Kitchen Remodel Permit Requirements in Virginia Beach, VA

Virginia uses VA Uniform Statewide Building Code (USBC), based on 2018 IRC/IBC.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 459,470 Code: 2018 Verified: 2026-03-29 3 local rules

When you don’t need a Kitchen permit in Virginia Beach

Exempt·Rule 1

Replacing a kitchen appliance in the same location with the same fuel type does not require a permit.

SourceVirginia Beach City Code / USBC / 2018 IRC-IBC

When you need a Kitchen permit in Virginia Beach

Required·Rule 1

Kitchen remodels involving plumbing, electrical, or gas changes require permits.

Estimated Fee$200 – $700
Typical Timelineabout 2 weeks
SourceVirginia Beach City Code / USBC / 2018 IRC-IBC
Required·Rule 2

Adding a new kitchen requires building, plumbing, electrical, and mechanical permits.

Estimated Fee$400 – $1,200
Typical Timelineabout 3 weeks
SourceVirginia Beach City Code / USBC / 2018 IRC-IBC

Kitchen Remodel Permit Costs: Virginia Beach vs. Nearby

Virginia Beach's fees are right in line with the Virginia average, $200 – $1,200 versus $193 – $625 statewide.

CityEstimated Fee
Virginia Beach $200 – $1,200
Chesterfield $180 – $1,080
Henrico $200 – $1,200
Chesapeake $170 – $1,020

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Virginia Beach permit costs →

Who's pulled permits near you in Virginia Beach?

We track 80,766 real permit records from Virginia Beach. Check what's been filed at any address, useful for buyers vetting a listing or neighbors curious about ongoing work.

Search Virginia Beach permit history →

Zoning & HOA Considerations

HOA Communities

If you live in an HOA community: interior kitchen remodels typically don't require HOA approval. If exterior changes are involved (new exhaust vents, windows, or gas line routing), check your CC&Rs.

Estimated Project Timeline in Virginia Beach

Here's a typical timeline for a kitchen remodel project in Virginia Beach, VA:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Virginia Beach's building department.
Week 4-6
Plan review & approval
Typical processing time in Virginia Beach: about 3 weeks. Plan review examiner checks drawings for code compliance.
Week 7+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Virginia Beach's typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Kitchen permit in Virginia Beach, VA?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameBuilding Permits & Inspections
Address2403 Courthouse Dr, Virginia Beach, VA 23456
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Kitchen Remodel projects in Virginia Beach, VA range from $200 – $1,200. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Kitchen Remodel projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Virginia Beach can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Kitchen Remodel permits in Virginia Beach is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Kitchen Remodel Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Kitchen Remodel Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.