Plumbing Work Permit Requirements in Shoreham, VT
Addison County. Vermont does NOT have a statewide residential building code enforced via local inspectors for 1-2 family homes. The Vermont Residential Building Energy Standards (RBES, 2020 update) are self-certified by builders. State plumbing and electrical permits go through the VT Division of Fire Safety. The only town-level permit is a Zoning Permit issued by Zoning Administrator Robin Conway. Town Clerk Laura Siebecker (802-897-5841) records permits but does not issue building permits.
Shoreham does not publish a building permit process online and we could not verify a current building authority. The guidance below is based on baseline IRC code (the most commonly adopted residential code) plus state-mandated layers. Before starting any work, call the village office at 802-897-2668 to confirm what permits and inspections actually apply.
By Joey, Founder · Last verified May 28, 2026 · How we research →
When you need a Plumbing permit
Plumbing work beyond like-for-like fixture replacement (new fixtures, moved drain/vent, water service, sewer service) requires a Vermont state plumbing permit from the Vermont Plumbers Examining Board within the Vermont Division of Fire Safety (DFS). Shoreham has no town building department. A licensed VT Master Plumber or Journeyman Plumber under a Master is required for paid work per 26 V.S.A. Chapter 73. If the home is on a private septic system, VT DEC Wastewater System & Potable Water Supply Permit review applies for any new fixtures or system change.
Plumbing Work Permit Costs: Shoreham vs. Nearby
| City | Estimated Fee |
|---|---|
| Shoreham | N/A |
| Burlington | $50 – $600 |
| South Burlington | $50 – $600 |
| Rutland | $40 – $320 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Shoreham permit costs →
Estimated Project Timeline
Here's a typical timeline for a plumbing work project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Plumbing permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Plumbing Work permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Plumbing Work projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Plumbing Work permits is about 2 weeks. More complex projects may take longer if plan review is required.