Kevin Flaherty

Public permit-pulling record, Massachusetts. Actively filing permits (most recent: 2026-04-02).

938 Permits filed
1 City worked in
2010 First permit on record

Permits filed by year

Volume trend in Massachusetts.

32 2010 49 2011 66 2012 58 2013 97 2014 80 2015 64 2016 53 2017 55 2018 68 2019 48 2020 55 2021 53 2022 59 2023 54 2024 33 2025 14 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Kevin Flaherty's public permit-pulling record in Massachusetts. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Massachusetts)

Permit counts per city for Kevin Flaherty.

Boston 938 permits

Most common project types

Based on permit_type codes in the underlying city data.

Electrical Low Voltage 936
Short Form Bldg Permit 1
Long Form/alteration Permit 1

Recent permits

The 20 most recent permits filed by Kevin Flaherty across all Massachusetts cities.

Date City Type Status Value
2026-04-02 Boston Electrical Low Voltage Open $2,000
2026-03-24 Boston Electrical Low Voltage Open $6,500
2026-03-13 Boston Electrical Low Voltage Open $1,200
2026-03-02 Boston Electrical Low Voltage Open $8,750
2026-02-11 Boston Electrical Low Voltage Open $5,250
2026-02-09 Boston Electrical Low Voltage Open $8,000
2026-01-27 Boston Electrical Low Voltage Open $2,100
2026-01-23 Boston Electrical Low Voltage Open $6,500
2026-01-23 Boston Electrical Low Voltage Open $6,850
2026-01-22 Boston Electrical Low Voltage Closed $3,200
2026-01-22 Boston Electrical Low Voltage Open $4,300
2026-01-15 Boston Electrical Low Voltage Open $18,500
2026-01-08 Boston Electrical Low Voltage Open $5,800
2026-01-07 Boston Electrical Low Voltage Open $5,900
2025-12-31 Boston Electrical Low Voltage Closed $9,500
2025-12-15 Boston Electrical Low Voltage Closed $6,200
2025-11-17 Boston Electrical Low Voltage Closed $9,200
2025-11-13 Boston Electrical Low Voltage Closed $9,680
2025-11-06 Boston Electrical Low Voltage Closed $4,500
2025-11-06 Boston Electrical Low Voltage Open $8,960

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Massachusetts?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.