How to Get a ADU Permit in Mission, TX (2026 Guide)

Everything you need to know about adu permits in Mission, TX, local requirements, fees, timelines, and how to apply.

By Joey, Founder · Last updated May 3, 2026 · How we research →

$500 – $5,000 Permit Fees
about 6 weeks Approval Time
3 Local Rules

Check your specific adu project

Get an instant, personalized answer for your exact project details in Mission.

Free Permit Lookup →

Do You Need a ADU Permit in Mission?

Based on Mission's local building codes, you'll need a permit when:

Required·Rule 1

Detached ADUs (new separate structures) require full building permits including electrical, plumbing, and mechanical. Check with your planning department for zoning approval and size limits.

SourceTexas Building Code / 2021 IRC with local amendments
Required·Rule 2

Converting an existing space (garage, basement, or other area) to an ADU requires building, electrical, and plumbing permits. The conversion must meet all residential building code requirements for habitable space including egress, insulation, ceiling height, and ventilation.

SourceTexas Building Code / 2021 IRC with local amendments
Required·Rule 3

Attached ADUs (additions to the existing house) require full building permits including all trades. This is treated as a room addition with the additional requirement of meeting ADU-specific zoning rules for independent living space.

SourceTexas Building Code / 2021 IRC with local amendments

Permit Fees in Mission

Based on local Mission permit data, fees for adu projects typically range:

$500 – $5,000 Mission Permit Fee Range

Here's how fees break down by project scope nationally:

Project ScopeTypical Permit Fee
Garage or basement conversion ADU$500 – $3,000
Attached ADU (addition)$800 – $5,000
Detached ADU (new construction)$1,000 – $8,000+
Impact fees (where applicable)$0 – $10,000+ (waived in many states)
Utility connection fees$1,000 – $5,000+ (for new water/sewer connections)
Architectural plans$2,000 – $10,000 (separate from permit)

Fees are typically calculated based on estimated project value. Contact Inspections Division for exact amounts.

How Long Does It Take?

In Mission, typical approval time for adu permits is about 6 weeks.

More complex projects requiring structural review or variances may take longer. Simple projects may qualify for expedited or over-the-counter review in some cases.

How to Apply for a ADU Permit in Mission

  1. 1 Check requirements: Use our free lookup tool or contact Inspections Division to confirm your project needs a permit.
  2. 2 Gather documents: Prepare your application, site plan, construction drawings, and any other required documents.
  3. 3 Submit your application: Visit Inspections Division or apply in person at 1201 E. 8th St., Mission, TX 78572.
  4. 4 Pay fees: Pay the applicable permit fees ($500 – $5,000).
  5. 5 Wait for approval: Your application will be reviewed by Mission plan reviewers. Typical turnaround is about 6 weeks.
  6. 6 Begin work: Once approved, post your permit visibly at the job site before starting work.
  7. 7 Schedule inspections: Call Inspections Division at (956) 580-8672 to schedule required inspections at each phase of the project.

Mission Building Department Contact

NameInspections Division
Address1201 E. 8th St., Mission, TX 78572
HoursMon-Fri 8am-5pm

Required Inspections in Mission

Most adu projects in Mission require inspections at each construction stage:

Inspection·Stage 1

Foundation Inspection, Footing dimensions, depth below frost line, rebar placement, anchor bolt locations, soil bearing conditions, and compliance with structural engineering plans.

WhenAfter footings are dug and forms/rebar are placed but before concrete is poured, for detached ADUs and attached additions
Common FailuresFooting not deep enough, rebar incorrectly placed, anchor bolts missing or mislocated.
Inspection·Stage 2

Framing Inspection, Wall framing, headers, connections to existing structure (for attached/conversions), fire separation between ADU and main house, egress windows/doors, ceiling height compliance, and overall structural integrity per approved plans.

WhenAfter all framing is complete but before insulation and drywall, inspector must see all structural work
Common FailuresFire separation not meeting code, ceiling height below minimum, egress window too small, connection to existing structure doesn't match engineering.
Inspection·Stage 3

Rough-In Trade Inspections, Electrical: circuits, GFCI/AFCI, panel capacity. Plumbing: DWV routing, supply lines, water heater, fixture connections. Mechanical: HVAC ductwork, ventilation, combustion air. All work must be visible.

WhenAfter electrical, plumbing, and mechanical work is installed but before walls are closed
Common FailuresElectrical panel capacity insufficient, plumbing venting incorrect, HVAC not properly sized for the ADU space.
Inspection·Stage 4

Final Inspection, All fixtures operational, smoke and CO detectors, GFCI tested, kitchen appliances connected, egress windows functional, address numbers posted, and overall compliance with approved plans. Certificate of occupancy issued upon passing.

WhenAfter all work is complete, finishes, fixtures, appliances, and all systems operational
Common FailuresSmoke/CO detectors not installed, GFCI not functional, kitchen not fully equipped, address not posted.

Schedule inspections with Inspections Division at (956) 580-8672 at least 24–48 hours in advance.

Frequently Asked Questions

Whether you need a permit depends on the size and scope of your adu project. In Mission, some smaller projects are exempt while larger ones require a permit. Use our free lookup tool to check your specific situation.

Permit fees for adu projects in Mission typically range from $500 – $5,000. Fees are usually based on the estimated project value.

Typical approval time in Mission is about 6 weeks. Complex projects requiring structural review may take longer.

In most cases, homeowners in Mission can pull permits and perform work on their own primary residence as an owner-builder. You're still responsible for meeting all code requirements and passing inspections.

Working without a required permit in Mission can result in fines, stop-work orders, required removal of completed work, and complications when selling your home.

Ready to check your adu project in Mission?

Use our free lookup tool to get a personalized answer based on your specific project details.

Free Permit Lookup →

See Detailed ADU Rules for Mission

View all local rules, exemptions, and fee details on the permit page.

ADU Permit Rules →
Disclaimer: This guide provides general information about adu permit requirements in Mission, TX. Requirements can change. Always confirm with Inspections Division before starting any project. PermitMint provides general guidance, not legal advice.