Driveway Permit Requirements in Shoreham, VT
Addison County. Vermont does NOT have a statewide residential building code enforced via local inspectors for 1-2 family homes. The Vermont Residential Building Energy Standards (RBES, 2020 update) are self-certified by builders. State plumbing and electrical permits go through the VT Division of Fire Safety. The only town-level permit is a Zoning Permit issued by Zoning Administrator Robin Conway. Town Clerk Laura Siebecker (802-897-5841) records permits but does not issue building permits.
Shoreham does not publish a building permit process online and we could not verify a current building authority. The guidance below is based on baseline IRC code (the most commonly adopted residential code) plus state-mandated layers. Before starting any work, call the village office at 802-897-2668 to confirm what permits and inspections actually apply.
By Joey, Founder · Last verified May 28, 2026 · How we research →
When you need a Driveway permit
A new driveway connection requires Town of Shoreham approval for the right-of-way / culvert (contact Town Office, 802-897-5841), or a Vermont Agency of Transportation (VTrans) Section 1111 access permit if the driveway connects to a state-maintained route (such as VT-22A or VT-74). The town does not have a building code, but the Selectboard / Highway Department issues the local access permit. Confirm sight-distance and culvert sizing before pouring.
Driveway Permit Costs: Shoreham vs. Nearby
| City | Estimated Fee |
|---|---|
| Shoreham | N/A |
| Burlington | $75 – $500 |
| South Burlington | $75 – $500 |
| Rutland | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Shoreham permit costs →
Zoning Considerations
Driveways that require a new curb cut involve public right-of-way work and always need a permit. Driveway width and impervious surface limits vary by city.
Estimated Project Timeline
Here's a typical timeline for a driveway project:
Timeline is based on the typical about 3 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Driveway permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Driveway permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Driveway projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Driveway permits is about 3 weeks. More complex projects may take longer if plan review is required.
Learn More About Driveway Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Driveway Guide →