Okland Construction Company

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2026-04-15).

231 Permits filed
1 City worked in
2021 First permit on record

Permits filed by year

Volume trend in Arizona.

6 2021 17 2022 56 2023 73 2024 61 2025 18 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Okland Construction Company's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Okland Construction Company.

Phoenix 231 permits

Most common project types

Based on permit_type codes in the underlying city data.

Otc Elec 22
Struc/elec/plmb/mech 17
Struc 16
Grading/drainage Civil Permit 15
Fp Auto Sprinkler Mod (1-20 Heads)-otc 14
Electrical 14

Recent permits

The 20 most recent permits filed by Okland Construction Company across all Arizona cities.

Date City Type Status Value
2026-04-15 Phoenix STORM WATER MGT CIVIL PERMIT OPEN
2026-03-25 Phoenix UNDERGROUND FIRELINE OR HYDRANT MOD OPEN
2026-03-11 Phoenix OTC ELEC OPEN
2026-03-11 Phoenix ELECTRICAL OPEN
2026-03-10 Phoenix OTC ELEC OPEN
2026-03-09 Phoenix FP FIRE APPARATUS ACCESS ROAD(ALT OR INT OPEN
2026-03-04 Phoenix PLMB/MECH/ELEC OPEN
2026-02-23 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC OPEN
2026-02-03 Phoenix STRUC OPEN
2026-01-30 Phoenix STRUC/ELEC/PLMB/MECH OPEN
2026-01-30 Phoenix STRUC/ELEC/PLMB/MECH OPEN
2026-01-28 Phoenix DEMOLITION DONE
2026-01-16 Phoenix ELECTRICAL OPEN
2026-01-13 Phoenix CIVIL LANDSCAPE PERMIT OPEN
2026-01-13 Phoenix STRUC OPEN
2026-01-09 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2026-01-08 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2026-01-05 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC OPEN
2025-11-05 Phoenix STRUC/ELEC/PLMB/MECH OPEN
2025-10-29 Phoenix FP EMERGENCY ACCESS OPEN

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.