Permit history for 593 Eddy St, Providence
Providence, RI · 91 permits on file · 2016–2019
91
Permits on file
2016
First permit
2019
Most recent
30
Unique contractors
$7,826,887
Declared value (all work)
Permits on file (91)
Ordered most recent first. Data from the city's open data portal.
Electrical Permit New
The installation of a structured cabling system that will support data and voice communications to the new conference room.
Contractor:
SYNET, INCORPORATED
Status: Active
Oct 18, 2019
Declared cost: $3,100
Electrical Permit Change/Revamp
Tomorrow fund phase 1 - electric demo, re-wire, td, nc, power, light, fa, in accordance with contract drawings.
Contractor:
WAYNE J GRIFFIN ELECTRIC INC
Status: Active
Aug 27, 2019
Declared cost: $104,520
Electrical Permit Change/Revamp
Bid package 4a behavioral; bridge clinic-electric demo, re-wire, td, nc, power, light, fa in accordance with contract drawings.
Contractor:
WAYNE J GRIFFIN ELECTRIC INC
Status: Active
Aug 27, 2019
Declared cost: $28,860
Electrical Permit Change/Revamp
Tomorrow fund phase 2 - electric demo, re-wire, td, nc, power, light, fa. in accordance with contract drawings.
Contractor:
WAYNE J GRIFFIN ELECTRIC INC
Status: Active
Aug 27, 2019
Declared cost: $10,920
Mechanical Permit Construct
Demo and re-install ductwork, disconnect and cap hwsr remove and install (2) vavs
Contractor:
ARDEN ENGINEERING CONSTRUCTOR LLC
Status: Complete
Aug 20, 2019
Declared cost: $122,000
Plumbing Permit
Install 6 counter top sinks; install new med gas; tie-onto existing sanitary, water, med gas.
Contractor:
GEM PLG & HTG CO., LLC.
Status: Active
Aug 19, 2019
Declared cost: $52,000
Mechanical Permit Construct
Demo and reinstall ductwork, remove and clean vav boxes
Contractor:
ARDEN ENGINEERING CONSTRUCTOR LLC
Status: Complete
Aug 19, 2019
Declared cost: $27,500
Mechanical Permit Construct
Remove and cap fintube at floor and install in ceiling. install (3) new vavs
Contractor:
ARDEN ENGINEERING CONSTRUCTOR LLC
Status: Active
Aug 19, 2019
Declared cost: $44,500
Mechanical Permit Install
Furnish and install (3) new 2-ton ductless split systems units in rooms: 301, 302, 243
Contractor:
ENVIRONMENTAL SYSTEMES INC
Status: Active
Jul 26, 2019
Declared cost: $14,350
Electrical Permit
Wire 2 ac splits, install feed to mri, install new lighting
Contractor:
BRUNO AND SON ELECTRIC INC
Status: Active
Jul 18, 2019
Declared cost: $40,000
Electrical Permit
Install new branch power feeds, panels, branch circuit wiring for power and lighting required for new pharmacy space being created on apc 3rd floor.
Status: Active
Jul 15, 2019
Declared cost: $175,766
Electrical Permit
Replace rotted emt conduit with pvc and rigid below ten feet.
Contractor:
SULLIVAN MCLAUGHLIN COMPANY INC
Status: Active
Jul 15, 2019
Declared cost: $169,500
Plumbing Permit
Install new water lines and 4" bfp to owner supplied equipment
Contractor:
GEM PLG & HTG CO., LLC.
Status: Active
Jun 24, 2019
Declared cost: $7,000
Plumbing Permit
Install med gas to new outlet in the mri
Contractor:
GEM PLG & HTG CO., LLC.
Status: Active
May 6, 2019
Declared cost: $5,000
Building Permit Modification to Existing
Replace ceilings, flooring, painting. new countertops, drywall, new door, new concrete housekeeping pad.
