Shed Permit Requirements in Town of Edgewood, NM
The Town of Edgewood Planning & Zoning Department issues building (structural) permits within incorporated town limits. New Mexico uses a split permitting system: (1) Building permits are issued locally by the town; (2) Electrical, plumbing, mechanical/HVAC, and LP gas permits are issued at the STATE level by the New Mexico Construction Industries Division (CID), not by the town. CID Santa Fe Regional Office at 2550 Cerrillos Road, 3rd Floor, Santa Fe NM 87505, (505) 476-4700. CID Albuquerque Regional Office at 5500 San Antonio Dr, Suite F, Albuquerque NM 87109, (505) 222-9800. New Mexico adopted the 2021 NMRBC (based on 2021 IRC with state amendments), 14.7.3 NMAC, effective July 14, 2023. Elevation ~6,700 ft, IECC Climate Zone 5B. Contractor licensing through NM CID (GB-2 residential, GB-98 general building, EE-98 electrical, MM-98 HVAC, MS-1/MS-3 plumbing) for work over $7,200/year. Owner-builder permits permitted under 14.5.2.18 NMAC for primary residences (2-year occupancy requirement post-CO). Edgewood also requires a local Business Registration under Ordinance 2023-008 for any business operating in town. IMPORTANT MULTI-COUNTY BOUNDARY: Edgewood straddles Santa Fe, Bernalillo, Sandoval, and Torrance counties via annexation. Town hall and most town area is in Santa Fe County. Parcels outside incorporated town limits fall under the respective county (Santa Fe County Public Works & Permits, Torrance County Planning & Zoning at (505) 544-4393, or the appropriate county). Santa Fe County terrain management rules (slope/drainage analysis, stamped plans) apply to town-area parcels on steep slopes. Wildland-Urban Interface / defensible-space rules apply per Santa Fe County Ordinance 2023-06 adopting 2021 IWUIC; Edgewood is high-desert pinyon-juniper and wildfire-prone. Most properties use private well + septic (no municipal sewer); Liquid Waste Permit from NM Environment Department required (50 ft well-to-tank, 100 ft well-to-drainfield spacing minimum).
By Joey, Founder · Last verified April 24, 2026 · How we research →
When you don’t need a Shed permit in Town of Edgewood
A detached accessory shed of 200 square feet or less without electrical or plumbing is exempt from a building permit under 2021 NMRBC R105.2. Town zoning setbacks and lot-coverage limits apply. Adding electrical later triggers a state CID electrical permit (not town-issued).
When you need a Shed permit in Town of Edgewood
A shed larger than 200 square feet requires a building permit from the Town Planning & Zoning Department. Submit site plan showing setbacks, footprint, and foundation detail to 171-A State Road 344. Call (505) 286-4518 for the frost depth required for footings at this 6,700-ft elevation.
Shed Permit Costs: Town of Edgewood vs. Nearby
| City | Estimated Fee |
|---|---|
| Town of Edgewood | N/A |
| Albuquerque | $50 – $300 |
| Las Cruces | $40 – $240 |
| Rio Rancho | $40 – $255 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Town of Edgewood permit costs →
Zoning Considerations
Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.
Estimated Project Timeline in Town of Edgewood
Here's a typical timeline for a shed project in Town of Edgewood, NM:
Timeline is based on Town of Edgewood's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Shed permit in Town of Edgewood, NM?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact Town of Edgewood's building department for current Shed permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Town of Edgewood can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Shed permits in Town of Edgewood is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Shed Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Shed Guide →