Shed Permit Requirements in Smithfield, VA
Smithfield is a small town of 8,580 residents in Virginia that follows the 2021 IRC. Smithfield is generally more lenient than the standard IRC when it comes to shed projects, more exemptions and fewer permit triggers. You're looking at roughly $48 – $162 in permit fees, plan on about 2 weeks for approval, plus you can apply online.
By Joey, Founder · Last verified April 23, 2026 · How we research →
When you don’t need a Shed permit in Smithfield
Structures 120 sq ft or less are exempt.
When you need a Shed permit in Smithfield
Structures over 120 sq ft require a permit.
Sheds with electrical require a permit.
What Makes Smithfield Different
Here's how Smithfield's shed rules stack up against the standard IRC baseline that most of the country follows.
Stricter Than the IRC
Structures over 120 sq ft require a permit.
Sheds with electrical require a permit.
1 rule match the IRC baseline, no surprises there.
Shed Permit Costs: Smithfield vs. Nearby
Smithfield comes in on the low side for Virginia. You're looking at $32 – $162 here, compared to the state average of $62 – $208.
| City | Estimated Fee |
|---|---|
| Smithfield | $32 – $162 |
| Virginia Beach | $50 – $300 |
| Chesterfield | $45 – $270 |
| Henrico | $100 – $300 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Smithfield permit costs →
Zoning Considerations
Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.
Estimated Project Timeline in Smithfield
Here's a typical timeline for a shed project in Smithfield, VA:
Timeline is based on Smithfield's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Shed permit in Smithfield, VA?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Estimated permit fees for Shed projects in Smithfield, VA range from $32 – $162. Fees vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Smithfield can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Shed permits in Smithfield is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Shed Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Shed Guide →