Permit history for 200 Clarendon St
Boston, MA · 500 permits on file · 2021–2026
500
Permits on file
2021
First permit
2026
Most recent
90
Unique contractors
$268,694,628
Declared value (all work)
Permits on file (500)
Ordered most recent first. Data from the city's open data portal.
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Apr 16, 2026
Declared cost: $3,500
Permit fee: $60
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
Apr 15, 2026
Declared cost: $49,980
Permit fee: $520
Apr 13, 2026
Declared cost: $17,250
Permit fee: $200
Apr 6, 2026
Declared cost: $3,600
Permit fee: $30
Mar 26, 2026
Declared cost: $576,350
Permit fee: $796
Mar 26, 2026
Declared cost: $734,500
Permit fee: $7,370
Mar 26, 2026
Declared cost: $510
Permit fee: $30
Mar 26, 2026
Declared cost: $10,000
Permit fee: $20
Mar 24, 2026
Declared cost: $43,210
Permit fee: $460
Mar 19, 2026
Declared cost: $95,645
Permit fee: $980
Mar 4, 2026
Declared cost: $276,581
Permit fee: $218
Feb 25, 2026
Declared cost: $4,150,000
Permit fee: $42,360
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Raymond Mcdonald
Status: Closed
Feb 24, 2026
Declared cost: $12,000,000
Permit fee: $380
Feb 19, 2026
Declared cost: $39,200
Permit fee: $53
Feb 19, 2026
Declared cost: $45,525
Permit fee: $480
Feb 19, 2026
Declared cost: $27,000
Permit fee: $290
Feb 18, 2026
Declared cost: $18,230
Permit fee: $210
Feb 12, 2026
Declared cost: $562,229
Permit fee: $400
Feb 10, 2026
Declared cost: $3,950
Permit fee: $25
Feb 4, 2026
Declared cost: $1,500
Permit fee: $40
Feb 3, 2026
Declared cost: $120,000
Permit fee: $149
Feb 3, 2026
Declared cost: $6,800
Permit fee: $90
Feb 3, 2026
Declared cost: $14,000
Permit fee: $35
Feb 2, 2026
Declared cost: $616,980
Permit fee: $6,630
Feb 2, 2026
Declared cost: $230,000
Permit fee: $2,785
Jan 30, 2026
Declared cost: $18,375
Permit fee: $210
Jan 29, 2026
Declared cost: $1,196,584
Permit fee: $262
Jan 15, 2026
Declared cost: $11,123,643
Permit fee: $1,050
Jan 15, 2026
Declared cost: $80
Permit fee: $30
Dec 11, 2025
Declared cost: $20,000
Permit fee: $220
Dec 10, 2025
Declared cost: $30,000
Permit fee: $570
Dec 9, 2025
Declared cost: $8,500
Permit fee: $110
Dec 2, 2025
Declared cost: $80,000
Permit fee: $55
Nov 18, 2025
Declared cost: $1,442,594
Permit fee: $400
Nov 14, 2025
Declared cost: $265,000
Permit fee: $2,670
Nov 13, 2025
Declared cost: $77,000
Permit fee: $1,040
Nov 12, 2025
Declared cost: $10,000
Permit fee: $370
Nov 10, 2025
Declared cost: $350
Permit fee: $280
Nov 6, 2025
Declared cost: $4,500
Permit fee: $70
Nov 6, 2025
Declared cost: $10,000
Permit fee: $120
Nov 5, 2025
Declared cost: $45,450
Permit fee: $20
Nov 3, 2025
Declared cost: $276,581
Permit fee: $3,980
Oct 23, 2025
Declared cost: $2,000
Permit fee: $40
Oct 8, 2025
Declared cost: $14,000
Permit fee: $545
Oct 8, 2025
Declared cost: $6,000
Permit fee: $20
Oct 7, 2025
Declared cost: $1
Permit fee: $365
Oct 7, 2025
Declared cost: $220,000
Permit fee: $2,220
Oct 7, 2025
Declared cost: $13,500
Permit fee: $160
Oct 6, 2025
Declared cost: $100,000
Permit fee: $1,020
Oct 1, 2025
Declared cost: $400,000
Permit fee: $820
Sep 30, 2025
Declared cost: $6,000
Permit fee: $271
Sep 30, 2025
Declared cost: $5,000
Permit fee: $70
Sep 30, 2025
Declared cost: $23,132
Permit fee: $260
Sep 26, 2025
Declared cost: $15,400
Permit fee: $180
Sep 26, 2025
Declared cost: $525,000
Permit fee: $5,270
Sep 23, 2025
Declared cost: $274,000
Permit fee: $1,060
Sep 23, 2025
Declared cost: $400,000
Permit fee: $4,020
Sep 22, 2025
Declared cost: $1,600,457
Permit fee: $1,038
Sep 22, 2025
Declared cost: $350,000
Permit fee: $474
Sep 22, 2025
Declared cost: $350,000
Permit fee: $224
Sep 22, 2025
Declared cost: $350,000
Permit fee: $224
Sep 22, 2025
Declared cost: $25,000
Permit fee: $520
Sep 22, 2025
Declared cost: $25,000
Permit fee: $270
Sep 22, 2025
Declared cost: $25,000
Permit fee: $270
Sep 17, 2025
Declared cost: $3,710,000
