, 2022
Declared cost: $1,000
Permit fee: $25
Apr 4, 2022
Declared cost: $4,082
Permit fee: $70
Apr 1, 2022
Declared cost: $14,000
Permit fee: $35
Mar 16, 2022
Declared cost: $6,550
Permit fee: $90
Mar 11, 2022
Declared cost: $88,000
Permit fee: $594
Mar 11, 2022
Declared cost: $10,500
Permit fee: $130
Mar 2, 2022
Declared cost: $1,200
Permit fee: $40
Mar 1, 2022
Declared cost: $1,450,000
Permit fee: $730
Feb 22, 2022
Declared cost: $81,900
Permit fee: $1,680
Feb 18, 2022
Declared cost: $2,500
Permit fee: $51
Feb 10, 2022
Declared cost: $37,060
Permit fee: $650
Jan 28, 2022
Declared cost: $15,000
Permit fee: $282
Jan 28, 2022
Declared cost: $3,000
Permit fee: $300
Jan 26, 2022
Declared cost: $5,000
Permit fee: $40
Jan 14, 2022
Declared cost: $7,500
Permit fee: $25
Jan 3, 2022
Declared cost: $1,400
Permit fee: $22
Dec 23, 2021
Declared cost: $9,000
Permit fee: $110
Dec 23, 2021
Declared cost: $15,000
Permit fee: $170
Nov 23, 2021
Declared cost: $20,000
Permit fee: $220
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Nov 22, 2021
Declared cost: $52,000
Permit fee: $540
Nov 15, 2021
Declared cost: $4,500
Permit fee: $70
Nov 15, 2021
Declared cost: $10,000
Permit fee: $30
Nov 9, 2021
Declared cost: $1,400,000
Permit fee: $15,885
Nov 9, 2021
Declared cost: $195,000
Permit fee: $836
Nov 9, 2021
Declared cost: $20,400
Permit fee: $480
Nov 9, 2021
Declared cost: $174,942
Permit fee: $1,770
Oct 26, 2021
Declared cost: $35,000
Permit fee: $320
Oct 25, 2021
Declared cost: $114,500
Permit fee: $1,200
Oct 22, 2021
Declared cost: $412,000
Permit fee: $1,419
Oct 22, 2021
Declared cost: $31,000
Permit fee: $580
Oct 15, 2021
Declared cost: $34,775
Permit fee: $370
Sep 30, 2021
Declared cost: $12,000
Permit fee: $140
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Sep 29, 2021
Declared cost: $2,963,719
Permit fee: $33,250
Sep 28, 2021
Declared cost: $7,150
Permit fee: $23
Sep 21, 2021
Declared cost: $50,000
Permit fee: $520
Sep 16, 2021
Declared cost: $5,028,487
Permit fee: $6,054
Aug 30, 2021
Declared cost: $90,000
Permit fee: $1,970
Aug 24, 2021
Declared cost: $7,500
Permit fee: $350
Aug 13, 2021
Declared cost: $18,000
Permit fee: $30
Aug 13, 2021
Declared cost: $20,000
Permit fee: $220
Aug 12, 2021
Declared cost: $7,000
Permit fee: $340
Aug 6, 2021
Declared cost: $1,135,072
Permit fee: $265
Aug 5, 2021
Declared cost: $160,000
Permit fee: $258
Aug 2, 2021
Declared cost: $8,200
Permit fee: $280
Jul 28, 2021
Declared cost: $10,000
Permit fee: $370
Jul 20, 2021
Declared cost: $33,100
Permit fee: $554
Jul 20, 2021
Declared cost: $9,100
Permit fee: $120
Jul 7, 2021
Declared cost: $53,393
Permit fee: $560
Jul 7, 2021
Declared cost: $196,305
Permit fee: $2,490
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Francesca DiRico
Status: Closed
Jun 25, 2021
Declared cost: $3,530,000
Permit fee: $1,960
Jun 25, 2021
Declared cost: $2,000
Permit fee: $40
Jun 23, 2021
Declared cost: $4,500
Permit fee: $70
Jun 22, 2021
Declared cost: $2,000
Permit fee: $40
Jun 16, 2021
Declared cost: $20,000
Permit fee: $220
Jun 14, 2021
Declared cost: $350
Permit fee: $30
