How to Get a Shed Permit in Ann Arbor, MI (2026 Guide)

Everything you need to know about shed permits in Ann Arbor, MI, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 15, 2026 · How we research →

$50 – $300 Permit Fees
about 2 weeks Approval Time
3 Local Rules

Check your specific shed project

Get an instant, personalized answer for your exact project details in Ann Arbor.

Free Permit Lookup →

Do You Need a Shed Permit in Ann Arbor?

Based on Ann Arbor's local building codes, you'll need a permit when:

Required·Rule 1

Sheds over 200 sq ft require a building permit.

SourceCity of Ann Arbor Code / 2015 MI Residential Code
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

SourceCity of Ann Arbor Code / 2015 MI Residential Code

These shed projects are typically exempt in Ann Arbor:

Exempt·Rule 1

Accessory structures (sheds) 200 sq ft or less are generally exempt from a building permit.

SourceCity of Ann Arbor Code / 2015 MI Residential Code

Permit Fees in Ann Arbor

Based on local Ann Arbor permit data, fees for shed projects typically range:

$50 – $300 Ann Arbor Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Small shed (under 200 sq ft, storage only)$50 – $150
Medium shed (200–400 sq ft)$100 – $300
Large shed or workshop (400+ sq ft)$150 – $500+
Electrical permit (if adding power to shed)$50 – $150 additional
Plumbing permit (if adding water)$50 – $200 additional
Habitable conversion (ADU/tiny home)$500 – $2,000+

Fees are typically calculated based on estimated project value. Contact Building, Rental and Inspection Services for exact amounts.

How Long Does It Take?

In Ann Arbor, typical approval time for shed permits is about 2 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a Shed Permit in Ann Arbor

  1. 1 Check requirements: Use our free lookup tool or contact Building, Rental and Inspection Services to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit online: Ann Arbor accepts applications online at Building, Rental and Inspection Services.
  4. 4 Pay fees: Pay the applicable permit fees ($50 – $300).
  5. 5 Wait for approval: Your application will be reviewed by Ann Arbor plan reviewers. Typical turnaround is about 2 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Building, Rental and Inspection Services at (734) 794-6263 to schedule required inspections at each phase of the project.

Ann Arbor Building Department Contact

NameBuilding, Rental and Inspection Services
Apply OnlineApply online
Address301 E. Huron Street, Ann Arbor, MI 48104
HoursMon-Fri 8am-5pm

Required Inspections in Ann Arbor

Most shed projects in Ann Arbor require inspections at each construction stage:

Inspection·Stage 1

Foundation Inspection, Forms and reinforcing are in place, proper depth below grade, rebar size and spacing, anchor bolt placement, and soil conditions. For simpler foundations (gravel pads), this inspection may be combined with the final.

WhenAfter the foundation is prepared but before the shed is placed or framing begins, applies to sheds on permanent foundations (concrete slabs, piers, or footings)
Common FailuresInsufficient depth, missing anchor bolts, improper rebar placement, foundation not matching approved plans.
Inspection·Stage 2

Framing Inspection (larger sheds), Lumber sizes and grades, connections and nailing patterns, hurricane ties and straps, header sizes over openings, and overall structural compliance with approved plans.

WhenAfter framing is complete but before sheathing and siding are installed, typically required only for larger site-built sheds
Common FailuresWrong lumber sizes, missing hurricane ties, inadequate connections, framing not matching approved plans.
Inspection·Stage 3

Final Inspection, Shed is in the correct location per the approved site plan, proper setbacks from property lines, adequate anchoring and tie-down, roof installation, door and window installation, drainage, and overall compliance with approved plans. If electrical was permitted, wiring and panel are checked separately.

WhenAfter all work is complete, for small sheds, this may be the only inspection required
Common FailuresShed not in the approved location, insufficient anchoring, setback violations, electrical work not to code.

Schedule inspections with Building, Rental and Inspection Services at (734) 794-6263 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your shed project. In Ann Arbor, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for shed projects in Ann Arbor typically range from $50 – $300. Fees are usually based on the estimated project value.

Typical approval time in Ann Arbor is about 2 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Ann Arbor can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Ann Arbor can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your shed project in Ann Arbor?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed Shed Rules for Ann Arbor

View all local rules, exemptions, and fee details on the permit page.

Shed Permit Rules →
Disclaimer: This guide provides general information about shed permit requirements in Ann Arbor, MI. Requirements can change. Always confirm with Building, Rental and Inspection Services before starting any project. PermitMint provides general guidance, not legal advice.