Kitchen Remodel Permit Requirements in Town of Edgewood, NM

The Town of Edgewood Planning & Zoning Department issues building (structural) permits within incorporated town limits. New Mexico uses a split permitting system: (1) Building permits are issued locally by the town; (2) Electrical, plumbing, mechanical/HVAC, and LP gas permits are issued at the STATE level by the New Mexico Construction Industries Division (CID), not by the town. CID Santa Fe Regional Office at 2550 Cerrillos Road, 3rd Floor, Santa Fe NM 87505, (505) 476-4700. CID Albuquerque Regional Office at 5500 San Antonio Dr, Suite F, Albuquerque NM 87109, (505) 222-9800. New Mexico adopted the 2021 NMRBC (based on 2021 IRC with state amendments), 14.7.3 NMAC, effective July 14, 2023. Elevation ~6,700 ft, IECC Climate Zone 5B. Contractor licensing through NM CID (GB-2 residential, GB-98 general building, EE-98 electrical, MM-98 HVAC, MS-1/MS-3 plumbing) for work over $7,200/year. Owner-builder permits permitted under 14.5.2.18 NMAC for primary residences (2-year occupancy requirement post-CO). Edgewood also requires a local Business Registration under Ordinance 2023-008 for any business operating in town. IMPORTANT MULTI-COUNTY BOUNDARY: Edgewood straddles Santa Fe, Bernalillo, Sandoval, and Torrance counties via annexation. Town hall and most town area is in Santa Fe County. Parcels outside incorporated town limits fall under the respective county (Santa Fe County Public Works & Permits, Torrance County Planning & Zoning at (505) 544-4393, or the appropriate county). Santa Fe County terrain management rules (slope/drainage analysis, stamped plans) apply to town-area parcels on steep slopes. Wildland-Urban Interface / defensible-space rules apply per Santa Fe County Ordinance 2023-06 adopting 2021 IWUIC; Edgewood is high-desert pinyon-juniper and wildfire-prone. Most properties use private well + septic (no municipal sewer); Liquid Waste Permit from NM Environment Department required (50 ft well-to-tank, 100 ft well-to-drainfield spacing minimum).

By Joey, Founder · Last verified April 24, 2026 · How we research →

Population: 7,411 Code: 2021 NMRBC Verified: 2026-04-24 1 local rules

When you need a Kitchen permit in Town of Edgewood

Required·Rule 1

A kitchen remodel that moves plumbing, adds circuits, or alters structural elements requires a building permit from the Town PLUS separate plumbing and electrical permits from NM CID (state-level). Cabinet-and-countertop swaps without moving any supply, drain, gas, or circuit are typically exempt. NM CID-licensed trades required for plumbing, electrical, and gas work.

Typical Timelineabout 2 weeks
SourceTown of Edgewood Planning & Zoning / NM CID / 2021 NMRBC · view source

Kitchen Remodel Permit Costs: Town of Edgewood vs. Nearby

CityEstimated Fee
Town of Edgewood N/A
Albuquerque $200 – $1,200
Las Cruces $160 – $960
Rio Rancho $170 – $1,020

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Town of Edgewood permit costs →

Estimated Project Timeline in Town of Edgewood

Here's a typical timeline for a kitchen remodel project in Town of Edgewood, NM:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Town of Edgewood's building department, apply online here.
Week 3-4
Plan review & approval
Typical processing time in Town of Edgewood: about 2 weeks. Application review and permit issuance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Town of Edgewood's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Kitchen permit in Town of Edgewood, NM?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameTown of Edgewood Planning & Zoning Department
Address171-A State Road 344, Edgewood, NM 87015
HoursCall (505) 286-4518 for current hours

Frequently Asked Questions

Contact Town of Edgewood's building department for current Kitchen Remodel permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Kitchen Remodel projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Town of Edgewood can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Kitchen Remodel permits in Town of Edgewood is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Kitchen Remodel Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Kitchen Remodel Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-24. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.