Concrete Slab Permit Requirements in Keller, TX
City of Keller Building Services (a division of Community Development) issues building, electrical, mechanical, and plumbing permits for the City of Keller, a home-rule city in Tarrant County (DFW metro, pop ~50,000). Codes in force: 2021 IRC, IBC, IPC, IMC, IFGC, 2020 NEC, 2018 IECC. Tree preservation ordinance in the Unified Development Code; larger tree removal may require a permit plus mitigation. Electrical, plumbing, HVAC, and irrigation work requires state-licensed contractors (TSBPE for electricians, TDLR for most other trades). Pool and spa barriers must meet Texas Administrative Code Ch 265 and IRC R326 (4 foot barrier, self-closing self-latching gate). Owner-builder permits allowed for primary residence under Texas law. General phone (817) 743-4110. eTRAKiT online permit portal at trakitweb.cityofkeller.com/etrakit/. Mailing address: PO Box 770, Keller, TX 76244. Closed Fridays for major permit review; minor and over-the-counter permits still processed M-F 8 to 5.
By Joey, Founder · Last verified April 23, 2026 · How we research →
When you don’t need a Concrete Slab permit in Keller
Small concrete slabs on grade (walkways or patios) 200 sq ft or less that do not support a structure are exempt from a building permit per 2021 IRC R105.2. Drainage and impervious cover limits under Keller zoning still apply.
When you need a Concrete Slab permit in Keller
Concrete slabs over 200 sq ft, any slab that supports a structure, or a slab poured in a drainage easement requires a building permit.
Concrete Slab Permit Costs: Keller vs. Nearby
| City | Estimated Fee |
|---|---|
| Keller | N/A |
| Houston | $75 – $600 |
| San Antonio | $75 – $600 |
| Dallas | $75 – $600 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Keller permit costs →
Zoning & HOA Considerations
Concrete slabs contribute to impervious surface coverage. Austin, Portland, Seattle, and many coastal cities cap impervious cover at 40-65% of lot area. Sidewalks and curb cuts in the public right-of-way always require a separate Public Works encroachment permit.
If you live in an HOA community: hOAs may restrict new concrete installations, especially front-yard additions visible from the street. Changes to driveway width or walkway placement typically need ARC approval.
Estimated Project Timeline in Keller
Here's a typical timeline for a concrete slab project in Keller, TX:
Timeline is based on Keller's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Concrete Slab permit in Keller, TX?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact Keller's building department for current Concrete Slab permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Concrete Slab projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Keller can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Concrete Slab permits in Keller is about 2 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About Concrete Slab Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Concrete Slab Guide →