Amendment to a Long Form INTREN
Renovations - interior nsc
Contractor:
Connor Benjamin
Status: Closed
Jun 2, 2021
Declared cost: $149,181
Permit fee: $2,805
May 28, 2021
Declared cost: $26,000
Permit fee: $292
May 27, 2021
Declared cost: $2,000
Permit fee: $40
May 25, 2021
Declared cost: $18,000
Permit fee: $280
May 24, 2021
Declared cost: $160,000
Permit fee: $2,560
May 19, 2021
Declared cost: $40,000
Permit fee: $75
May 8, 2021
Declared cost: $25,000
Permit fee: $46
May 5, 2021
Declared cost: $7,000
Permit fee: $90
Apr 29, 2021
Declared cost: $4,500
Permit fee: $70
Apr 22, 2021
Declared cost: $50,000
Permit fee: $520
Mar 16, 2021
Declared cost: $729,278
Permit fee: $445
Mar 1, 2021
Declared cost: $300,000
Permit fee: $361
Feb 26, 2021
Permit fee: $20
Feb 22, 2021
Declared cost: $16,000
Permit fee: $55
Feb 16, 2021
Declared cost: $2,500,000
Permit fee: $1,680
Jan 22, 2021
Declared cost: $214,000
Permit fee: $820
Jan 22, 2021
Declared cost: $29,000
Permit fee: $560
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Connor Benjamin
Status: Closed
Jan 19, 2021
Declared cost: $985,891
Permit fee: $11,620
Jan 15, 2021
Declared cost: $729,278
Permit fee: $270
Jan 6, 2021
Declared cost: $2,342,000
Permit fee: $880
Jan 4, 2021
Declared cost: $120,000
Permit fee: $195
Dec 16, 2020
Declared cost: $5,028,487
Permit fee: $55,700
Dec 9, 2020
Declared cost: $2,342,000
Permit fee: $380
Dec 4, 2020
Declared cost: $200
Permit fee: $30
Dec 3, 2020
Declared cost: $2,500,000
Permit fee: $210
Dec 3, 2020
Declared cost: $2,500,000
Permit fee: $330
Nov 6, 2020
Declared cost: $4,817,562
Permit fee: $48,730
Oct 26, 2020
Declared cost: $7,000,000
Permit fee: $6,650
Oct 26, 2020
Declared cost: $7,000,000
Permit fee: $1,390
Oct 26, 2020
Declared cost: $2,500,000
Permit fee: $960
Oct 13, 2020
Declared cost: $125,000
Permit fee: $1,270
Oct 7, 2020
Declared cost: $80,000
Permit fee: $820
Oct 7, 2020
Declared cost: $4,500
Permit fee: $70
Oct 2, 2020
Declared cost: $5,500
Permit fee: $330
Sep 25, 2020
Declared cost: $700
Permit fee: $30
Sep 24, 2020
Declared cost: $107,800
Permit fee: $1,100
Sep 21, 2020
Declared cost: $500
Permit fee: $30
Sep 17, 2020
Declared cost: $500,000
Permit fee: $160
Sep 16, 2020
Declared cost: $6,500
Permit fee: $90
Sep 12, 2020
Declared cost: $13,000
Permit fee: $95
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Pasquarello Joseph
Status: Open
Sep 8, 2020
Declared cost: $1,208,575
Permit fee: $12,110
Sep 2, 2020
Declared cost: $18,000
Permit fee: $450
Aug 27, 2020
Declared cost: $426,442
Permit fee: $4,780
Aug 18, 2020
Declared cost: $87,000
Permit fee: $342
Aug 18, 2020
Declared cost: $6,500
Permit fee: $90
Aug 18, 2020
Declared cost: $5,500
Permit fee: $80
Aug 5, 2020
Declared cost: $5,000
Permit fee: $70
Jul 28, 2020
Declared cost: $19,000
Permit fee: $210
Jul 27, 2020
Declared cost: $15,450
Permit fee: $680
Jul 20, 2020
Declared cost: $8,700
Permit fee: $45
Jul 8, 2020
Declared cost: $138,249
Permit fee: $438
Jul 6, 2020
Declared cost: $2,000
Permit fee: $40
Jul 1, 2020
Declared cost: $729,278
Permit fee: $8,925