Contractor:
ADVANCED BUILDING CONCEPTS
Status: Active
Apr 9, 2019
Declared cost: $25,000
Building Permit Modification to Existing
Create opening in masonry wall to accommodate removal & instillation of laundry washerinfill opening with galvanized steel sheetswaterproof basin under washers
Contractor:
ADVANCED BUILDING CONCEPTS
Status: Active
Mar 25, 2019
Declared cost: $12,000
Electrical Permit
Pipe and wire 1 roof top unit, install 1 gfi outlet on roof, pipe and wire controls to roof top unit
Contractor:
BRUNO AND SON ELECTRIC INC
Status: Active
Mar 15, 2019
Declared cost: $14,000
Electrical Permit
Disconnect/reconnect existing chiller
Contractor:
ARDEN ENGINEERING CONST LLC
Status: Active
Mar 12, 2019
Declared cost: $3,500
Mechanical Permit Install
50-ton air-cooled chiller 1-1 replacement
Contractor:
ARDEN ENGINEERING CONSTRUCTOR LLC
Status: Active
Mar 12, 2019
Declared cost: $45,000
Electrical Permit New
The installation of a structured cabling system that will support voice and data communications throughout the new space.
Contractor:
SYNET, INCORPORATED
Status: Active
Mar 5, 2019
Declared cost: $13,500
Sprinkler and Other Suppression Systems Permit Reconstruct
Relocate existing sprinkler in kitchen
Contractor:
AERO MECHANICAL INC
Status: Complete
Feb 19, 2019
Declared cost: $10,000
Electrical Permit
Relocate existing conduit and wire feeders to allow for removal of large pull box to make the basement corridor/tunnel between rih and w & i wider for hospital beds. also included is some new lighting, doctors page speakers and fire alarm a
Status: Active
Feb 14, 2019
Declared cost: $165,073
Electrical Permit
Install branch wiring and lighting as shown on electrical drawings.
Contractor:
RYAN ELECTRIC CONSTRUCTION INC
Status: Complete
Jan 31, 2019
Declared cost: $65,000
Electrical Permit
Relocate wiring devices and lighting. add tel/data jacks
Contractor:
RYAN ELECTRIC CONSTRUCTION INC
Status: Complete
Jan 16, 2019
Declared cost: $20,000
Jan 14, 2019
Declared cost: $19,900
Commercial Cooking Permit
Install ansul system for commercial cooking operations.
Contractor:
ALL STATE FIRE EQUIPMENT OF RI
Status: Active
Jan 2, 2019
Declared cost: $3,500
Commercial Cooking Permit
Some selective demo. install: (1) 10 ton roof top unit with associated ductwork, (2) general exhaust fans and associated duct work, (2) kitchen exhaust fans and associated duct work, duct wrap insulations, air balancing, (2) kitchen hood- h
Contractor:
ENVIRONMENTAL SYSTEMES INC
Status: Complete
Dec 14, 2018
Declared cost: $125,935
Plumbing Permit
Install: 1 water closet; 1 lav sink; 1 kitchen sink
Contractor:
GEM PLG & HTG CO., LLC.
Status: Complete
Dec 7, 2018
Declared cost: $12,250
Sprinkler and Other Suppression Systems Permit Install
Demo existing and install new sprinklers and sprinkler pipe in the existing tunnel
Contractor:
ENCORE HOLDINGS, LLC DBA/ ENCORE FIRE PROTECT
Status: Active
Nov 19, 2018
Declared cost: $25,000
Electrical Permit
Provide new feeds to (2) new replacement dryers and a new feed to the (1) replacement hoist
Status: Complete
Nov 2, 2018
Declared cost: $11,000
Electrical Permit New
The installation of a structured cabling system which will support data and voice communications throughout the renovated space.
Contractor:
SYNET, INCORPORATED
Status: Complete
Oct 24, 2018
Declared cost: $22,000
Electrical Permit New
The installation of a structured cabling system that will support data and voice communications throughout the new space.
Contractor:
SYNET, INCORPORATED
Status: Complete
Oct 24, 2018
Declared cost: $5,200
Building Permit Modification to Existing
Light gauge framing and new finishes
Contractor:
CHAPEL BUILDING CORP
Status: Active
Oct 23, 2018
Declared cost: $113,500
Electrical Permit
Provide receptacles to power cctv in parking lots; e-7, e-10, e-11, d-2, willard garage, bridge garage and apc lot.
Contractor:
ARDEN ENGINEERING CONST LLC
Status: Complete
Oct 22, 2018
Declared cost: $25,000
Oct 16, 2018
Declared cost: $16,000
Plumbing Permit
14 floor drains; 1 grease trap; hook-up owner supplied kitchen equipment; tie onto existing grease waste & water;
Contractor:
GEM PLG & HTG CO., LLC.
