EV Charger Permit Requirements in Wild Rose, WI
Village of Wild Rose is a small village (2020 pop. 780) in Waushara County, central Wisconsin lake country (Pine Lake, Wild Rose Millpond). The village administers permits through the Clerk/Treasurer (Lindsey Inda) at the Village Hall, 500 Main Street. Permit application intake is paper-only via three downloadable PDFs from the Forms & Permits page: Building Permit, Electrical Permit, and HVAC Permit (all use the Wisconsin Uniform Building Permit Application form SBD-5823 issued by DSPS). Per village ordinance, a permit is required for fences, additions, leaf burning, and accessory storage structures. One- and two-family dwellings are enforced under the Wisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code chs. SPS 320-325, administered by the Wisconsin Department of Safety and Professional Services (DSPS). Like most small WI villages, Wild Rose contracts UDC inspections to a state-certified third-party inspector; the specific contracted firm is not published on the village website, so applicants should call the Clerk's Office for current inspector assignment. Commercial projects fall under the Wisconsin Commercial Building Code (SPS 360-366) and are inspected through DSPS or a delegated agent. Septic / private onsite wastewater treatment system (POWTS) permits are issued by the Waushara County Sanitarian (county-level). Shoreland zoning applies to parcels within 1,000 ft of Pine Lake / Wild Rose Millpond or 300 ft of navigable streams under Wis. Admin. Code NR 115; that is administered by Waushara County Planning and Zoning. Floodplain (NR 116) and DNR navigable-water permits also apply near shorelines. Climate Zone 6B, ASCE 7 ground snow load approximately 40-50 psf, frost depth 48-50 inches. The Village Code is published at ecode360.com/WI3923. Clerk email and phone verified from the official village site (villageofwildrose.com).
By Joey, Founder · Last verified May 26, 2026 · How we research →
When you don’t need a EV Charger permit in Wild Rose
A Level 1 EV charger that plugs into an existing 120V outlet does not require a Village of Wild Rose permit. No new wiring is involved.
When you need a EV Charger permit in Wild Rose
A Level 2 EV charger (240V hardwired) requires an electrical permit from the Village of Wild Rose and a Wisconsin DSPS-credentialed master or journeyman electrician. A dedicated 40A or 50A circuit is typically required.
EV Charger Permit Costs: Wild Rose vs. Nearby
Wild Rose comes in on the low side for Wisconsin. You're looking at $75 – $175 here, compared to the state average of $99 – $343.
| City | Estimated Fee |
|---|---|
| Wild Rose | $75 – $175 |
| Milwaukee | $75 – $500 |
| Madison | $75 – $500 |
| Green Bay | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Wild Rose permit costs →
Zoning Considerations
EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.
Estimated Project Timeline in Wild Rose
Here's a typical timeline for a ev charger project in Wild Rose, WI:
Timeline is based on Wild Rose's typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need an EV Charger permit in Wild Rose, WI?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Estimated permit fees for EV Charger projects in Wild Rose, WI range from $75 – $175. Fees vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Wild Rose can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for EV Charger permits in Wild Rose is about 1 week. More complex projects may take longer if plan review is required.