Jun 30, 2020
Declared cost: $15,000
Permit fee: $305
Jun 23, 2020
Declared cost: $106,364
Permit fee: $1,090
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Jun 19, 2020
Declared cost: $2,342,000
Permit fee: $25,740
Jun 15, 2020
Declared cost: $5,093
Permit fee: $80
Jun 12, 2020
Declared cost: $38,000
Permit fee: $320
Jun 12, 2020
Declared cost: $4,500
Permit fee: $320
Jun 10, 2020
Declared cost: $510,000
Permit fee: $1,029
Jun 10, 2020
Declared cost: $35,000
Permit fee: $370
May 26, 2020
Declared cost: $500,000
Permit fee: $6,210
Apr 3, 2020
Declared cost: $50,000
Permit fee: $360
Mar 12, 2020
Declared cost: $20,000
Permit fee: $220
Mar 11, 2020
Declared cost: $1,200
Permit fee: $40
Mar 6, 2020
Declared cost: $18,000
Permit fee: $200
Mar 5, 2020
Declared cost: $1,400,000
Permit fee: $270
Mar 5, 2020
Declared cost: $734,000
Permit fee: $270
Mar 4, 2020
Declared cost: $7,000
Permit fee: $26
Mar 2, 2020
Declared cost: $70,682
Permit fee: $730
Feb 24, 2020
Declared cost: $2,000
Permit fee: $26
Jan 31, 2020
Declared cost: $18,000
Permit fee: $450
Jan 28, 2020
Declared cost: $21,000
Permit fee: $230
Jan 28, 2020
Declared cost: $1,800
Permit fee: $40
Jan 24, 2020
Declared cost: $3,000
Permit fee: $25
Jan 22, 2020
Declared cost: $15,000
Permit fee: $110
Jan 6, 2020
Declared cost: $67,576
Permit fee: $700
Jan 3, 2020
Declared cost: $523,000
Permit fee: $320
Jan 3, 2020
Declared cost: $33,000
Permit fee: $600
Dec 23, 2019
Declared cost: $2,500,000
Permit fee: $28,930
Dec 16, 2019
Declared cost: $25,000
Permit fee: $40
Dec 6, 2019
Declared cost: $1,500
Permit fee: $40
Dec 3, 2019
Declared cost: $10,000
Permit fee: $26
Nov 27, 2019
Declared cost: $250,000
Permit fee: $768
Nov 20, 2019
Declared cost: $500
Permit fee: $30
Oct 28, 2019
Declared cost: $3,000
Permit fee: $50
Oct 24, 2019
Declared cost: $2,500
Permit fee: $22
Oct 18, 2019
Declared cost: $18,200
Permit fee: $35
Oct 15, 2019
Declared cost: $23,000
Permit fee: $250
Oct 10, 2019
Declared cost: $55,000
Permit fee: $570
Oct 9, 2019
Declared cost: $241,000
Permit fee: $298
Oct 9, 2019
Declared cost: $9,000
Permit fee: $110
Oct 8, 2019
Declared cost: $1,400,000
Permit fee: $15,067
Oct 3, 2019
Declared cost: $850
Permit fee: $30
Sep 26, 2019
Declared cost: $15,000
Permit fee: $170
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Francesca DiRico
Status: Closed
Sep 25, 2019
Permit fee: $760
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Sep 23, 2019
Declared cost: $15,000
Permit fee: $170
Sep 16, 2019
Declared cost: $5,271
Permit fee: $80
Sep 10, 2019
Declared cost: $50,000
Permit fee: $84
Aug 26, 2019
Declared cost: $20,000
Permit fee: $220
Aug 16, 2019
Declared cost: $10,000
Permit fee: $120
Aug 6, 2019
Declared cost: $250,000
Permit fee: $2,824
Jul 31, 2019
Declared cost: $165,000
Permit fee: $1,670
Jul 23, 2019
Declared cost: $6,400
Permit fee: $50
Jul 12, 2019
Declared cost: $30,000
Permit fee: $320
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Jul 12, 2019
Declared cost: $6,000
Permit fee: $80
Jul 10, 2019
Declared cost: $226,234
Permit fee: $2,290
Jun 21, 2019