Status: Complete
Oct 15, 2018
Declared cost: $62,000
Electrical Permit
Install wiring for nine lighting fixtures in new corridor on the 11th floor.
Contractor:
RYAN ELECTRIC CONSTRUCTION INC
Status: Active
Oct 15, 2018
Declared cost: $3,500
Electrical Permit
Maintenance permit for 2018
Status: Active
Oct 2, 2018
Declared cost: $1,203,000
Building Permit Modification to Existing
Interior renovation of family waiting and consultation rooms. work to include new finished, lights and millwork.
Contractor:
A.AUTIELLO CONST.CO.INC.
Status: Complete
Sep 4, 2018
Declared cost: $151,650
Building Permit Modification to Existing
Renovations to the existing cafeteria and dining areas. new finishes including flooring, paint, and food service equipment. the work also includes modifications the existing electrical, hvac, and plumbing to accommodate the new equipment.
Contractor:
SHAWMUT WOODWORKING & SUPPLY INC
Status: Complete
Sep 4, 2018
Declared cost: $618,467
Electrical Permit
Install temporary power panels and branch circuits for temporary kitchen equipment.
Contractor:
RYAN ELECTRIC CONSTRUCTION INC
Status: Complete
Aug 28, 2018
Declared cost: $25,000
Electrical Permit New
The installation of a structured cabling system, which will support data and voice communications throughout cafeteria space
Contractor:
SYNET, INCORPORATED
Status: Complete
Aug 23, 2018
Declared cost: $5,350
Plumbing Permit
Install 1 water closet; 1 lav sink
Contractor:
GEM PLG & HTG CO., LLC.
Status: Complete
Aug 14, 2018
Declared cost: $5,000
Electrical Permit
Install infrastructure for new mri #3, install 250 amp 480 volt feed for mri, install (1) 225 kva transformer, install all lights and plugs associated within mri room
Contractor:
BRUNO AND SON ELECTRIC INC
Status: Complete
Aug 10, 2018
Declared cost: $75,000
Electrical Permit
Install (1) siemens biplane unit, install raceways and troughs for siemen's unit, pipe and wire (1) 400 amp 480 volt flywheel (ups) install lights, plugs and switches associated for biplane room, install (1) isolation panel for receptacles
Contractor:
BRUNO AND SON ELECTRIC INC
Status: Complete
Aug 10, 2018
Declared cost: $70,000
Aug 9, 2018
Declared cost: $8,000
Electrical Permit
Upgrade interior lighting in squash courts on penthouse level in gerry house. remove and recycle (5) 4' fluorescent fixtures and (6) hid fixtures. install (12) led high-bay fixtures.
Status: Complete
Jul 9, 2018
Declared cost: $8,100
Building Permit Addition to Existing
Sprint proposes the following to existing rooftop site: replace three (3) existing antennas on existing mounts, add three (3) antennas on existing mounts, add three (3) rrus at new antennas, add six (6) hybrid cables along existing. work wi
Contractor:
CENTERLINE COMM LLC
Status: Active
Jun 27, 2018
Declared cost: $25,000
Electrical Permit New
The installation of a structured cabling system that will support data to 8 locations in the main kitchen
Contractor:
SYNET, INCORPORATED
Status: Complete
Jun 14, 2018
Declared cost: $8,339
Electrical Permit
Rework and new power, lighting add panels as required to perform cath lab renovations per plans and specs.
Status: Complete
Apr 27, 2018
Declared cost: $90,450
Mechanical Permit Install
Install two air handling units, vav's, two unit heaters, with associated piping & duct
Contractor:
J ZARRELLA PLUMBING AND HEATING CO INC
Status: Active
Apr 26, 2018
Declared cost: $248,200
Plumbing Permit
Comfort plumbing & medical gas
Contractor:
J ZARRELLA PLUMBING AND HEATING CO INC
Status: Active
Apr 10, 2018
Declared cost: $224,400
Plumbing Permit
Install one new floor sink, one new sink & indirect wastes
Contractor:
J ZARRELLA PLUMBING AND HEATING CO INC
Status: Active
Apr 4, 2018
Declared cost: $21,550
Electrical Permit
Install new 277/480v & 120/208v panels to feed new data closet rack receptacles, light fixtures & split unit hvac unit. all tele/data equipment, wiring &furnishing & installing of the split unit is by others.