Permit fee: $880
Sep 17, 2025
Declared cost: $315,000
Permit fee: $3,420
Sep 15, 2025
Declared cost: $1,550,000
Permit fee: $2,189
Sep 5, 2025
Declared cost: $120,000
Permit fee: $1,220
Sep 4, 2025
Declared cost: $11,123,643
Permit fee: $111,540
Sep 4, 2025
Declared cost: $37,000
Permit fee: $290
Sep 2, 2025
Declared cost: $54,250
Permit fee: $572
Aug 28, 2025
Declared cost: $12,250
Permit fee: $150
Aug 28, 2025
Declared cost: $1,594
Permit fee: $40
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Aug 22, 2025
Declared cost: $581,475
Permit fee: $2,366
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Aug 22, 2025
Declared cost: $5,000,000
Permit fee: $12,899
Aug 22, 2025
Declared cost: $10,500
Permit fee: $28
Aug 22, 2025
Declared cost: $120,000
Permit fee: $83
Aug 22, 2025
Declared cost: $9,800
Permit fee: $370
Aug 22, 2025
Declared cost: $10,333
Permit fee: $130
Aug 21, 2025
Declared cost: $45,000
Permit fee: $305
Aug 21, 2025
Declared cost: $25,000
Permit fee: $540
Aug 15, 2025
Declared cost: $1,840
Permit fee: $290
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Raymond Mcdonald
Status: Open
Aug 6, 2025
Declared cost: $12,000,000
Permit fee: $122,085
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Aug 6, 2025
Declared cost: $36,000
Permit fee: $630
Aug 4, 2025
Declared cost: $1,196,584
Permit fee: $12,855
Jul 29, 2025
Declared cost: $15,000
Permit fee: $27
Jul 23, 2025
Declared cost: $26,000
Permit fee: $310
Jul 22, 2025
Declared cost: $149,000
Permit fee: $591
Jul 22, 2025
Declared cost: $25,000
Permit fee: $270
Jul 9, 2025
Declared cost: $562,229
Permit fee: $6,590
Jul 9, 2025
Declared cost: $32,000
Permit fee: $340
Jul 3, 2025
Declared cost: $30,000
Permit fee: $320
Jul 2, 2025
Declared cost: $15,800
Permit fee: $50
Jul 1, 2025
Declared cost: $30,000
Permit fee: $510
Jul 1, 2025
Declared cost: $8,500
Permit fee: $282
Jun 24, 2025
Declared cost: $1,442,594
Permit fee: $15,640
Jun 18, 2025
Declared cost: $1,600
Permit fee: $40
Jun 18, 2025
Declared cost: $8,200
Permit fee: $110
Jun 17, 2025
Declared cost: $55,000
Permit fee: $1,320
Jun 16, 2025
Declared cost: $56,000
Permit fee: $595
Jun 9, 2025
Declared cost: $5,000
Permit fee: $320
Jun 4, 2025
Declared cost: $100,000
Permit fee: $1,020
Jun 2, 2025
Declared cost: $15,000
Permit fee: $285
Jun 2, 2025
Permit fee: $205
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Raymond Mcdonald
Status: Open
May 30, 2025
Declared cost: $3,160,000
Permit fee: $32,335
May 28, 2025
Declared cost: $1,000,000
Permit fee: $10,020
May 7, 2025
Declared cost: $55,000
Permit fee: $806
May 7, 2025
Declared cost: $6,425
Permit fee: $340
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
May 7, 2025
Declared cost: $401,985
Permit fee: $4,540
May 6, 2025
Declared cost: $18,000
Permit fee: $450
May 5, 2025
Declared cost: $175,930
Permit fee: $728
Certificate of Occupancy INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Closed
May 1, 2025
Declared cost: $24,514,225
Permit fee: $12,710
May 1, 2025
Declared cost: $23,300
Permit fee: $550
Apr 30, 2025
Declared cost: $1,600,457
Permit fee: $17,595
Apr 30, 2025
Declared cost: $215,000
Permit fee: $624
Apr 25, 2025
Declared cost: $1,500
Permit fee: $40
Apr 25, 2025
Declared cost: $1,500
Permit fee: $40
Apr 16, 2025
Declared cost: $10,270
Permit fee: $130
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Apr 14, 2025
Declared cost: $797,665
Permit fee: $8,565
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Apr 14, 2025
Declared cost: $581,475
Permit fee: $7,705
Apr 10, 2025
Declared cost: $18,130
Permit fee: $44
Mar 28, 2025
Declared cost: $69,750
Permit fee: $80
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Raymond P Mcdonald
Status: Closed
Mar 26, 2025
Declared cost: $550,000
Permit fee: $5,520
Mar 25, 2025
Declared cost: $45,000
Permit fee: $470
Mar 17, 2025
Declared cost: $1,500
Permit fee: $275
