How to Get a Driveway Permit in Spokane, WA (2026 Guide)
Everything you need to know about driveway permits in Spokane, WA, local requirements, fees, timelines, and how to apply.
By Joey, Founder · Last updated May 15, 2026 · How we research →
Check your specific driveway project
Get an instant, personalized answer for your exact project details in Spokane.
Free Permit Lookup →Do You Need a Driveway Permit in Spokane?
Based on Spokane's local building codes, you'll need a permit when:
Any new curb cut requires an encroachment or right-of-way permit. This involves work in the public right-of-way and must meet ADA sidewalk crossing requirements. Contact your city's public works department.
New driveways require a permit. If a new curb cut is needed, an encroachment or right-of-way permit is also required for work in the public right-of-way. The driveway must meet width limits and impervious surface requirements.
Widening or extending an existing driveway typically requires a permit because it increases impervious surface coverage and may affect drainage. If the widening involves a modified curb cut, a right-of-way permit is also required.
These driveway projects are typically exempt in Spokane:
Replacing an existing driveway in the same footprint with no changes to the curb cut is generally exempt from permit requirements.
Permit Fees in Spokane
Based on local Spokane permit data, fees for driveway projects typically range:
Here's how fees break down by project scope nationally:
| Project Scope | Typical Permit Fee |
|---|---|
| Driveway replacement (same footprint, where permit needed) | $50 – $150 |
| New driveway permit | $100 – $400 |
| Curb cut / encroachment permit | $150 – $500+ |
| Driveway widening permit | $75 – $300 |
| Grading/drainage review (if triggered) | $100 – $400 additional |
Fees are typically calculated based on estimated project value. Contact Development Services Center for exact amounts.
How Long Does It Take?
In Spokane, typical approval time for driveway permits is about 3 weeks.
More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.
How to Apply for a Driveway Permit in Spokane
- 1 Check requirements: Use our free lookup tool or contact Development Services Center to confirm your project needs a permit.
- 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
- 3 Submit online: Spokane accepts applications online at Development Services Center.
- 4 Pay fees: Pay the applicable permit fees ($112 – $750).
- 5 Wait for approval: Your application will be reviewed by Spokane plan reviewers. Typical turnaround is about 3 weeks.
- 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
- 7 Schedule inspections: Call Development Services Center at (509) 625-6300 to schedule required inspections at each phase of the project.
Spokane Building Department Contact
Required Inspections in Spokane
Most driveway projects in Spokane require inspections at each construction stage:
Curb Cut / Approach Inspection, Approach dimensions meet city standards, sidewalk crossing is ADA-compliant (cross-slope, surface), drainage is directed to the street (not onto the sidewalk or neighboring property), and the curb transition is properly formed.
Final Inspection, Driveway matches approved site plan (location, dimensions, material), proper drainage slope away from the house and not toward neighbors, curb cut properly finished, and no encroachment beyond property lines.
Schedule inspections with Development Services Center at (509) 625-6300 at least 24–48 hours in advance.
Frequently Asked Questions
Whether you need a permit depends on the size and scope of your driveway project. In Spokane, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.
Permit fees for driveway projects in Spokane typically range from $112 – $750. Fees are usually based on the estimated project value.
Typical approval time in Spokane is about 3 weeks. Complex projects requiring structural review may take longer.
In most cases, homeowners in Spokane can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.
Working without a required permit in Spokane can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.
Ready to check your driveway project in Spokane?
Use our free lookup tool to get a personalized answer based on your specific project details.
Free Permit Lookup →Other Permit Guides for Spokane, WA
Explore more permit guides for Spokane:
Driveway Permits in Nearby Cities
See driveway permit requirements in other Washington cities:
See Detailed Driveway Rules for Spokane
View all local rules, exemptions, and fee details on the permit page.
Driveway Permit Rules →