Tesla Energy

Public permit-pulling record, Massachusetts. Actively filing permits (most recent: 2026-04-07).

384 Permits filed
1 City worked in
2016 First permit on record

Permits filed by year

Volume trend in Massachusetts.

6 2016 132 2017 61 2018 12 2019 28 2020 22 2021 30 2022 41 2023 27 2024 20 2025 5 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Tesla Energy's public permit-pulling record in Massachusetts. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Massachusetts)

Permit counts per city for Tesla Energy.

Boston 384 permits

Most common project types

Based on permit_type codes in the underlying city data.

Electrical Permit 222
Short Form Bldg Permit 141
Long Form/alteration Permit 18
Amendment To A Long Form 3

Recent permits

The 20 most recent permits filed by Tesla Energy across all Massachusetts cities.

Date City Type Status Value
2026-04-07 Boston Electrical Permit Open $499
2026-03-20 Boston Electrical Permit Open $499
2026-02-25 Boston Electrical Permit Open $5,000
2026-02-06 Boston Electrical Permit Open $499
2026-01-12 Boston Long Form/Alteration Permit Closed $34,010
2025-12-16 Boston Electrical Permit Open $499
2025-11-21 Boston Electrical Permit Open $499
2025-11-21 Boston Electrical Permit Open $22,000
2025-10-14 Boston Long Form/Alteration Permit Closed $29,991
2025-09-30 Boston Electrical Permit Closed $34,010
2025-09-02 Boston Electrical Permit Closed $19,000
2025-08-22 Boston Electrical Permit Open $6,996
2025-08-21 Boston Electrical Permit Closed $700
2025-08-19 Boston Electrical Permit Open $500
2025-07-01 Boston Electrical Permit Closed $20,000
2025-06-24 Boston Electrical Permit Open $500
2025-06-02 Boston Electrical Permit Open $500
2025-04-10 Boston Electrical Permit Closed $500
2025-03-28 Boston Electrical Permit Open $500
2025-03-13 Boston Electrical Permit Closed $500

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Massachusetts?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.