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Mar 14, 2025
Declared cost: $5,000,000
Permit fee: $57,410
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Open
Mar 14, 2025
Declared cost: $152,283
Permit fee: $2,750
Mar 11, 2025
Declared cost: $631,030
Permit fee: $1,661
Mar 7, 2025
Declared cost: $26,580
Permit fee: $290
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Status: Open
Feb 13, 2025
Declared cost: $68,680
Permit fee: $1,150
Feb 3, 2025
Declared cost: $5,000
Permit fee: $320
Jan 31, 2025
Declared cost: $21,350
Permit fee: $240
Jan 17, 2025
Declared cost: $8,400
Permit fee: $29
Dec 6, 2024
Declared cost: $530,000
Permit fee: $595
Nov 20, 2024
Declared cost: $900
Permit fee: $30
Nov 18, 2024
Declared cost: $1,500
Permit fee: $40
Nov 18, 2024
Declared cost: $6,300
Permit fee: $90
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Nov 15, 2024
Declared cost: $75,000
Permit fee: $1,020
Nov 8, 2024
Declared cost: $1,500
Permit fee: $40
Nov 5, 2024
Declared cost: $10,000
Permit fee: $370
Nov 1, 2024
Declared cost: $127,467
Permit fee: $1,300
Oct 29, 2024
Declared cost: $500
Permit fee: $285
Oct 15, 2024
Declared cost: $8,500
Permit fee: $28
Oct 9, 2024
Declared cost: $72,000
Permit fee: $740
Oct 9, 2024
Declared cost: $1,200
Permit fee: $40
Oct 4, 2024
Declared cost: $13,500
Permit fee: $26
Oct 1, 2024
Declared cost: $10,000
Permit fee: $529
Sep 26, 2024
Declared cost: $12,000
Permit fee: $140
Short Form Bldg Permit INTEXT
Interior/exterior work
Status: Closed
Sep 24, 2024
Declared cost: $156,830
Permit fee: $1,590
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Sep 20, 2024
Declared cost: $22,000
Permit fee: $240
Sep 18, 2024
Declared cost: $153,900
Permit fee: $965
Sep 18, 2024
Declared cost: $175,000
Permit fee: $1,770
Sep 18, 2024
Declared cost: $2,600
Permit fee: $25
Sep 17, 2024
Declared cost: $1,716
Permit fee: $40
Sep 13, 2024
Declared cost: $19,000
Permit fee: $210
Sep 13, 2024
Declared cost: $75,000
Permit fee: $770
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Bradford Weilbrenner
Status: Open
Sep 11, 2024
Declared cost: $116,531
Permit fee: $1,690
Sep 6, 2024
Declared cost: $8,300
Permit fee: $110
Aug 30, 2024
Declared cost: $3,500
Permit fee: $23
Aug 30, 2024
Declared cost: $13,800
Permit fee: $314
Aug 30, 2024
Declared cost: $4,500
Permit fee: $70
Aug 26, 2024
Declared cost: $2,500
Permit fee: $24
Aug 20, 2024
Declared cost: $180,000
Permit fee: $2,070
Aug 20, 2024
Declared cost: $15,000
Permit fee: $420
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
David M Corderman Jr
Status: Open
Aug 15, 2024
Declared cost: $41,280
Permit fee: $440
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Jeffrey J Carpine
Status: Closed
Aug 14, 2024
Declared cost: $121,540
Permit fee: $1,740
Aug 9, 2024
Declared cost: $4,500,000
Permit fee: $13,970
Aug 7, 2024
Declared cost: $4,200
Permit fee: $24
Aug 6, 2024
Declared cost: $19,000
Permit fee: $210
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Closed
Aug 5, 2024
Declared cost: $22,525,525
Permit fee: $226,970
Aug 1, 2024
Declared cost: $8,000,001
Permit fee: $9,870
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Jul 29, 2024
Declared cost: $530,000
Permit fee: $6,260
Jul 23, 2024
Declared cost: $944,000
Permit fee: $1,165
Jul 17, 2024
Declared cost: $2,360,000
Permit fee: $2,621
Jul 17, 2024
Declared cost: $310,000
Permit fee: $3,120
Short Form Bldg Permit INTEXT
Interior/exterior work
Status: Closed
Jul 17, 2024
Declared cost: $196,000
Permit fee: $1,980
Jul 8, 2024
Declared cost: $12,800
Permit fee: $150
Jun 26, 2024
Declared cost: $1,010,235
Permit fee: $633
Amendment to a Long Form INTREN
Renovations - interior nsc
Contractor:
Francesca DiRico
Status: Closed
Jun 20, 2024
Declared cost: $1
Permit fee: $30
Jun 20, 2024
Declared cost: $17,500
Permit fee: $65
Jun 20, 2024
Declared cost: $2,500
Permit fee: $300
Jun 17, 2024
