Johnson Controls Inc.

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2026-02-06).

62 Permits filed
1 City worked in
2022 First permit on record

Permits filed by year

Volume trend in Arizona.

2 2022 6 2023 20 2024 32 2025 2 2026

Also operates in

Johnson Controls Inc. also has permit records in these states. Click to see their detail page there.

Arizona · 62 (this page) Nevada · 1

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Johnson Controls Inc.'s public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Johnson Controls Inc..

Phoenix 62 permits

Most common project types

Based on permit_type codes in the underlying city data.

Fp Alarm System Dialer-otc 18
Fp Fire Alarm Mod-otc-w/ Or W/o Pwr Bstr 15
Fp Fire Alarm Installation 9
Fp Fire Alarm Modification 6
Water Services Shutdown 3
Fp Fire Protection Equip Companies 2

Recent permits

The 20 most recent permits filed by Johnson Controls Inc. across all Arizona cities.

Date City Type Status Value
2026-02-06 Phoenix FP FIRE ALARM MODIFICATION OPEN
2026-01-05 Phoenix FP FIRE ALARM INSTALLATION OPEN
2025-12-19 Phoenix FP FIRE PROTECTION EQUIP COMPANIES OPEN
2025-12-16 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC DONE
2025-11-13 Phoenix FP FIRE ALARM INSTALLATION OPEN
2025-10-31 Phoenix WATER SERVICES SHUTDOWN OPEN
2025-10-29 Phoenix FP ALARM SYSTEM DIALER-OTC DONE
2025-10-21 Phoenix WATER SERVICES SHUTDOWN OPEN
2025-10-20 Phoenix FP FIRE ALARM MODIFICATION DONE
2025-10-02 Phoenix FP FIRE ALARM MODIFICATION OPEN
2025-07-28 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-07-17 Phoenix FP FIRE ALARM INSTALLATION OPEN
2025-06-06 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR DONE
2025-04-25 Phoenix FP AUTO SPRINKLER MODIFICATION DONE
2025-04-11 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-04-11 Phoenix FP FIRE PROTECTION EQUIP COMPANIES OPEN
2025-04-10 Phoenix WATER SERVICES SHUTDOWN OPEN
2025-04-09 Phoenix FP FIRE ALARM INSTALLATION DONE
2025-04-03 Phoenix FP ALARM SYSTEM DIALER-OTC DONE
2025-04-01 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR OPEN

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.