Shed Permit Requirements in Salt Lake City, UT

Utah adopted 2021 IRC statewide with state amendments.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 199,723 Code: 2021 Verified: 2026-03-29 3 local rules

When you don’t need a Shed permit in Salt Lake City

Exempt·Rule 1

Detached accessory structures (sheds) 200 sq ft or less and one story are generally exempt from a building permit per IRC R105.2.

SourceSalt Lake City Municipal Code / 2021 IRC

When you need a Shed permit in Salt Lake City

Required·Rule 1

Sheds over 200 sq ft require a building permit.

Estimated Fee$75 – $300
Typical Timelineabout 2 weeks
SourceSalt Lake City Municipal Code / 2021 IRC
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

Estimated Fee$50 – $150
Typical Timelineabout 1 week
SourceSalt Lake City Municipal Code / 2021 IRC

What Makes Salt Lake City Different

Here's how Salt Lake City's shed rules stack up against the standard IRC baseline that most of the country follows.

Stricter Than the IRC

Sheds over 200 sq ft require a building permit.

Sheds with electrical wiring require an electrical permit regardless of size.

More Lenient Than the IRC

Salt Lake City sets the square footage threshold at 200 sq ft, the IRC standard is 120 sq ft. That gives you more room before a permit kicks in.

Shed Permit Costs: Salt Lake City vs. Nearby

Salt Lake City's fees are right in line with the Utah average, $50 – $300 versus $50 – $168 statewide.

CityEstimated Fee
Salt Lake City $50 – $300
West Valley City $42 – $255
West Jordan $37 – $187
Provo $40 – $240

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Salt Lake City permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Salt Lake City

Here's a typical timeline for a shed project in Salt Lake City, UT:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Salt Lake City's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Salt Lake City: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Salt Lake City's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Salt Lake City, UT?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameSalt Lake City Building Services
Address451 S. State St., Room 215, Salt Lake City, UT 84111
HoursMon-Fri 8am-5pm

Frequently Asked Questions

Estimated permit fees for Shed projects in Salt Lake City, UT range from $50 – $300. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Salt Lake City can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits in Salt Lake City is about 2 weeks. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.