EV Charger Permit Requirements in Bristol, WI

Bristol Kenosha County (not Bristol Dane County). On WI DSPS delegated-municipality list, entry 415. Village Administrator Randy Kerkman is the dept contact per DSPS. Kenosha County zoning excludes Bristol (village governs its own). Not shared with neighboring Salem Lakes village. Online portal: InspectWiz. WI enforces its own UDC for 1-2 family homes.

By Joey, Founder · Last verified May 28, 2026 · How we research →

Population: 5,000 Code: 2021 Verified: 2026-05-28 1 local rules

When you need a EV Charger permit

Required·Rule 1

A Level 2 EV charger (240V) requires a Wisconsin electrical permit under SPS 316 from the Village of Bristol via InspectWiz because it requires a dedicated 240V circuit with appropriate amperage (typically 40A or 50A). A DSPS Master Electrician license is required for the work. A Level 1 charger plugged into an existing 120V outlet does not require a permit.

Typical Timeline5 business days
SourceVillage of Bristol Building Inspection / WI SPS 316, NEC 625 · view source

EV Charger Permit Costs: Bristol vs. Nearby

CityEstimated Fee
Bristol N/A
Milwaukee $75 – $500
Madison $75 – $500
Green Bay $75 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Bristol permit costs →

Zoning Considerations

Zoning

EV chargers in private garages or driveways rarely trigger zoning review. Outdoor pedestal chargers may have setback requirements in some jurisdictions. California AB 1236 prohibits requiring a planning permit for residential EV charger installations, building official review only.

Estimated Project Timeline

Here's a typical timeline for a ev charger project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Bristol's building department, apply online here.
Week 3
Plan review & approval
Typical processing time: 5 business days. Application review and permit issuance.
Week 4+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical 5 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need an EV Charger permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameVillage of Bristol Building Inspection Department
Address19801 83rd Street, Bristol, WI 53104
HoursMon-Fri 8am-4pm Village Hall; inspections Tue and Thu mornings, 24hr notice required

Frequently Asked Questions

Contact the building department for current EV Charger permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller EV Charger projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for EV Charger permits is 5 business days. More complex projects may take longer if plan review is required.

Learn More About EV Charger Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read EV Charger Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.