Fireplace Permit Requirements in Bristol, WI
Bristol Kenosha County (not Bristol Dane County). On WI DSPS delegated-municipality list, entry 415. Village Administrator Randy Kerkman is the dept contact per DSPS. Kenosha County zoning excludes Bristol (village governs its own). Not shared with neighboring Salem Lakes village. Online portal: InspectWiz. WI enforces its own UDC for 1-2 family homes.
By Joey, Founder · Last verified May 28, 2026 · How we research →
When you need a Fireplace permit
Installing a new wood-burning, gas, or pellet fireplace or wood stove requires a Wisconsin mechanical permit under SPS 323 for venting / combustion air, plus a UDC building review for hearth, clearances, and chimney structure, both issued by the Village of Bristol via InspectWiz. Gas appliances require a gas piping permit (SPS 323). EPA-certified wood stoves are required for new installations.
Fireplace Permit Costs: Bristol vs. Nearby
| City | Estimated Fee |
|---|---|
| Bristol | N/A |
| Milwaukee | $75 – $800 |
| Madison | $75 – $800 |
| Green Bay | $75 – $800 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Bristol permit costs →
Zoning Considerations
Fireplace and wood stove installations rarely trigger zoning review. Many California air quality districts (SCAQMD, BAAQMD) prohibit NEW wood-burning fireplaces in new construction. Chimney height requirements must comply with IRC R1003.9 (3 ft above roof penetration, 2 ft above any point within 10 ft horizontally).
Estimated Project Timeline
Here's a typical timeline for a fireplace project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Fireplace permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Fireplace permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Fireplace projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Fireplace permits is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Fireplace Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Fireplace Guide →