EV Charger Permit Requirements in Bristol, WI
Bristol Kenosha County (not Bristol Dane County). On WI DSPS delegated-municipality list, entry 415. Village Administrator Randy Kerkman is the dept contact per DSPS. Kenosha County zoning excludes Bristol (village governs its own). Not shared with neighboring Salem Lakes village. Online portal: InspectWiz. WI enforces its own UDC for 1-2 family homes.
By Joey, Founder · Last verified May 28, 2026 · How we research →
When you need a EV Charger permit
A Level 2 EV charger (240V) requires a Wisconsin electrical permit under SPS 316 from the Village of Bristol via InspectWiz because it requires a dedicated 240V circuit with appropriate amperage (typically 40A or 50A). A DSPS Master Electrician license is required for the work. A Level 1 charger plugged into an existing 120V outlet does not require a permit.
EV Charger Permit Costs: Bristol vs. Nearby
| City | Estimated Fee |
|---|---|
| Bristol | N/A |
| Milwaukee | $75 – $500 |
| Madison | $75 – $500 |
| Green Bay | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Bristol permit costs →
Zoning Considerations
EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.
Estimated Project Timeline
Here's a typical timeline for a ev charger project:
Timeline is based on the typical 5 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need an EV Charger permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current EV Charger permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for EV Charger permits is 5 business days. More complex projects may take longer if plan review is required.
Learn More About EV Charger Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.