Water Heater Permit Requirements in Wild Rose, WI

Village of Wild Rose is a small village (2020 pop. 780) in Waushara County, central Wisconsin lake country (Pine Lake, Wild Rose Millpond). The village administers permits through the Clerk/Treasurer (Lindsey Inda) at the Village Hall, 500 Main Street. Permit application intake is paper-only via three downloadable PDFs from the Forms & Permits page: Building Permit, Electrical Permit, and HVAC Permit (all use the Wisconsin Uniform Building Permit Application form SBD-5823 issued by DSPS). Per village ordinance, a permit is required for fences, additions, leaf burning, and accessory storage structures. One- and two-family dwellings are enforced under the Wisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code chs. SPS 320-325, administered by the Wisconsin Department of Safety and Professional Services (DSPS). Like most small WI villages, Wild Rose contracts UDC inspections to a state-certified third-party inspector; the specific contracted firm is not published on the village website, so applicants should call the Clerk's Office for current inspector assignment. Commercial projects fall under the Wisconsin Commercial Building Code (SPS 360-366) and are inspected through DSPS or a delegated agent. Septic / private onsite wastewater treatment system (POWTS) permits are issued by the Waushara County Sanitarian (county-level). Shoreland zoning applies to parcels within 1,000 ft of Pine Lake / Wild Rose Millpond or 300 ft of navigable streams under Wis. Admin. Code NR 115; that is administered by Waushara County Planning and Zoning. Floodplain (NR 116) and DNR navigable-water permits also apply near shorelines. Climate Zone 6B, ASCE 7 ground snow load approximately 40-50 psf, frost depth 48-50 inches. The Village Code is published at ecode360.com/WI3923. Clerk email and phone verified from the official village site (villageofwildrose.com).

By Joey, Founder · Last verified May 26, 2026 · How we research →

Population: 780 Code: Wisconsin UDC (SPS 320-325) Verified: 2026-05-26 2 local rules

When you need a Water Heater permit in Wild Rose

Required·Rule 1

Water heater replacement (same fuel type, similar capacity) requires a plumbing permit from the Village of Wild Rose. Wisconsin DSPS-credentialed master or journeyman plumber required. T&P relief valve discharge per WI UDC SPS 320-325 (DSPS) water heater requirements is required.

Estimated Fee$75 – $150
Typical Timeline5 business days
SourceVillage of Wild Rose / WI UDC (SPS 320-325) state-certified UDC inspector · view source
Required·Rule 2

Changing fuel type (electric to gas, gas to tankless, etc.) requires plumbing, mechanical, and possibly electrical permits from the Village of Wild Rose. Wisconsin DSPS-credentialed master or journeyman plumber, gas-fitter, and electrician required.

Estimated Fee$150 – $350
Typical Timelineabout 2 weeks
SourceVillage of Wild Rose / WI UDC (SPS 320-325) state-certified UDC inspector · view source

Water Heater Permit Costs: Wild Rose vs. Nearby

Wild Rose's fees are right in line with the Wisconsin average, $75 – $350 versus $93 – $378 statewide.

CityEstimated Fee
Wild Rose $75 – $350
Milwaukee $25 – $500
Madison $25 – $500
Green Bay $25 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Wild Rose permit costs →

Zoning Considerations

Zoning

Water heater installation is almost never subject to zoning review, it is a plumbing and mechanical code matter. Exterior tankless units on the outside of the house may be subject to minor setback rules in some jurisdictions.

Estimated Project Timeline in Wild Rose

Here's a typical timeline for a water heater project in Wild Rose, WI:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Wild Rose's building department.
Week 3-4
Plan review & approval
Typical processing time in Wild Rose: about 2 weeks. Application review and permit issuance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Wild Rose's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Water Heater permit in Wild Rose, WI?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Wild Rose Clerk's Office
Address500 Main Street, PO Box 292, Wild Rose, WI 54984-0292
HoursMonday-Friday 8:00 AM to 4:00 PM

Frequently Asked Questions

Estimated permit fees for Water Heater projects in Wild Rose, WI range from $75 – $350. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Water Heater projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Wild Rose can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Water Heater permits in Wild Rose is 5 business days. More complex projects may take longer if plan review is required.

Learn More About Water Heater Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Water Heater Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-26. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.