Greenlight Construction Llc

Public permit-pulling record, Arizona. Last permit filed 2025-03-19.

107 Permits filed
1 City worked in
2022 First permit on record

Permits filed by year

Volume trend in Arizona.

22 2022 51 2023 21 2024 13 2025

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Greenlight Construction Llc's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Greenlight Construction Llc.

Phoenix 107 permits

Most common project types

Based on permit_type codes in the underlying city data.

Struc/elec/plmb/mech 23
Temporary Certificate Of Occupancy 16
Civil Pavement Restoration 13
Wtr Services Dust Control Hydrant Meter 5
Storm Water Mgt Civil Permit 5
Grading/drainage Civil Permit 5

Recent permits

The 20 most recent permits filed by Greenlight Construction Llc across all Arizona cities.

Date City Type Status Value
2025-03-19 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-03-18 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-03-18 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-03-18 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-03-18 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-03-18 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-02-20 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC DONE
2025-02-11 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-01-31 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-01-31 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-01-29 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-01-21 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC DONE
2025-01-13 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2024-12-02 Phoenix FP EMERGENCY ACCESS DONE
2024-12-02 Phoenix FP EMERGENCY ACCESS DONE
2024-11-05 Phoenix WTR SERVICES DUST CONTROL HYDRANT METER DONE
2024-09-30 Phoenix WTR SERVICES DUST CONTROL HYDRANT METER DONE
2024-09-19 Phoenix MISCELLANEOUS CIVIL PERMIT DONE
2024-09-09 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2024-08-21 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.