Afp I-0901

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2026-04-10).

55 Permits filed
1 City worked in
2023 First permit on record

Permits filed by year

Volume trend in Arizona.

4 2023 21 2024 23 2025 7 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Afp I-0901's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Afp I-0901.

Phoenix 55 permits

Most common project types

Based on permit_type codes in the underlying city data.

Struc/elec/plmb/mech 8
Temporary Certificate Of Occupancy 7
Fp Auto Sprinkler Modification 4
Struc/elec 3
Struc 3
High Pile Combustible Storage 3

Recent permits

The 20 most recent permits filed by Afp I-0901 across all Arizona cities.

Date City Type Status Value
2026-04-10 Phoenix HIGH PILE COMBUSTIBLE STORAGE OPEN
2026-03-30 Phoenix FP FIRE ALARM MODIFICATION OPEN
2026-03-25 Phoenix PLUMBING OPEN
2026-03-20 Phoenix FP COMPRESSED GAS SYSTEM INSTALL/MODIFY OPEN
2026-03-06 Phoenix ELECTRICAL OPEN
2026-03-05 Phoenix STRUC OPEN
2026-03-03 Phoenix STRUC/ELEC/PLMB/MECH OPEN
2025-12-10 Phoenix DEMOLITION DONE
2025-11-15 Phoenix HIGH PILE COMBUSTIBLE STORAGE DONE
2025-11-05 Phoenix DEMOLITION DONE
2025-10-01 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-08-03 Phoenix STRUC/ELEC OPEN
2025-08-03 Phoenix STRUC DONE
2025-07-26 Phoenix STRUC/ELEC/PLMB/MECH DONE
2025-07-22 Phoenix HAZARDOUS MATERIAL TANK INSTALLATION OPEN
2025-07-21 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-06-13 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-06-04 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-05-28 Phoenix STRUC/ELEC DONE
2025-05-08 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.