Declared cost: $153,900
Permit fee: $2,500
Jun 17, 2024
Declared cost: $25,000
Permit fee: $788
Jun 13, 2024
Declared cost: $18,000
Permit fee: $34
Jun 12, 2024
Declared cost: $6,629
Permit fee: $90
Jun 5, 2024
Declared cost: $294,335
Permit fee: $6,020
May 17, 2024
Declared cost: $4,500,000
Permit fee: $270
Apr 26, 2024
Declared cost: $10,500
Permit fee: $25
Apr 24, 2024
Declared cost: $10,100
Permit fee: $36
Apr 24, 2024
Declared cost: $5,700
Permit fee: $80
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Closed
Apr 16, 2024
Declared cost: $1,988,700
Permit fee: $42,200
Apr 5, 2024
Declared cost: $15,250
Permit fee: $180
Apr 4, 2024
Declared cost: $26,250
Permit fee: $290
Apr 4, 2024
Declared cost: $29,750
Permit fee: $320
Apr 4, 2024
Declared cost: $14,000
Permit fee: $160
Apr 2, 2024
Declared cost: $15,000
Permit fee: $45
Mar 21, 2024
Declared cost: $5,400
Permit fee: $70
Mar 18, 2024
Declared cost: $65,000
Permit fee: $695
Mar 18, 2024
Declared cost: $6,000
Permit fee: $275
Mar 18, 2024
Declared cost: $65,000
Permit fee: $670
Mar 13, 2024
Declared cost: $7,800
Permit fee: $100
Mar 10, 2024
Declared cost: $20,000
Permit fee: $220
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Open
Mar 8, 2024
Declared cost: $180,000
Permit fee: $2,510
Mar 8, 2024
Declared cost: $327,600
Permit fee: $947
Mar 8, 2024
Declared cost: $25,200
Permit fee: $819
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Chris Ferragamo
Status: Closed
Mar 6, 2024
Declared cost: $1,010,235
Permit fee: $11,720
Mar 6, 2024
Declared cost: $2,000
Permit fee: $40
Mar 6, 2024
Declared cost: $6,365
Permit fee: $90
Mar 5, 2024
Declared cost: $16,237
Permit fee: $180
Feb 21, 2024
Declared cost: $20,000
Permit fee: $720
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Feb 20, 2024
Declared cost: $112,000
Permit fee: $1,140
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Feb 20, 2024
Declared cost: $30,000
Permit fee: $320
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Feb 20, 2024
Declared cost: $100,000
Permit fee: $1,020
Feb 15, 2024
Declared cost: $40,000
Permit fee: $610
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Closed
Feb 15, 2024
Declared cost: $900,000
Permit fee: $453
Feb 5, 2024
Declared cost: $1,496,415
Permit fee: $270
Jan 26, 2024
Declared cost: $49,254
Permit fee: $510
Jan 26, 2024
Declared cost: $74,479
Permit fee: $760
Jan 25, 2024
Declared cost: $54,870
Permit fee: $570
Jan 22, 2024
Declared cost: $18,000
Permit fee: $700
Jan 19, 2024
Declared cost: $700,000
Permit fee: $716
Jan 11, 2024
Declared cost: $2,000
Permit fee: $40
Dec 21, 2023
Declared cost: $501,190
Permit fee: $3,480
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Dec 6, 2023
Declared cost: $4,500,000
Permit fee: $46,310
Dec 6, 2023
Declared cost: $1,150,000
Permit fee: $1,325
Dec 6, 2023
Declared cost: $61,000
Permit fee: $880
Nov 17, 2023
Declared cost: $3,400
Permit fee: $250
Nov 17, 2023
Declared cost: $8,150
Permit fee: $25
Nov 16, 2023
Declared cost: $39,000
Permit fee: $410
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Joseph P Capobianco
Status: Closed
Nov 7, 2023
Declared cost: $79,380
Permit fee: $820
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Nov 6, 2023
Declared cost: $8,000,000
Permit fee: $82,685
Oct 26, 2023
Declared cost: $1,360
Permit fee: $40
Oct 23, 2023
Declared cost: $15,650
Permit fee: $40
Oct 19, 2023
Declared cost: $52,000
Permit fee: $540
Oct 18, 2023
Declared cost: $2,800
Permit fee: $290
Oct 18, 2023
Declared cost: $140,000
Permit fee: $1,420
Oct 13, 2023
Declared cost: $60,000
Permit fee: $620
Oct 12, 2023
Declared cost: $381,853
Permit fee: $3,840
Oct 10, 2023
Declared cost: $8,015
Permit fee: $140
Sep 25, 2023
Declared cost: $47,100
Permit fee: $795
Sep 18, 2023
Declared cost: $17,446
Permit fee: $190
Sep 13, 2023
Declared cost: $32,850
Permit fee: $350
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Open