Declared cost: $16,500
Permit fee: $190
Jun 20, 2019
Declared cost: $2,950
Permit fee: $50
Jun 18, 2019
Declared cost: $250,000
Permit fee: $1,890
Jun 13, 2019
Declared cost: $10,649
Permit fee: $130
Jun 11, 2019
Declared cost: $7,500
Permit fee: $100
Jun 6, 2019
Declared cost: $6,100
Permit fee: $45
May 21, 2019
Declared cost: $45,000
Permit fee: $470
May 20, 2019
Declared cost: $97,000
Permit fee: $142
May 16, 2019
Declared cost: $734,000
Permit fee: $8,295
May 9, 2019
Declared cost: $1,264,442
Permit fee: $380
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Maria Theodorou-Hallacoglu
Status: Closed
May 3, 2019
Declared cost: $339,936
Permit fee: $160
Apr 25, 2019
Declared cost: $500
Permit fee: $30
Apr 24, 2019
Declared cost: $325,000
Permit fee: $3,270
Apr 12, 2019
Declared cost: $12,000
Permit fee: $140
Apr 12, 2019
Declared cost: $28,000
Permit fee: $85
Mar 28, 2019
Declared cost: $19,035
Permit fee: $220
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Mar 27, 2019
Declared cost: $15,000
Permit fee: $170
Mar 26, 2019
Declared cost: $3,900
Permit fee: $60
Mar 26, 2019
Declared cost: $40,000
Permit fee: $420
Mar 25, 2019
Declared cost: $8,000
Permit fee: $28
Mar 25, 2019
Declared cost: $5,000
Permit fee: $70
Mar 22, 2019
Declared cost: $94,001
Permit fee: $970
Mar 21, 2019
Declared cost: $400,000
Permit fee: $320
Mar 21, 2019
Declared cost: $30,000
Permit fee: $320
Mar 21, 2019
Declared cost: $40,000
Permit fee: $420
Mar 21, 2019
Declared cost: $5,500
Permit fee: $55
Mar 20, 2019
Declared cost: $8,000
Permit fee: $100
Mar 11, 2019
Declared cost: $10,000
Permit fee: $120
Mar 8, 2019
Declared cost: $35,000
Permit fee: $370
Mar 7, 2019
Declared cost: $2,500,000
Permit fee: $27,355
Feb 22, 2019
Declared cost: $63,000
Permit fee: $95
Feb 22, 2019
Declared cost: $11,000
Permit fee: $130
Feb 20, 2019
Declared cost: $100,000
Permit fee: $1,210
Feb 14, 2019
Declared cost: $355,860
Permit fee: $763
Feb 14, 2019
Declared cost: $2,500
Permit fee: $50
Feb 14, 2019
Declared cost: $40,000
Permit fee: $420
Feb 13, 2019
Declared cost: $11,500
Permit fee: $95
Feb 1, 2019
Declared cost: $1,180
Permit fee: $40
Feb 1, 2019
Declared cost: $2,000
Permit fee: $40
Feb 1, 2019
Declared cost: $12,700
Permit fee: $150
Jan 31, 2019
Declared cost: $100,000
Permit fee: $65
Jan 31, 2019
Declared cost: $25,000
Permit fee: $270
Jan 30, 2019
Declared cost: $7,200
Permit fee: $100
Jan 30, 2019
Declared cost: $30,000
Permit fee: $40
Jan 29, 2019
Declared cost: $1,264,442
Permit fee: $12,860
Jan 29, 2019
Declared cost: $275,000
Permit fee: $634
Jan 29, 2019
Declared cost: $20,000
Permit fee: $220
Jan 18, 2019
Declared cost: $59,000
Permit fee: $89
Jan 18, 2019
Declared cost: $10,000
Permit fee: $85
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Maria Theodorou-Hallacoglu
Status: Open
Jan 17, 2019
Declared cost: $339,936
Permit fee: $4,159
Jan 14, 2019
Declared cost: $1,000
Permit fee: $30
Jan 9, 2019
Declared cost: $1,500
Permit fee: $21
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Joseph Pasquarello
Status: Open
Dec 28, 2018
Declared cost: $715,830
