U S A Fire Protection

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2025-11-20).

57 Permits filed
1 City worked in
2023 First permit on record

Permits filed by year

Volume trend in Arizona.

13 2023 15 2024 29 2025

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows U S A Fire Protection's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for U S A Fire Protection.

Phoenix 57 permits

Most common project types

Based on permit_type codes in the underlying city data.

Fp Auto Sprinkler Mod (1-20 Heads)-otc 20
Fp Auto Sprinkler Res-install/modify 19
Fp Auto Sprinkler Installation 8
Water Services Fire Flow 3
Fp Fire Protection Equip Companies 2
Fp Auto Sprinkler Modification 2

Recent permits

The 20 most recent permits filed by U S A Fire Protection across all Arizona cities.

Date City Type Status Value
2025-11-20 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-11-18 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC OPEN
2025-11-07 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-10-27 Phoenix WATER SERVICES FIRE FLOW OPEN
2025-10-16 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-10-15 Phoenix FP AUTO SPRINKLER RES-INSTALL/MODIFY DONE
2025-09-15 Phoenix WATER SERVICES FIRE FLOW OPEN
2025-08-18 Phoenix FP AUTO SPRINKLER INSTALLATION OPEN
2025-08-14 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-07-30 Phoenix FP AUTO SPRINKLER RES-INSTALL/MODIFY DONE
2025-07-29 Phoenix FP AUTO SPRINKLER INSTALLATION DONE
2025-07-01 Phoenix FP AUTO SPRINKLER RES-INSTALL/MODIFY DONE
2025-06-24 Phoenix FP AUTO SPRINKLER RES-INSTALL/MODIFY DONE
2025-06-16 Phoenix WATER SERVICES FIRE FLOW OPEN
2025-06-16 Phoenix FP AUTO SPRINKLER RES-INSTALL/MODIFY OPEN
2025-06-13 Phoenix FP AUTO SPRINKLER INSTALLATION DONE
2025-06-13 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-05-29 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-04-09 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-03-31 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC OPEN

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.