Sep 13, 2023
Declared cost: $480,916
Permit fee: $5,880
Sep 11, 2023
Declared cost: $13,964
Permit fee: $160
Sep 8, 2023
Declared cost: $5,380
Permit fee: $330
Sep 6, 2023
Declared cost: $1,800
Permit fee: $290
Aug 25, 2023
Declared cost: $3,500,000
Permit fee: $2,317
Aug 18, 2023
Declared cost: $1,850
Permit fee: $40
Aug 9, 2023
Declared cost: $154,000
Permit fee: $454
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Jul 28, 2023
Declared cost: $2,413,185
Permit fee: $21,127
Jul 20, 2023
Declared cost: $30,000
Permit fee: $510
Jul 13, 2023
Declared cost: $15,000
Permit fee: $420
Jul 12, 2023
Declared cost: $235,000
Permit fee: $4,210
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Raymond P Mcdonald
Status: Open
Jul 10, 2023
Declared cost: $277,500
Permit fee: $2,800
Jul 5, 2023
Declared cost: $15,000
Permit fee: $670
Jun 29, 2023
Declared cost: $14,000
Permit fee: $21
Jun 23, 2023
Declared cost: $18,000
Permit fee: $42
Jun 22, 2023
Declared cost: $50,000
Permit fee: $680
Jun 21, 2023
Declared cost: $275,000
Permit fee: $2,770
Jun 21, 2023
Declared cost: $20,000
Permit fee: $50
Jun 20, 2023
Declared cost: $501,190
Permit fee: $6,480
Jun 20, 2023
Declared cost: $17,300
Permit fee: $190
Jun 15, 2023
Declared cost: $240,000
Permit fee: $3,335
Jun 14, 2023
Declared cost: $37,365
Permit fee: $390
Jun 5, 2023
Declared cost: $2,800
Permit fee: $50
Jun 5, 2023
Declared cost: $19,000
Permit fee: $100
Jun 1, 2023
Declared cost: $32,000
Permit fee: $525
Jun 1, 2023
Declared cost: $6,240
Permit fee: $90
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Closed
May 31, 2023
Declared cost: $927,000
Permit fee: $512
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Closed
May 31, 2023
Declared cost: $589,000
Permit fee: $291
May 24, 2023
Declared cost: $265,000
Permit fee: $893
May 24, 2023
Declared cost: $5,500
Permit fee: $80
May 22, 2023
Declared cost: $8,000
Permit fee: $55
May 22, 2023
Declared cost: $265,000
Permit fee: $450
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
May 19, 2023
Declared cost: $12,000
Permit fee: $140
May 18, 2023
Declared cost: $725,000
Permit fee: $1,278
May 18, 2023
Declared cost: $600
Permit fee: $30
May 18, 2023
Declared cost: $52,000
Permit fee: $790
May 15, 2023
Declared cost: $35,000
Permit fee: $60
May 12, 2023
Declared cost: $12,250
Permit fee: $140
May 11, 2023
Declared cost: $87,068
Permit fee: $1,150
May 1, 2023
Declared cost: $1,435,000
Permit fee: $16,760
May 1, 2023
Declared cost: $100,000
Permit fee: $30
Apr 19, 2023
Declared cost: $100,000
Permit fee: $312
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Open
Apr 13, 2023
Declared cost: $804,000
Permit fee: $10,925
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Apr 11, 2023
Declared cost: $2,213,185
Permit fee: $23,500
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Closed
Apr 7, 2023
Declared cost: $175,000
Permit fee: $1,375
Apr 7, 2023
Declared cost: $43,000
Permit fee: $292
Apr 7, 2023
Declared cost: $23,100
Permit fee: $260
Apr 7, 2023
Declared cost: $96,000
Permit fee: $980
Apr 6, 2023
Declared cost: $8,500
Permit fee: $110
Apr 6, 2023
Declared cost: $8,000
Permit fee: $100
Apr 6, 2023
Declared cost: $8,000
Permit fee: $100
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Apr 5, 2023
Declared cost: $5,000
Permit fee: $70
Electrical Low Voltage LVOLT
Low voltage
Status: Open
Apr 5, 2023
Declared cost: $17,000
Permit fee: $190
Mar 28, 2023
Declared cost: $6,000
Permit fee: $80
Mar 24, 2023
Declared cost: $7,218
Permit fee: $90
Mar 21, 2023
Declared cost: $15,000
Permit fee: $145
Mar 17, 2023
Declared cost: $25,000
Permit fee: $593
Mar 17, 2023
Declared cost: $2,300
Permit fee: $290
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Mar 15, 2023
Declared cost: $1,006,437
Permit fee: $798
Certificate of Occupancy FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Closed
Mar 15, 2023
Declared cost: $1,322,464