Permit fee: $7,180
Dec 18, 2018
Declared cost: $5,000
Permit fee: $70
Dec 18, 2018
Declared cost: $4,967
Permit fee: $70
Dec 18, 2018
Declared cost: $9,500
Permit fee: $120
Dec 12, 2018
Declared cost: $12,000
Permit fee: $140
Nov 28, 2018
Declared cost: $100,000
Permit fee: $1,020
Nov 21, 2018
Declared cost: $10,000
Permit fee: $38
Nov 20, 2018
Declared cost: $50,000
Permit fee: $1,035
Nov 20, 2018
Declared cost: $138,605
Permit fee: $1,410
Nov 19, 2018
Declared cost: $75,000
Permit fee: $770
Nov 14, 2018
Declared cost: $6,200
Permit fee: $90
Nov 9, 2018
Declared cost: $30,000
Permit fee: $320
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Gilbane Building Company
Status: Open
Nov 9, 2018
Declared cost: $160,000
Permit fee: $1,620
Nov 8, 2018
Declared cost: $1,700
Permit fee: $40
Nov 2, 2018
Declared cost: $1,500
Permit fee: $25
Oct 31, 2018
Declared cost: $259,723
Permit fee: $210
Oct 26, 2018
Declared cost: $1,750,000
Permit fee: $320
Oct 24, 2018
Declared cost: $42,000
Permit fee: $112
Oct 24, 2018
Declared cost: $5,000
Permit fee: $70
Oct 23, 2018
Declared cost: $3,500
Permit fee: $60
Oct 23, 2018
Declared cost: $3,500
Permit fee: $60
Oct 18, 2018
Declared cost: $20,000
Permit fee: $220
Oct 17, 2018
Declared cost: $700,000
Permit fee: $8,935
Oct 17, 2018
Declared cost: $355,860
Permit fee: $4,683
Oct 17, 2018
Declared cost: $30,000
Permit fee: $320
Oct 12, 2018
Declared cost: $20,000
Permit fee: $49
Sep 27, 2018
Declared cost: $7,000,000
Permit fee: $74,595
Sep 24, 2018
Declared cost: $110,000
Permit fee: $1,120
Sep 12, 2018
Declared cost: $185,000
Permit fee: $125
Aug 22, 2018
Declared cost: $1,077,034
Permit fee: $400
Aug 21, 2018
Declared cost: $79,000
Permit fee: $810
Aug 16, 2018
Declared cost: $8,000,000
Permit fee: $80,227
Aug 14, 2018
Declared cost: $600,000
Permit fee: $370
Aug 14, 2018
Declared cost: $40,000
Permit fee: $420
Aug 14, 2018
Declared cost: $12,000
Permit fee: $140
Aug 9, 2018
Declared cost: $3,800
Permit fee: $25
Aug 7, 2018
Declared cost: $25,000
Permit fee: $34
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Francesca DiRico
Status: Open
Aug 3, 2018
Declared cost: $3,530,000
Permit fee: $39,435
Aug 3, 2018
Declared cost: $150,000
Permit fee: $1,520
Aug 2, 2018
Declared cost: $112,000
Permit fee: $33
Jul 25, 2018
Declared cost: $50,000
Permit fee: $40
Jul 24, 2018
Permit fee: $1,123
Jul 18, 2018
Declared cost: $3,600
Permit fee: $60
Jul 10, 2018
Declared cost: $15,000
Permit fee: $170
Jul 10, 2018
Declared cost: $100,000
Permit fee: $1,020
Jul 10, 2018
Declared cost: $300,000
Permit fee: $3,020
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
David Corderman
Status: Closed
Jun 20, 2018
Declared cost: $250,000
Permit fee: $3,337
Jun 18, 2018
Declared cost: $18,000
Permit fee: $90
Jun 18, 2018
Declared cost: $5,000
Permit fee: $70
Jun 12, 2018
Declared cost: $21,000
Permit fee: $89
Jun 12, 2018
Declared cost: $4,000
Permit fee: $60
Jun 11, 2018
Declared cost: $1,675
Permit fee: $40
Jun 11, 2018
Declared cost: $12,000
Permit fee: $80
Jun 4, 2018
Declared cost: $45,000
Permit fee: $150
