Fence Permit Requirements in Town of Edgewood, NM

The Town of Edgewood Planning & Zoning Department issues building (structural) permits within incorporated town limits. New Mexico uses a split permitting system: (1) Building permits are issued locally by the town; (2) Electrical, plumbing, mechanical/HVAC, and LP gas permits are issued at the STATE level by the New Mexico Construction Industries Division (CID), not by the town. CID Santa Fe Regional Office at 2550 Cerrillos Road, 3rd Floor, Santa Fe NM 87505, (505) 476-4700. CID Albuquerque Regional Office at 5500 San Antonio Dr, Suite F, Albuquerque NM 87109, (505) 222-9800. New Mexico adopted the 2021 NMRBC (based on 2021 IRC with state amendments), 14.7.3 NMAC, effective July 14, 2023. Elevation ~6,700 ft, IECC Climate Zone 5B. Contractor licensing through NM CID (GB-2 residential, GB-98 general building, EE-98 electrical, MM-98 HVAC, MS-1/MS-3 plumbing) for work over $7,200/year. Owner-builder permits permitted under 14.5.2.18 NMAC for primary residences (2-year occupancy requirement post-CO). Edgewood also requires a local Business Registration under Ordinance 2023-008 for any business operating in town. IMPORTANT MULTI-COUNTY BOUNDARY: Edgewood straddles Santa Fe, Bernalillo, Sandoval, and Torrance counties via annexation. Town hall and most town area is in Santa Fe County. Parcels outside incorporated town limits fall under the respective county (Santa Fe County Public Works & Permits, Torrance County Planning & Zoning at (505) 544-4393, or the appropriate county). Santa Fe County terrain management rules (slope/drainage analysis, stamped plans) apply to town-area parcels on steep slopes. Wildland-Urban Interface / defensible-space rules apply per Santa Fe County Ordinance 2023-06 adopting 2021 IWUIC; Edgewood is high-desert pinyon-juniper and wildfire-prone. Most properties use private well + septic (no municipal sewer); Liquid Waste Permit from NM Environment Department required (50 ft well-to-tank, 100 ft well-to-drainfield spacing minimum).

By Joey, Founder · Last verified April 24, 2026 · How we research →

Population: 7,411 Code: 2021 NMRBC Verified: 2026-04-24 2 local rules

When you don’t need a Fence permit in Town of Edgewood

Exempt·Rule 1

Fences 7 feet or less are exempt from a state building permit under 2021 NMRBC R105.2. Town of Edgewood zoning ordinance regulates fence height, material, and setback; front-yard fences are typically limited to 3-4 feet while rear/side yard fences up to 6 feet are generally allowed. Call Planning & Zoning at (505) 286-4518 before installing.

Source2021 NMRBC R105.2 / Town of Edgewood Zoning · view source

When you need a Fence permit in Town of Edgewood

Required·Rule 1

Fences over 7 feet require a building permit from the Town Planning & Zoning Department. Submit application with site plan showing height, material, and setback to 171-A State Road 344. Call (505) 286-4518 for current fee.

Typical Timelineabout 2 weeks
SourceTown of Edgewood Planning & Zoning / 2021 NMRBC R105.2 · view source

Fence Permit Costs: Town of Edgewood vs. Nearby

CityEstimated Fee
Town of Edgewood N/A
Albuquerque $50 – $200
Las Cruces $40 – $160
Rio Rancho $40 – $170

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Town of Edgewood permit costs →

Zoning Considerations

Zoning

Front-yard fences and fences above certain heights may require zoning approval. Many cities limit front-yard fence height to 3–4 feet. Check setback and height limits with your planning department.

Estimated Project Timeline in Town of Edgewood

Here's a typical timeline for a fence project in Town of Edgewood, NM:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Town of Edgewood's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Town of Edgewood: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Town of Edgewood's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Fence permit in Town of Edgewood, NM?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameTown of Edgewood Planning & Zoning Department
Address171-A State Road 344, Edgewood, NM 87015
HoursCall (505) 286-4518 for current hours

Frequently Asked Questions

Contact Town of Edgewood's building department for current Fence permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Fence projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Town of Edgewood can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Fence permits in Town of Edgewood is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Fence Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Fence Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-24. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.