Permit fee: $1,774
Mar 6, 2023
Declared cost: $420,000
Permit fee: $1,531
Mar 6, 2023
Declared cost: $33,500
Permit fee: $360
Mar 6, 2023
Declared cost: $8,500
Permit fee: $295
Mar 6, 2023
Declared cost: $8,500
Permit fee: $45
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Mar 1, 2023
Declared cost: $235,000
Permit fee: $3,535
Feb 28, 2023
Declared cost: $1,193,294
Permit fee: $515
Feb 28, 2023
Declared cost: $890,417
Permit fee: $1,165
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Joseph E Dibiase
Status: Closed
Feb 24, 2023
Declared cost: $575,000
Permit fee: $7,785
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Joseph E Dibiase
Status: Closed
Feb 24, 2023
Declared cost: $900,000
Permit fee: $11,160
Feb 22, 2023
Declared cost: $3,500,000
Permit fee: $37,200
Feb 14, 2023
Declared cost: $14,216
Permit fee: $160
Feb 14, 2023
Declared cost: $17,736
Permit fee: $200
Feb 14, 2023
Declared cost: $10,442
Permit fee: $120
Feb 14, 2023
Declared cost: $15,077
Permit fee: $170
Feb 10, 2023
Declared cost: $2,300
Permit fee: $40
Feb 9, 2023
Declared cost: $153,000
Permit fee: $1,020
Feb 9, 2023
Declared cost: $91,000
Permit fee: $411
Feb 9, 2023
Declared cost: $18,300
Permit fee: $210
Feb 9, 2023
Declared cost: $11,600
Permit fee: $140
Jan 31, 2023
Declared cost: $33,000
Permit fee: $350
Jan 31, 2023
Declared cost: $14,000
Permit fee: $160
Jan 31, 2023
Declared cost: $27,000
Permit fee: $290
Jan 26, 2023
Declared cost: $22,900
Permit fee: $250
Jan 26, 2023
Declared cost: $15,400
Permit fee: $180
Jan 23, 2023
Declared cost: $8,700
Permit fee: $45
Jan 23, 2023
Declared cost: $8,700
Permit fee: $45
Jan 17, 2023
Declared cost: $10,800
Permit fee: $130
Jan 11, 2023
Declared cost: $44,000
Permit fee: $552
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Jan 5, 2023
Declared cost: $1,295,039
Permit fee: $17,370
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Jan 5, 2023
Declared cost: $975,160
Permit fee: $12,220
Jan 5, 2023
Declared cost: $160,000
Permit fee: $1,279
Jan 5, 2023
Declared cost: $140,000
Permit fee: $451
Jan 5, 2023
Declared cost: $20,000
Permit fee: $220
Jan 5, 2023
Declared cost: $17,600
Permit fee: $200
Jan 4, 2023
Declared cost: $600
Permit fee: $30
Jan 4, 2023
Declared cost: $31,277
Permit fee: $840
Jan 4, 2023
Declared cost: $27,425
Permit fee: $300
Dec 27, 2022
Declared cost: $12,000
Permit fee: $40
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Christina Guarnotta
Status: Closed
Dec 19, 2022
Declared cost: $175,000
Permit fee: $3,185
Dec 19, 2022
Declared cost: $37,000
Permit fee: $301
Dec 15, 2022
Declared cost: $200,000
Permit fee: $7,820
Dec 13, 2022
Declared cost: $295,000
Permit fee: $3,185
Nov 18, 2022
Declared cost: $135,000
Permit fee: $210
Nov 17, 2022
Declared cost: $46,000
Permit fee: $480
Nov 12, 2022
Declared cost: $1,120
Permit fee: $40
Oct 28, 2022
Permit fee: $270
Oct 27, 2022
Declared cost: $890,417
Permit fee: $160
Oct 27, 2022
Declared cost: $12,199
Permit fee: $150
Oct 19, 2022
Declared cost: $2,800
Permit fee: $22
Oct 18, 2022
Declared cost: $325,385
Permit fee: $3,280
Oct 12, 2022
Declared cost: $29,000
Permit fee: $42
Oct 12, 2022
Declared cost: $48,000
Permit fee: $500
Oct 12, 2022
Declared cost: $6,700
Permit fee: $45
Oct 5, 2022
Declared cost: $10,000
Permit fee: $552
Oct 3, 2022
Declared cost: $8,400
Permit fee: $22
Oct 3, 2022
Declared cost: $2,000
Permit fee: $290
Sep 29, 2022
Declared cost: $88,700
Permit fee: $1,160
Sep 21, 2022
Declared cost: $2,675,000
Permit fee: $32,515
Sep 6, 2022
Declared cost: $2,900
Permit fee: $23
Aug 26, 2022
Declared cost: $7,038
Permit fee: $100
Aug 26, 2022
Declared cost: $4,904
Permit fee: $70
Aug 22, 2022
Declared cost: $600
Permit fee: $280
Aug 18, 2022
Declared cost: $8,000
Permit fee: $22
Aug 3, 2022
Declared cost: $80,000
Permit fee: $930
Aug 3, 2022
Declared cost: $70,000
Permit fee: $627
Aug 3, 2022
