Plumbing Work Permit Requirements in Bristol, WI

Bristol Kenosha County (not Bristol Dane County). On WI DSPS delegated-municipality list, entry 415. Village Administrator Randy Kerkman is the dept contact per DSPS. Kenosha County zoning excludes Bristol (village governs its own). Not shared with neighboring Salem Lakes village. Online portal: InspectWiz. WI enforces its own UDC for 1-2 family homes.

By Joey, Founder · Last verified May 28, 2026 · How we research →

Population: 5,000 Code: 2021 Verified: 2026-05-28 1 local rules

When you need a Plumbing permit

Required·Rule 1

Plumbing work beyond like-for-like fixture replacement (new fixtures, moved drain/vent, water service, sewer service) requires a Wisconsin plumbing permit under SPS 382 from the Village of Bristol via InspectWiz. Wisconsin uses its own state plumbing code, not the IPC. A DSPS Master Plumber license is required for paid residential work. Kenosha County Division of Health handles POWTS (private septic) review under SPS 383 for parcels on septic.

Typical Timeline5 business days
SourceVillage of Bristol Building Inspection / WI SPS 382 plumbing · view source

Plumbing Work Permit Costs: Bristol vs. Nearby

CityEstimated Fee
Bristol N/A
Milwaukee $50 – $600
Madison $50 – $600
Green Bay $50 – $600

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Bristol permit costs →

Estimated Project Timeline

Here's a typical timeline for a plumbing work project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Bristol's building department, apply online here.
Week 3
Plan review & approval
Typical processing time: 5 business days. Application review and permit issuance.
Week 4+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical 5 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Plumbing permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Bristol Building Inspection Department
Address19801 83rd Street, Bristol, WI 53104
HoursMon-Fri 8am-4pm Village Hall; inspections Tue and Thu mornings, 24hr notice required

Frequently Asked Questions

Contact the building department for current Plumbing Work permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Plumbing Work projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Plumbing Work permits is 5 business days. More complex projects may take longer if plan review is required.

Learn More About Plumbing Work Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Plumbing Work Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.