Patio Permit Requirements in New Martinsville, WV

New Martinsville is a small town of 5,243 residents in West Virginia that follows the 2018 IRC. New Martinsville's building department is stricter than the standard IRC on patio work, expect fewer exemptions and more situations that require a permit. You're looking at roughly $105 – $350 in permit fees, plan on about 2 weeks for approval, plus you can apply online.

By Joey, Founder · Last verified March 28, 2026 · How we research →

Population: 5,243 Code: 2018 Verified: 2026-03-28 3 local rules

When you don’t need a Patio permit in New Martinsville

Exempt·Rule 1

Uncovered at-grade patios under 200 square feet generally do not require a building permit. The patio must still comply with setback requirements and impervious surface limits.

SourceWest Virginia Building Code / 2018 IRC with local amendments

When you need a Patio permit in New Martinsville

Required·Rule 1

Covered patios with a solid roof structure require a building permit. They are treated as structural additions and must meet wind and snow load requirements, setback rules, and building code standards.

Estimated Fee$105 – $350
Typical Timelineabout 2 weeks
SourceWest Virginia Building Code / 2018 IRC with local amendments
Required·Rule 2

Elevated patios or platforms more than 30 inches above grade are treated as decks and require a building permit. Structural footings, guard rails (minimum 36 inches), and inspections are required.

Estimated Fee$70 – $280
Typical Timelineabout 2 weeks
SourceWest Virginia Building Code / 2018 IRC with local amendments

Patio Permit Costs: New Martinsville vs. Nearby

New Martinsville's fees are right in line with the West Virginia average, $70 – $350 versus $87 – $315 statewide.

CityEstimated Fee
New Martinsville $70 – $350
Charleston $70 – $350
Huntington $70 – $350
Morgantown $70 – $350

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all New Martinsville permit costs →

Zoning Considerations

Zoning

Patios contribute to impervious surface coverage on your lot. Many cities cap total impervious coverage at 40–60% of lot area. Check with your planning department before adding large hardscape areas.

Estimated Project Timeline in New Martinsville

Here's a typical timeline for a patio project in New Martinsville, WV:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to New Martinsville's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in New Martinsville: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on New Martinsville's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Patio permit in New Martinsville, WV?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameWetzel County Building Department
Address191 Main St, New Martinsville, WV 26155
HoursMon-Fri 8:30am-4pm

Frequently Asked Questions

Estimated permit fees for Patio projects in New Martinsville, WV range from $70 – $350. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Patio projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in New Martinsville can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Patio permits in New Martinsville is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Patio Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Patio Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.