Gas Line Permit Requirements in Village of Coleman, WI

The Village of Coleman is a small chartered village (~726 population per 2020 census) in southern Marinette County, Wisconsin. The village handles its own zoning permits and may contract building inspection through a third-party Wisconsin DSPS-certified UDC inspector (common pattern for small WI villages). For unincorporated parcels in 54112 (which extends into the Town of Pound and surrounding rural townships), Marinette County Zoning Office at 1926 Hall Avenue in Marinette, (715) 732-7535, is the AHJ. Wisconsin has a STRONG STATEWIDE code framework administered by the Department of Safety and Professional Services (DSPS): the Wisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code SPS 320-325, base referenced to the 2015 IRC with extensive Wisconsin amendments; SPS 361-366 for commercial (2015 IBC base); SPS 316 for electrical (NEC 2017 statewide); SPS 382-387 for plumbing (Wisconsin's OWN plumbing code, NOT IPC); SPS 322 for residential energy. IECC Climate Zone 6A (cold-humid) for southern Marinette County. Standard frost depth per SPS 321.16(1)(a) is the deeper of frost penetration or 48 inches. Wisconsin contractor licensing is handled by DSPS: Dwelling Contractor Certification + Dwelling Contractor Qualifier (DCQ) for general contractors, Master and Journeyman Electrician licenses, Master and Journeyman Plumber licenses. Distinctive features for 54112 / Coleman / southern Marinette County projects: (1) RURAL AGRICULTURAL DOMINANCE — the area around Coleman is mostly farmland and small woodlots; rolling agricultural zoning allows by-right residential and agricultural construction with minimal setbacks. (2) PESHTIGO RIVER WATERSHED — drainage flows north toward the Peshtigo River; floodplain provisions per Wisconsin NR 116 apply along the river corridor. (3) POWTS (PRIVATE SEPTIC) — most non-village parcels use Private Onsite Wastewater Treatment Systems (POWTS) regulated under SPS 383-385; system installers must hold a DSPS Master Plumber Restricted Service license; Marinette County Health Department issues sanitary permits separately from building permits. (4) WIS DOT DRIVEWAY PERMITS — driveways onto state-maintained routes (US-141, US-41, STH-64) require Wisconsin Department of Transportation Trans 231 entrance permits. (5) WPS / We Energies — the area is served by Wisconsin Public Service (WPS, a subsidiary of WEC Energy Group) for both electric and gas. (6) HEAVY SNOW LOADS — design ground snow load of approximately 50 psf per ASCE 7 maps for southern Marinette County. (7) RURAL VOLUNTEER FIRE — most fire response is volunteer-based; site access for emergency vehicles should be planned at design time. (8) HISTORIC PESHTIGO FIRE (1871) AREA — broader north WI / Marinette County context for forest-fire awareness.

By Joey, Founder · Last verified May 1, 2026 · How we research →

Population: 726 Code: Wisconsin Uniform Dwelling Code (Wis. Admin. Code SPS 321; based on 2015 IRC with WI amendments) Verified: 2026-05-01 2 local rules

When you need a Gas Line permit in Village of Coleman

Required·Rule 1

Any new gas-line connection or extension requires a plumbing/gas permit. Wisconsin requires a DSPS Master Plumber license (which includes gas-fitting authority under SPS 305.92) for paid work, and SPS 384 (fuel gas code) governs design.

Estimated Fee$85 – $200
Typical Timeline5 business days
SourceMarinette County Zoning Office (unincorporated) / Village of Coleman (incorporated) / Wisconsin SPS 384 · view source
Required·Rule 2

Relocating a gas service or meter requires both a plumbing/gas permit and utility coordination with Wisconsin Public Service (WPS) (gas service). Wisconsin SPS 384 governs material selection (CSST, black iron) and pressure testing.

Estimated Fee$150 – $400
Typical Timelineabout 2 weeks
SourceMarinette County Zoning Office (unincorporated) / Village of Coleman (incorporated) / Wisconsin SPS 384 · view source

Gas Line Permit Costs: Village of Coleman vs. Nearby

Village of Coleman runs higher than average for Wisconsin. Expect $85 – $400 versus the state average of $69 – $331.

CityEstimated Fee
Village of Coleman $85 – $400
Milwaukee $50 – $400
Madison $50 – $400
Green Bay $50 – $400

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Village of Coleman permit costs →

Zoning Considerations

Zoning

Gas line work itself does not typically trigger zoning review, but outdoor gas lines to appliances (fire pits, pool heaters, outdoor kitchens, generators) may be subject to setback rules based on the appliance being served.

Estimated Project Timeline in Village of Coleman

Here's a typical timeline for a gas line project in Village of Coleman, WI:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Village of Coleman's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Village of Coleman: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Village of Coleman's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Gas Line permit in Village of Coleman, WI?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameMarinette County Zoning Office (unincorporated) / Village of Coleman (incorporated)
AddressMarinette County: 1926 Hall Avenue, Marinette, WI 54143; Village of Coleman: PO Box 219, Coleman, WI 54112
HoursMonday-Friday 8:00 AM - 4:30 PM

Frequently Asked Questions

Estimated permit fees for Gas Line projects in Village of Coleman, WI range from $85 – $400. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Gas Line projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Village of Coleman can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Gas Line permits in Village of Coleman is 5 business days. More complex projects may take longer if plan review is required.

Learn More About Gas Line Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Gas Line Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-01. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.