Declared cost: $10,000
Permit fee: $120
Aug 3, 2022
Declared cost: $9,000
Permit fee: $110
Jul 29, 2022
Declared cost: $890,417
Permit fee: $10,520
Jul 26, 2022
Declared cost: $1,193,294
Permit fee: $14,125
Jul 22, 2022
Declared cost: $160,000
Permit fee: $500
Jul 8, 2022
Declared cost: $1,131,957
Permit fee: $1,135
Jul 8, 2022
Declared cost: $500
Permit fee: $30
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Open
Jul 7, 2022
Declared cost: $5,000
Permit fee: $70
Short Form Bldg Permit INTREN
Renovations - interior nsc
Contractor:
Commodore Builders
Status: Open
Jul 6, 2022
Declared cost: $5,000
Permit fee: $2,370
Jul 5, 2022
Declared cost: $1,483,000
Permit fee: $11,070
Jun 14, 2022
Declared cost: $6,800
Permit fee: $590
Jun 9, 2022
Declared cost: $802,760
Permit fee: $6,430
Jun 7, 2022
Declared cost: $169,434
Permit fee: $1,720
Jun 6, 2022
Declared cost: $600
Permit fee: $30
May 18, 2022
Declared cost: $114,505
Permit fee: $2,285
Long Form/Alteration Permit INTREN
Renovations - interior nsc
Contractor:
Regina Olivieri
Status: Closed
May 16, 2022
Declared cost: $5,711,602
Permit fee: $58,005
May 16, 2022
Declared cost: $2,100
Permit fee: $30
May 13, 2022
Declared cost: $9,330
Permit fee: $120
May 6, 2022
Declared cost: $1,483,000
Permit fee: $270
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
May 3, 2022
Declared cost: $135,000
Permit fee: $2,010
Apr 29, 2022
Declared cost: $1,495,000
Permit fee: $1,035
Apr 26, 2022
Declared cost: $700
Permit fee: $30
Apr 26, 2022
Declared cost: $80,000
Permit fee: $100
Apr 25, 2022
Declared cost: $2,900
Permit fee: $28
Apr 19, 2022
Declared cost: $1,700
Permit fee: $23
Apr 13, 2022
Declared cost: $59,000
Permit fee: $278
Apr 4, 2022
Declared cost: $23,000
Permit fee: $542
Apr 4, 2022
Declared cost: $33,172
Permit fee: $360
Apr 1, 2022
Declared cost: $217,700
Permit fee: $434
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Mar 31, 2022
Declared cost: $32,500
Permit fee: $850
Electrical Low Voltage LVOLT
Low voltage
Status: Closed
Mar 31, 2022
Declared cost: $65,000
Permit fee: $670
Mar 24, 2022
Declared cost: $750,000
Permit fee: $1,465
Mar 23, 2022
Declared cost: $10,000
Permit fee: $24
Mar 23, 2022
Declared cost: $11,000
Permit fee: $130
Mar 23, 2022
Declared cost: $31,000
Permit fee: $330
Mar 23, 2022
Declared cost: $6,000
Permit fee: $80
Mar 18, 2022
Declared cost: $1,100,000
Permit fee: $94
Electrical Permit INTREN
Renovations - interior nsc
Contractor:
Timothy Timothy Burgess Electrical LLC
Status: Open
Mar 15, 2022
Declared cost: $2,000
Permit fee: $40
Mar 14, 2022
Declared cost: $25,000
Permit fee: $520
Mar 11, 2022
Declared cost: $14,000
Permit fee: $30
Mar 11, 2022
Declared cost: $33,000
Permit fee: $535
Mar 11, 2022
Declared cost: $1,500
Permit fee: $40
Mar 11, 2022
Declared cost: $6,000
Permit fee: $80
Mar 4, 2022
Declared cost: $333,520
Permit fee: $3,360
Mar 2, 2022
Declared cost: $5,000
Permit fee: $70
Mar 2, 2022
Declared cost: $40,000
Permit fee: $420
Feb 15, 2022
Declared cost: $5,600
Permit fee: $31
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Francesca DiRico
Status: Closed
Feb 11, 2022
Declared cost: $2,675,000
Permit fee: $29,510
Feb 8, 2022
Declared cost: $2,200
Permit fee: $40
Feb 7, 2022
Declared cost: $13,255
Permit fee: $160
Feb 7, 2022
Declared cost: $12,700
Permit fee: $150
Feb 4, 2022
Declared cost: $1,131,957
Permit fee: $13,480
Feb 3, 2022
Declared cost: $10,000
Permit fee: $35
Feb 2, 2022
Declared cost: $217,700
Permit fee: $4,140
Jan 28, 2022
Declared cost: $3,500
Permit fee: $60
Jan 28, 2022
Declared cost: $4,800
Permit fee: $70
Jan 28, 2022
Declared cost: $2,600
Permit fee: $40
Jan 26, 2022
Declared cost: $115,000
Permit fee: $1,170
Jan 17, 2022
Declared cost: $6,200
Permit fee: $340
Jan 14, 2022
Declared cost: $2,000
Permit fee: $40
Jan 14, 2022
Declared cost: $6,500
Permit fee: $340
Jan 11, 2022
Declared cost: $326,000
Permit fee: $855
