Afp I-0858

Public permit-pulling record, Arizona. Actively filing permits (most recent: 2026-04-09).

69 Permits filed
1 City worked in
2023 First permit on record

Permits filed by year

Volume trend in Arizona.

2 2023 40 2024 21 2025 6 2026

Why this page exists

Most contractor-finder sites check state license status but don't verify that the contractor actually pulls permits when required. A licensed contractor who skips permits leaves the homeowner holding the bag, code violations, insurance complications, and problems at resale.

This page shows Afp I-0858's public permit-pulling record in Arizona. It's sourced from official city open-data feeds, not self-reported. If you're interviewing contractors, ask the ones you're considering to explain any gaps or closed permits you see here.

Cities worked in (Arizona)

Permit counts per city for Afp I-0858.

Phoenix 69 permits

Most common project types

Based on permit_type codes in the underlying city data.

Fp Fire Alarm Modification 12
Struc/elec/plmb/mech 11
Fp Auto Sprinkler Modification 10
Struc/mech/elec 7
Fp Auto Sprinkler Mod (1-20 Heads)-otc 6
Demolition 6

Recent permits

The 20 most recent permits filed by Afp I-0858 across all Arizona cities.

Date City Type Status Value
2026-04-09 Phoenix STRUC/ELEC/PLMB/MECH OPEN
2026-03-27 Phoenix FP FIRE ALARM MOD-OTC-W/ OR W/O PWR BSTR OPEN
2026-03-17 Phoenix STRUC/MECH/ELEC OPEN
2026-02-20 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC OPEN
2026-02-20 Phoenix DEMOLITION DONE
2026-02-02 Phoenix STRUC/MECH/ELEC OPEN
2025-12-17 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC DONE
2025-12-10 Phoenix STRUC/ELEC DONE
2025-10-29 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY OPEN
2025-10-10 Phoenix TEMPORARY CERTIFICATE OF OCCUPANCY DONE
2025-10-09 Phoenix STRUC/ELEC DONE
2025-10-07 Phoenix FP FIRE ALARM MOD-SPEC EGRESS-OTC DONE
2025-10-01 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-09-15 Phoenix STRUC/MECH/ELEC DONE
2025-09-05 Phoenix STRUC OPEN
2025-08-13 Phoenix FP ALARM SYSTEM DIALER-OTC DONE
2025-07-17 Phoenix FP AUTO SPRINKLER MOD (1-20 HEADS)-OTC DONE
2025-05-07 Phoenix FP FIRE ALARM MODIFICATION DONE
2025-05-05 Phoenix FP AUTO SPRINKLER MODIFICATION OPEN
2025-04-16 Phoenix FP FIRE ALARM MODIFICATION DONE

How to vet this contractor further

  • Check their state license with your state's licensing board. This page shows permit behavior, not license status.
  • Ask for 3 recent references from the cities above. Match them against the permit addresses here.
  • Look for gaps. Are there years with many permits, then nothing? Contractors sometimes let licenses lapse or change business names.
  • Verify active bonding and workers' comp insurance. Ask for certificates directly from the insurer, not a copy from the contractor.

Planning a project in Arizona?

Check whether your project needs a permit before you get contractor bids, so you can compare apples to apples.

Check permit requirements →
Data source: Public permit records from the cities above, pulled via their official open-data APIs. We report what the city shows; we do not verify license status, insurance, or workmanship. This is not an endorsement. Always do your own due diligence.