Status: Complete
Apr 2, 2018
Declared cost: $36,400
Building Permit Modification to Existing
Renovation of café equipment, finishes, and furnishings. scope of work includes replacement ceilings, wall tile, new flooring, millwork, and paint.
Contractor:
SHAWMUT WOODWORKING & SUPPLY INC
Status: Complete
Mar 22, 2018
Declared cost: $111,368
Building Permit Modification to Existing
Remove and replace drywall, acoustical ceilings, doors, and flooring.
Contractor:
CHAPEL BUILDING CORP
Status: Active
Mar 8, 2018
Declared cost: $260,255
Electrical Permit New
The installation of a structured cabling system, which will support data and voice communications throughout the space from the new data closet.
Contractor:
SYNET, INCORPORATED
Status: Complete
Feb 26, 2018
Declared cost: $39,800
Electrical Permit
Install approximately 400 feet of 1/2 inch emt with a honeywell cable for communication of chillers in lower basement.
Contractor:
APPLE VALLEY ALARMS LLC
Status: Complete
Feb 12, 2018
Declared cost: $3,500
Mechanical Permit Replace (In-kind equipment)
Remove & replace one air handling unit on the 3rd floor davol building.install a temporary roof top unit.
Contractor:
J ZARRELLA PLUMBING AND HEATING CO INC
Status: Active
Jan 24, 2018
Declared cost: $376,000
Electrical Permit New
The installation of a structured cabling system, which will support data and voice communications throughout the renovated cath lab.
Contractor:
SYNET, INCORPORATED
Status: Complete
Dec 29, 2017
Declared cost: $10,000
Plumbing Permit
Phase #3 - 21 toilets; 21 sinks; 11 shower valves
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Complete
Dec 20, 2017
Declared cost: $22,000
Plumbing Permit
Phase #2 - 16 toilets; 14 sinks; 4 shower valves
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Complete
Dec 20, 2017
Declared cost: $22,000
Mechanical Permit Reconstruct
Installation of new steam piping, condensate piping, ductwork, unit heaters, re-heat coils, and cabinet unit heaters to an existing steam boiler.
Contractor:
SAGAMORE PLUMBING & HEATING INC
Status: Active
Dec 14, 2017
Declared cost: $117,295
Mechanical Permit Construct
Fabrication and installation of sheet metal and sheet metal accessories for the above project.
Contractor:
HUGHES SHEET METAL INC
Status: Active
Nov 16, 2017
Declared cost: $26,000
Mechanical Permit Install
Install a clean agent fire suppression system.
Contractor:
VIXEN FIRE PROTECTION SERVICES
Status: Complete
Nov 3, 2017
Declared cost: $3,500
Building Permit Modification to Existing
Minor demolition to install new walls and millwork for interior renovations.
Contractor:
PARISEAULT BUILDERS INC
Status: Active
Oct 25, 2017
Declared cost: $65,000
Electrical Permit Change/Revamp
Install new 2x4 led lights, install new hospital grade receptacles for new walls
Contractor:
BRUNO AND SON ELECTRIC INC
Status: Complete
Oct 25, 2017
Declared cost: $20,000
Electrical Permit
Installation of a new fire alarm system with all associate conduit and wire
Contractor:
ARDEN ENGINEERING CONST LLC
Status: Complete
Sep 19, 2017
Declared cost: $163,985
Mechanical Permit Install
Furnish and install gas piping
Contractor:
DELTA MECHANICAL CONTRACTORS LLC
Status: Complete
Sep 19, 2017
Declared cost: $7,500
Plumbing Permit
Furnish and install domestic water piping, medical gas piping, sanitary piping and storm piping. furnish and install (6) roof drains
Contractor:
DELTA MECHANICALCONTRACTORS LLC
Status: Active
Sep 19, 2017
Declared cost: $34,800
Plumbing Permit
Install 6-wc; 10-lav sinks; 1-kitchen sink; med gas to owner supplied head walls
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Active
Aug 22, 2017
Declared cost: $46,000
Electrical Permit
Maintenance permit, low voltage from 1/1/2017 to 12/31/2017
Status: Complete
Jun 14, 2017
Declared cost: $1,174,400
Plumbing Permit
Install 2 new sinks and medical lab equipment
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Complete
May 22, 2017
Declared cost: $10,500
Mechanical Permit Install
