How to Get a Demolition Permit in Pasadena, CA (2026 Guide)
Everything you need to know about demolition permits in Pasadena, CA, local requirements, fees, timelines, and how to apply.
By Joey, Founder · Last updated May 9, 2026 · How we research →
Check your specific demolition project
Get an instant, personalized answer for your exact project details in Pasadena.
Free Permit Lookup →Do You Need a Demolition Permit in Pasadena?
Based on Pasadena's local building codes, you'll need a permit when:
Full building demolition requires a demolition permit. All utilities (gas, electric, water, sewer) must be disconnected before work begins. An asbestos survey is required for structures built before 1978.
Demolition of structures built before 1978 requires a permit and an asbestos survey before any work begins. Federal EPA NESHAP regulations require asbestos-containing materials to be identified and properly abated. Lead paint may also be present and require special handling.
Partial demolition that involves removing structural elements (walls, roof sections, floors) requires a building permit. Structural plans may be required showing how the remaining structure will be supported.
These demolition projects are typically exempt in Pasadena:
Removing a small accessory structure (shed, carport, small outbuilding) built after 1978 and not in a historic district may be exempt from a demolition permit. However, utility disconnection and proper disposal are still required. Check with your building department.
Permit Fees in Pasadena
Based on local Pasadena permit data, fees for demolition projects typically range:
Here's how fees break down by project scope nationally:
| Project Scope | Typical Permit Fee |
|---|---|
| Small accessory structure removal (where permit needed) | $50 – $200 |
| Interior demolition / gutting permit | $100 – $500 |
| Partial structural demolition | $150 – $500 |
| Full residential building demolition | $200 – $1,000+ |
| Asbestos survey (pre-1978 structures) | $300 – $800 (separate from permit) |
| Asbestos abatement (if ACM found) | $1,500 – $15,000+ (separate from permit) |
Fees are typically calculated based on estimated project value. Contact Planning and Community Development - Building and Safety Division for exact amounts.
How Long Does It Take?
In Pasadena, typical approval time for demolition permits is about 3 weeks.
More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.
How to Apply for a Demolition Permit in Pasadena
- 1 Check requirements: Use our free lookup tool or contact Planning and Community Development - Building and Safety Division to confirm your project needs a permit.
- 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
- 3 Submit online: Pasadena accepts applications online at Planning and Community Development - Building and Safety Division.
- 4 Pay fees: Pay the applicable permit fees ($150 – $1,500).
- 5 Wait for approval: Your application will be reviewed by Pasadena plan reviewers. Typical turnaround is about 3 weeks.
- 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
- 7 Schedule inspections: Call Planning and Community Development - Building and Safety Division at (626) 744-4200 to schedule required inspections at each phase of the project.
Pasadena Building Department Contact
Required Inspections in Pasadena
Most demolition projects in Pasadena require inspections at each construction stage:
Pre-Demolition Inspection, Utilities are confirmed disconnected (gas, electric, water, sewer), asbestos abatement is complete (for pre-1978 structures), demolition permit is posted, erosion control measures are in place, and the contractor has proper equipment and safety measures.
Final Site Inspection, All structures fully removed, basement or foundation properly filled and compacted, site graded to drain properly (not toward neighboring properties), debris removed, erosion control in place, and the site is safe and stable.
Schedule inspections with Planning and Community Development - Building and Safety Division at (626) 744-4200 at least 24–48 hours in advance.
Frequently Asked Questions
Whether you need a permit depends on the size and scope of your demolition project. In Pasadena, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.
Permit fees for demolition projects in Pasadena typically range from $150 – $1,500. Fees are usually based on the estimated project value.
Typical approval time in Pasadena is about 3 weeks. Complex projects requiring structural review may take longer.
In most cases, homeowners in Pasadena can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.
Working without a required permit in Pasadena can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.
Ready to check your demolition project in Pasadena?
Use our free lookup tool to get a personalized answer based on your specific project details.
Free Permit Lookup →Other Permit Guides for Pasadena, CA
Explore more permit guides for Pasadena:
Demolition Permits in Nearby Cities
See demolition permit requirements in other California cities:
See Detailed Demolition Rules for Pasadena
View all local rules, exemptions, and fee details on the permit page.
Demolition Permit Rules →