Jun 4, 2018
Declared cost: $12,500
Permit fee: $25
Jun 1, 2018
Declared cost: $15,400
Permit fee: $180
May 31, 2018
Declared cost: $236,100
Permit fee: $5,935
May 31, 2018
Declared cost: $30,000
Permit fee: $320
May 31, 2018
Declared cost: $12,000
Permit fee: $80
May 30, 2018
Declared cost: $9,200
Permit fee: $120
May 23, 2018
Declared cost: $1,600
Permit fee: $40
May 21, 2018
Declared cost: $23,623
Permit fee: $260
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Victoria Armishaw
Status: Closed
May 15, 2018
Declared cost: $502,300
Permit fee: $818
May 14, 2018
Declared cost: $9,700
Permit fee: $55
Amendment to a Long Form INTREN
Renovations - interior nsc
Contractor:
Victoria Armishaw
Status: Closed
May 8, 2018
Declared cost: $2,300
Permit fee: $65
May 3, 2018
Declared cost: $3,000
Permit fee: $50
Apr 30, 2018
Declared cost: $150,000
Permit fee: $272
Apr 30, 2018
Declared cost: $13,000
Permit fee: $150
Apr 30, 2018
Declared cost: $10,000
Permit fee: $120
Apr 27, 2018
Declared cost: $5,000
Permit fee: $70
Apr 13, 2018
Permit fee: $207
Apr 11, 2018
Declared cost: $1,077,034
Permit fee: $22,655
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Victoria Armishaw
Status: Closed
Mar 15, 2018
Declared cost: $350,000
Permit fee: $1,580
Feb 28, 2018
Declared cost: $250,000
Permit fee: $210
Feb 28, 2018
Declared cost: $250,000
Permit fee: $160
Feb 28, 2018
Declared cost: $9,500
Permit fee: $120
Feb 13, 2018
Declared cost: $10,000
Permit fee: $35
Feb 12, 2018
Declared cost: $10,000
Permit fee: $35
Jan 29, 2018
Declared cost: $8,500
Permit fee: $110
Jan 10, 2018
Declared cost: $48,675
Permit fee: $596
Jan 5, 2018
Declared cost: $700
Permit fee: $30
Jan 5, 2018
Declared cost: $15,000
Permit fee: $30
Jan 4, 2018
Declared cost: $15,000
Permit fee: $40
Dec 29, 2017
Declared cost: $443,000
Permit fee: $198
Dec 20, 2017
Declared cost: $90,000
Permit fee: $186
Dec 20, 2017
Declared cost: $65,000
Permit fee: $182
Dec 20, 2017
Declared cost: $20,000
Permit fee: $220
Dec 20, 2017
Declared cost: $20,000
Permit fee: $220
Dec 15, 2017
Declared cost: $7,500
Permit fee: $100
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
NATHAN WEEMAN
Status: Closed
Dec 5, 2017
Declared cost: $500,000
Permit fee: $5,339
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
NATHAN WEEMAN
Status: Closed
Dec 5, 2017
Declared cost: $350,000
Permit fee: $3,839
Nov 28, 2017
Declared cost: $250,000
Permit fee: $3,730
Nov 28, 2017
Declared cost: $1,500
Permit fee: $40
Nov 9, 2017
Declared cost: $900
Permit fee: $30
Nov 6, 2017
Declared cost: $2,500
Permit fee: $50
Nov 1, 2017
Declared cost: $130,000
Permit fee: $1,320
Oct 30, 2017
Declared cost: $20,000
Permit fee: $34
Oct 25, 2017
Declared cost: $271,850
Permit fee: $403
Oct 25, 2017
Declared cost: $13,000
Permit fee: $150
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Ralph D'Antonio
Status: Closed
Oct 24, 2017
Declared cost: $348,118
Permit fee: $5,469
Disclaimer: Permit data comes from Boston's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Boston building department before buying, selling, or planning work.