Paul Guarracino

Public permit-pulling record, Massachusetts. Last permit filed 2020-03-12.

1,334 Permits filed
1 City worked in
2010 First permit on record

Permits filed by year

Volume trend in Massachusetts.

71 2010 182 2011 159 2012 235 2013 293 2014 280 2015 75 2016 7 2017 30 2018 1 2019 1 2020

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Paul Guarracino's public permit-pulling record in Massachusetts. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Massachusetts)

Permit counts per city for Paul Guarracino.

Boston 1,334 permits

Most common project types

Based on permit_type codes in the underlying city data.

Electrical Low Voltage 1,188
Electrical Permit 134
Electrical Fire Alarms 11
Short Form Bldg Permit 1

Recent permits

The 20 most recent permits filed by Paul Guarracino across all Massachusetts cities.

Date City Type Status Value
2020-03-12 Boston Electrical Low Voltage Open $11,800
2019-01-25 Boston Electrical Low Voltage Open $24,270
2018-12-28 Boston Electrical Low Voltage Closed $490
2018-12-28 Boston Electrical Low Voltage Open $40,000
2018-11-09 Boston Electrical Low Voltage Open $256,500
2018-09-07 Boston Electrical Low Voltage Open $1,250
2018-09-07 Boston Electrical Low Voltage Open $10,000
2018-09-07 Boston Electrical Low Voltage Open $30,000
2018-06-04 Boston Electrical Low Voltage Open $5,000
2018-06-01 Boston Electrical Low Voltage Open $15,400
2018-06-01 Boston Electrical Low Voltage Open $59,500
2018-06-01 Boston Electrical Low Voltage Open $4,000
2018-05-30 Boston Electrical Low Voltage Closed $30,000
2018-05-30 Boston Electrical Low Voltage Closed $400,000
2018-05-24 Boston Electrical Permit Open $10,000
2018-05-24 Boston Electrical Low Voltage Open $4,890
2018-05-24 Boston Electrical Low Voltage Open $14,500
2018-05-24 Boston Electrical Low Voltage Open $37,500
2018-05-17 Boston Electrical Low Voltage Open $27,845
2018-05-17 Boston Electrical Low Voltage Open $67,500

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Massachusetts?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.