EV Charger Permit Requirements in Village of Salem Lakes, WI

The Village of Salem Lakes was created February 21, 2017 by the consolidation of the Town of Salem and the Village of Silver Lake into a single village government. ZIP 53179 (Trevor, WI) is an unincorporated community within Salem Lakes; mailing addresses for Trevor route through the Trevor or Silver Lake post offices but the actual permit-issuing jurisdiction is the Village of Salem Lakes. The village Building Inspection Department at 9814 Antioch Road in Salem (the village hall) issues all building, electrical, plumbing, and HVAC permits and enforces the Wisconsin Uniform Dwelling Code. Wisconsin has a STRONG STATEWIDE code framework administered by the Department of Safety and Professional Services (DSPS): (1) 1- and 2-family dwellings — Wisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code SPS 320-325, base referenced to the 2015 IRC with extensive Wisconsin amendments; (2) Commercial buildings — Wis. Admin. Code SPS 361-366, incorporating 2015 IBC with WI amendments; (3) Electrical — Wis. Admin. Code SPS 316, adopting NFPA 70 / NEC 2017 statewide; (4) Plumbing — Wis. Admin. Code SPS 382-387 (Wisconsin's OWN plumbing code, NOT the IPC); (5) Energy — SPS 322 (residential, UDC-integrated) and SPS 363 (commercial). IECC Climate Zone 6A (cold-humid). Standard frost depth in southern Kenosha County is 48 inches per SPS 321.18. Wisconsin contractor licensing is handled by DSPS: Dwelling Contractor Certification (business-level, required for any company doing 1-2 family residential), Dwelling Contractor Qualifier (DCQ) (individual certification tied to the company; 12-hour continuing education every 4 years), Master and Journeyman Electrician licenses (NEC-based exam), Master and Journeyman Plumber licenses (Wisconsin plumbing code exam). Wisconsin does NOT license HVAC technicians at the state level (refrigeration certification is separate). Distinctive features for 53179 / Salem Lakes projects: (1) MULTIPLE NAVIGABLE LAKES — Camp Lake, Center Lake, Hooker Lake, Powers Lake, Cross Lake, and Lake Shangrila are all navigable and trigger the Wisconsin Shoreland Management Program (NR 115). Key rules: 75-foot principal-structure setback from the Ordinary High Water Mark (OHWM), 35-foot vegetative buffer, and 15% impervious-surface cap within 300 feet of OHWM; mitigation is required for any non-conforming-structure expansion. (2) FLOODPLAIN — NR 116 statewide standards; FEMA NFIP administered locally via the Kenosha County Floodplain Ordinance with the village. (3) WETLANDS — Wisconsin DNR jurisdiction under NR 103; the Fox River and Bassett Creek corridors traverse Salem Lakes and trigger Wis. Stat. Ch. 30 navigable-waterway permits for any in-water or below-OHWM work. (4) STORMWATER — village handles general site stormwater; Kenosha County overlays municipal authority on shoreland, floodplain, and non-metallic mining. (5) SEPTIC / POWTS — Many older Salem Lakes parcels are on Private Onsite Wastewater Treatment Systems (POWTS) regulated under SPS 383-385; system installers must hold a DSPS Master Plumber Restricted Service license; soils evaluation and tank/drainfield permits are issued through Kenosha County Health Department. (6) ELECTRICAL UTILITY — We Energies serves most of Salem Lakes; coordinate service-entrance and meter-base work with We Energies before the village final inspection. (7) PRIVATE WELL — many parcels rely on private wells regulated under NR 812 (well-construction code), inspected by Wisconsin DNR.

By Joey, Founder · Last verified April 28, 2026 · How we research →

Population: 14,782 Code: Wisconsin Uniform Dwelling Code (Wis. Admin. Code SPS 321; based on 2015 IRC with WI amendments) Verified: 2026-04-28 2 local rules

When you don’t need a EV Charger permit in Village of Salem Lakes

Exempt·Rule 1

A Level-1 EV charger that plugs into an existing 120V outlet does not require a permit. If the outlet itself is being added or relocated, that's a new electrical circuit requiring a permit under SPS 316.

SourceSalem Lakes Building Inspection / Wisconsin SPS 316.030 · view source

When you need a EV Charger permit in Village of Salem Lakes

Required·Rule 1

A Level-2 EV charger (240V) requires an electrical permit because the dedicated circuit (typically 40A or 50A) is a new installation under Wisconsin SPS 316. NEC Article 625 governs EV charging equipment installation.

Estimated Fee$100 – $200
Typical Timeline5 business days
SourceSalem Lakes Building Inspection / Wisconsin SPS 316; NEC Article 625 · view source

EV Charger Permit Costs: Village of Salem Lakes vs. Nearby

Village of Salem Lakes's fees are right in line with the Wisconsin average, $100 – $200 versus $100 – $345 statewide.

CityEstimated Fee
Village of Salem Lakes $100 – $200
Milwaukee $75 – $500
Madison $75 – $500
Green Bay $75 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Village of Salem Lakes permit costs →

Zoning & HOA Considerations

Zoning

EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.

HOA Communities

If you live in an HOA community: most states with "right to charge" laws (CA, CO, FL, HI, MD, NY, OR, VA) prohibit HOAs from blocking EV charger installation in a resident's exclusive-use parking space. Even in these states, HOAs may still set reasonable aesthetic and placement standards. Check your state law and CC&Rs before installing.

Estimated Project Timeline in Village of Salem Lakes

Here's a typical timeline for a ev charger project in Village of Salem Lakes, WI:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Village of Salem Lakes's building department, apply online here.
Week 4
Plan review & approval
Typical processing time in Village of Salem Lakes: 5 business days. Plan review examiner checks drawings for code compliance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Village of Salem Lakes's typical 5 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need an EV Charger permit in Village of Salem Lakes, WI?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Salem Lakes Building Inspection Department
Address9814 Antioch Road (Hwy 83), Salem, WI 53168
HoursMonday-Friday 8:00 AM - 4:30 PM

Frequently Asked Questions

Estimated permit fees for EV Charger projects in Village of Salem Lakes, WI range from $100 – $200. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Village of Salem Lakes can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for EV Charger permits in Village of Salem Lakes is 5 business days. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About EV Charger Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read EV Charger Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-04-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.