Jan 5, 2022
Declared cost: $1,483,000
Permit fee: $16,515
Dec 31, 2021
Declared cost: $600
Permit fee: $30
Dec 30, 2021
Declared cost: $235,000
Permit fee: $493
Dec 30, 2021
Declared cost: $22,000
Permit fee: $42
Dec 23, 2021
Declared cost: $2,000
Permit fee: $40
Dec 21, 2021
Declared cost: $10,000
Permit fee: $120
Dec 21, 2021
Declared cost: $1,000
Permit fee: $270
Dec 16, 2021
Declared cost: $10,000
Permit fee: $370
Nov 22, 2021
Declared cost: $25,925
Permit fee: $280
Nov 19, 2021
Declared cost: $142,000
Permit fee: $1,930
Nov 19, 2021
Declared cost: $23,571
Permit fee: $550
Nov 19, 2021
Declared cost: $3,500
Permit fee: $60
Nov 17, 2021
Declared cost: $17,000
Permit fee: $190
Oct 27, 2021
Declared cost: $68,000
Permit fee: $700
Oct 21, 2021
Declared cost: $2,000,000
Permit fee: $380
Oct 15, 2021
Declared cost: $5,309
Permit fee: $80
Oct 15, 2021
Declared cost: $10,346
Permit fee: $130
Oct 13, 2021
Declared cost: $336,280
Permit fee: $1,886
Sep 13, 2021
Declared cost: $15,000
Permit fee: $170
Sep 10, 2021
Declared cost: $2,000,000
Permit fee: $1,030
Sep 9, 2021
Declared cost: $4,200
Permit fee: $25
Aug 28, 2021
Declared cost: $95,000
Permit fee: $970
Aug 25, 2021
Declared cost: $3,500
Permit fee: $60
Aug 12, 2021
Declared cost: $10,000
Permit fee: $370
Aug 12, 2021
Declared cost: $10,000
Permit fee: $370
Aug 12, 2021
Declared cost: $10,000
Permit fee: $370
Jul 26, 2021
Declared cost: $600
Permit fee: $30
Jul 22, 2021
Declared cost: $32,000
Permit fee: $41
Jul 22, 2021
Declared cost: $8,000
Permit fee: $100
Jul 22, 2021
Declared cost: $3,000
Permit fee: $25
Jul 21, 2021
Declared cost: $1,500
Permit fee: $40
Jul 20, 2021
Declared cost: $400
Permit fee: $30
Jul 16, 2021
Declared cost: $4,000,000
Permit fee: $780
Jul 9, 2021
Declared cost: $25,000
Permit fee: $26
Jul 7, 2021
Declared cost: $5,604
Permit fee: $80
Jun 30, 2021
Declared cost: $3,600
Permit fee: $60
Jun 29, 2021
Declared cost: $500
Permit fee: $30
Jun 24, 2021
Declared cost: $3,200
Permit fee: $26
Jun 22, 2021
Declared cost: $1,200
Permit fee: $40
Jun 18, 2021
Declared cost: $43,000
Permit fee: $598
Jun 18, 2021
Declared cost: $2,600
Permit fee: $522
Jun 18, 2021
Declared cost: $3,400
Permit fee: $60
Jun 18, 2021
Declared cost: $2,900
Permit fee: $50
Jun 17, 2021
Declared cost: $351,000
Permit fee: $45,160
Jun 17, 2021
Declared cost: $95,000
Permit fee: $970
Jun 16, 2021
Declared cost: $750,000
Permit fee: $7,030
Jun 16, 2021
Declared cost: $950,000
Permit fee: $248
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Commodore Builders
Status: Open
Jun 15, 2021
Declared cost: $2,000,000
Permit fee: $25,560
Jun 11, 2021
Declared cost: $169,000
Permit fee: $1,146
Jun 11, 2021
Declared cost: $14,000
Permit fee: $410
Jun 9, 2021
Declared cost: $336,280
Permit fee: $3,980
Jun 8, 2021
Declared cost: $3,200
Permit fee: $25
Jun 7, 2021
Declared cost: $65,000
Permit fee: $670
Jun 2, 2021
Declared cost: $300
Permit fee: $30
May 26, 2021
Declared cost: $149,789
Permit fee: $442
May 20, 2021
Declared cost: $10,000
Permit fee: $51
May 20, 2021
Declared cost: $500
Permit fee: $30
May 20, 2021
Declared cost: $1,200
Permit fee: $40
May 17, 2021
Declared cost: $2,000
Permit fee: $25
May 10, 2021
Declared cost: $133,000
Permit fee: $223
May 4, 2021
Permit fee: $25
Apr 30, 2021
Declared cost: $802,760
Permit fee: $8,940
Apr 16, 2021
Declared cost: $11,000
Permit fee: $160
Apr 12, 2021
Declared cost: $15,000
Permit fee: $170
Apr 12, 2021
Declared cost: $5,200
Permit fee: $80
Apr 9, 2021
Declared cost: $4,200
Permit fee: $320
Apr 2, 2021
Declared cost: $58,000
Permit fee: $117
Apr 1, 2021
Declared cost: $7,249,000
Permit fee: $1,550
Long Form/Alteration Permit FSTTRK
Fast track application
Contractor:
Emmanuel Venuti
Status: Closed
Mar 31, 2021
Declared cost: $950,000
Permit fee: $10,710
Mar 30, 2021
Declared cost: $100,000
Permit fee: $1,020
Mar 10, 2021
Declared cost: $4,100
Permit fee: $70