Aligned Energy Data Center I-647

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2026-04-13).

100 Permits filed
1 City worked in
2021 First permit on record

Permits filed by year

Volume trend in Arizona.

3 2021 8 2022 25 2023 25 2024 23 2025 16 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Aligned Energy Data Center I-647's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Aligned Energy Data Center I-647.

Phoenix 100 permits

Most common project types

Based on permit_type codes in the underlying city data.

Struc/mech/elec 12
Fp Fire Alarm Mod-otc-w/ Or W/o Pwr Bstr 12
Otc Elec 8
Fp Auto Sprinkler Modification 8
Struc/elec/plmb/mech 6
Fp Fire Alarm Modification 6

Recent permits

The 20 most recent permits filed by Aligned Energy Data Center I-647 across all Arizona cities.

Date City Type Status Value
2026-04-13 Phoenix STRUC/ELEC OPEN
2026-04-13 Phoenix STRUC/ELEC OPEN
2026-04-09 Phoenix STRUC/ELEC OPEN
2026-04-09 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR OPEN
2026-04-02 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY OPEN
2026-04-02 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY OPEN
2026-03-10 Phoenix ELECTRICAL OPEN
2026-03-05 Phoenix FP STATIONARY LEAD-ACID BATTERY SYSTEM OPEN
2026-03-05 Phoenix FP STATIONARY LEAD-ACID BATTERY SYSTEM OPEN
2026-03-03 Phoenix FP STATIONARY LEAD-ACID BATTERY SYSTEM OPEN
2026-02-09 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR DONE
2026-02-09 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR DONE
2026-01-28 Phoenix STRUC OPEN
2026-01-26 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC OPEN
2026-01-21 Phoenix STRUC/MECH/ELEC OPEN
2026-01-21 Phoenix FP AUTO SPRINKLER MODIFICATION OPEN
2025-12-08 Phoenix OTC PLMB OPEN
2025-08-28 Phoenix FP FIRE ALARM MODIFICATION OPEN
2025-07-22 Phoenix FP FIRE ALARM MODIFICATION DONE
2025-07-17 Phoenix FP FLAMM/COMBUST LIQ TANK INSTALL A/G DONE

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.