Null Null; David Landsman

Public permit-pulling record, District of Columbia. Actively filing permits (most recent: 2026-04-08).

149 Permits filed
1 City worked in
2022 First permit on record

Permits filed by year

Volume trend in District of Columbia.

10 2022 52 2023 45 2024 38 2025 4 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Null Null; David Landsman's public permit-pulling record in District of Columbia. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (District of Columbia)

Permit counts per city for Null Null; David Landsman.

Washington Dc 149 permits

Most common project types

Based on permit_type codes in the underlying city data.

Construction 149

Recent permits

The 20 most recent permits filed by Null Null; David Landsman across all District of Columbia cities.

Date City Type Status Value
2026-04-08 Washington Dc CONSTRUCTION PERMIT ISSUED
2026-02-13 Washington Dc CONSTRUCTION PERMIT ISSUED
2026-01-30 Washington Dc CONSTRUCTION PERMIT ISSUED
2026-01-29 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-12-09 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-11-20 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-10-07 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-19 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-18 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-16 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-16 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-16 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-05 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-09-04 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-08-07 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-08-06 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-07-22 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-06-26 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-05-28 Washington Dc CONSTRUCTION PERMIT ISSUED
2025-05-14 Washington Dc CONSTRUCTION PERMIT ISSUED

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in District of Columbia?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.