When you don’t need a Fence permit in Spokane

Exempt·Rule 1

Backyard fences 6 feet or under typically do not require a building permit.

SourceCity of Spokane Code / WA State Building Code / 2021 IRC
Exempt·Rule 2

Front yard fences 4 feet or under typically do not require a permit but must comply with zoning.

SourceCity of Spokane Code / WA State Building Code / 2021 IRC

When you need a Fence permit in Spokane

Required·Rule 1

Fences over 6 feet require a building permit.

Estimated Fee$50 – $200
Typical Timelineabout 2 weeks
SourceCity of Spokane Code / WA State Building Code / 2021 IRC

What Makes Spokane Different

Here's how Spokane's fence rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Spokane drops the height feet threshold to 6 feet. The IRC allows up to 7 feet before requiring a permit.

Spokane drops the height feet threshold to 4 feet. The IRC allows up to 7 feet before requiring a permit.

Fences over 6 feet require a building permit.

Fence Permit Costs: Spokane vs. Nearby

Spokane's fees are right in line with the Washington average, $50 – $200 versus $50 – $160 statewide.

CityEstimated Fee
Spokane $50 – $200
Seattle $90 – $300
Tacoma $70 – $240
Vancouver $50 – $240

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Spokane permit costs →

Zoning & HOA Considerations

Zoning

Front-yard fences and fences above certain heights may require zoning approval. Many cities limit front-yard fence height to 3–4 feet. Check setback and height limits with your planning department.

HOA Communities

If you live in an HOA community: hOAs frequently restrict fence materials, colors, heights, and styles, often more strictly than city code. Review your CC&Rs and submit to your Architectural Review Committee (ARC) before applying for a city permit.

Estimated Project Timeline in Spokane

Here's a typical timeline for a fence project in Spokane, WA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Spokane's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Spokane: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Spokane's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Fence permit in Spokane, WA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameDevelopment Services Center
Address808 W Spokane Falls Blvd, 3rd Floor, Spokane, WA 99201
HoursMon/Tue/Thu/Fri 8am-5pm; Wed 11am-5pm

Frequently Asked Questions

Estimated permit fees for Fence projects in Spokane, WA range from $50 – $200. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Fence projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Spokane can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Fence permits in Spokane is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Fence Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Fence Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.