Ims will be installing two (2) 3-ton mitsubishi ductless split ac systems to serve the verizon das equipment room at rhode island hospital. ims will also have their sheet metal sub-contractor install one (1) exhaust fan with associated duct
Contractor:
INTERSTATE MECHANICAL SERVICES INC
Status: Complete
Apr 25, 2017
Declared cost: $31,435
Plumbing Permit
Install new hot water heater; backflow preventers and expansion tank
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Complete
Mar 31, 2017
Declared cost: $68,000
Electrical Permit New
Lovoltage data wiring
Contractor:
AMERICAN TELE-CONNECT SERVICES INC
Status: Complete
Mar 29, 2017
Declared cost: $8,500
Mechanical Permit Install
Steam piping to new domestic hot water heaters installed by plumbing contractor
Contractor:
AERO MECHANICAL INC
Status: Active
Mar 22, 2017
Declared cost: $26,300
Electrical Permit
Installation of new sub-panel, lighting, and branch circuitry for new head end room for verizon. installation of 30a receptacle at (11) locations to support equipment in idf rooms. wiring to support gps antenna on the roof. electrical requi
Contractor:
JAMES J O'ROURKE, INC.
Status: Complete
Mar 20, 2017
Declared cost: $92,000
Building Permit Modification to Existing
Create closet in existing space
Status: Complete
Mar 10, 2017
Declared cost: $18,800
Electrical Permit
Install smoke and carbon monoxide detectors (apc building)
Status: Complete
Mar 8, 2017
Declared cost: $2,000
Electrical Permit
Add new 120v receptacles for new equipment, provide 120v power to new exhaust fan and relocate the existing light switch within room.
Contractor:
ARDEN ENGINEERING CONST LLC
Status: Complete
Feb 14, 2017
Declared cost: $6,965
Electrical Permit New
The installation of a cabling system that will support data and voice communications in the offices housing the new 3d printer.
Contractor:
SYNET, INCORPORATED
Status: Complete
Feb 2, 2017
Declared cost: $3,885
Electrical Permit New
Install teledata cables to three wall ocations in room 2b30
Contractor:
ALADDIN ELECTRIC CO INC
Status: Complete
Jan 27, 2017
Declared cost: $1,450
Plumbing Permit
Install new sink; bfp & water filter; tie onto existing
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Active
Jan 25, 2017
Declared cost: $2,500
Plumbing Permit
Install water & drain to free standing water cooler
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Active
Jan 25, 2017
Declared cost: $300
Electrical Permit New
The installation of a das sytem to support cellular communications within the facility, the installation of fiber optic cableing and remotes
Contractor:
SYNET, INCORPORATED
Status: Complete
Jan 24, 2017
Declared cost: $503,269
Plumbing Permit
Install new toilet; lav sink; break room sink and shower valve; tie onto existing
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Active
Jan 19, 2017
Declared cost: $3,000
Mechanical Permit Reconstruct
Duct work modification
Status: Complete
Jan 9, 2017
Declared cost: $1,800
Electrical Permit Change/Revamp
Minor interior electrical renovations. replace existing lighting. add general use receptacles.
Contractor:
RYAN ELECTRIC CONSTRUCTION INC
Status: Complete
Jan 5, 2017
Declared cost: $23,000
Plumbing Permit
Hasbro, 2nd floor family waiting room. installing (1) new w/c, lav sink & shower.
Contractor:
GEM PLUMBING & HEATING CO INC
Status: Active
Jan 5, 2017
Declared cost: $3,000
Building Permit Modification to Existing
593 eddy st commercial john j. cardosi jr. j j cardosi inc. 401-435-6101 minor interior renovation and cosmetic upgrades to the family waiting room area, with no structural modification on the 2nd floor of hasbor children's hospital. call f
Status: Complete
Dec 27, 2016
Declared cost: $70,000
Check permits at another Providence address
Free instant lookup, no signup.
Search Providence permits →
Disclaimer: Permit data comes from Providence's official open data portal. Records may be incomplete for older permits, and not every home-improvement project requires a permit. Verify with the Providence building department before buying, selling, or planning work.