ZIP 98012 straddles City of Bothell and unincorporated Snohomish County (Mill Creek / Canyon Park). Bothell itself spans King + Snohomish counties. Inside city limits: Bothell Permit Center. Outside city limits in 98012: Snohomish County PDS. All Bothell applications run through mybuildingpermit.com (regional portal). Electrical permits via WA L&I, not the city. 2021 International Codes effective in Bothell since March 15, 2024.

By Joey, Founder · Last verified May 28, 2026 · How we research →

Population: 48,161 Code: 2021 Verified: 2026-05-28 1 local rules

When you need a Window & Door permit

Required·Rule 1

WA (covering parts of ZIP 98012), permits are issued by the City of Bothell Permit Center, enforcing the 2021 International Codes adopted by Washington effective March 15, 2024. Like-for-like window/door replacement (same size, same opening) is generally exempt from a permit. Creating a new opening or significantly resizing requires a building permit because 2021 IRC R602.7 governs header sizing. Egress requirements per IRC R310 (5.7 sq ft minimum clear opening) apply for sleeping rooms. The 2021 Washington State Energy Code (WSEC) U-factor requirements for fenestration apply for replacement glass. Apply through mybuildingpermit.com.

Typical Timelineabout 1 week
SourceBothell Permit Center / 2021 IRC R310, R602.7; 2021 WSEC · view source

Windows and Doors Permit Costs: Bothell vs. Nearby

CityEstimated Fee
Bothell N/A
Seattle $120 – $480
Spokane $100 – $350
Tacoma $95 – $385

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Bothell permit costs →

Zoning & HOA Considerations

HOA Communities

If you live in an HOA community: hOAs in some communities regulate exterior window styles, frame colors, and door designs. Changing window types or adding new openings may require architectural review approval.

Estimated Project Timeline

Here's a typical timeline for a windows and doors project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Bothell's building department, apply online here.
Week 4
Plan review & approval
Typical processing time: about 1 week. Plan review examiner checks drawings for code compliance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Window & Door permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Bothell Permit Center (Community Development)
AddressCity Hall, 18415 101st Ave NE, Bothell, WA 98011
HoursPermit counter Mon-Thu 8:00am-Noon and 1:00pm-4:00pm, Fri 8:00am-Noon

Frequently Asked Questions

Contact the building department for current Windows and Doors permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Windows and Doors projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Windows and Doors permits is about 1 week. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Windows and Doors Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Windows and Doors Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.