Concrete Slab Permit Requirements in Justin, TX
City of Justin is an incorporated municipality in southern Denton County, TX, on the northwest edge of the DFW metroplex along the TX-156 / I-35W corridor near Roanoke and Northlake. The Building Inspections & Permits division sits inside the Development Services Department (which also includes Planning & Zoning, GIS, and Code Compliance). All building permit applications, plan submittals, inspection requests, and contractor registrations are processed through the iWorQ online portal (in production since January 2, 2023). All contractors must register with the City of Justin before performing work within city limits. Adopted codes (verified on the live building dept page): 2018 International Building Code, 2018 International Residential Code, 2018 International Energy Code, 2018 International Plumbing Code, and 2017 National Electrical Code (Justin is on the 2018 I-codes, not the 2021 cycle some neighboring DFW cities use). Staff contacts published on the page: Sasha Torres (Building Official) and Patricia Hollis (Permit Technician); direct email addresses are routed through CivicPlus contact forms rather than public mailto links, so no direct email is listed. Fee schedule is published as the Treeline Fees How-to Guide PDF served from the city's DocumentCenter. Counter hours are not posted on the building dept page or the homepage; main city phone line 940-648-2541. ZIP 76247 also covers neighboring portions of Roanoke and unincorporated Denton County; for parcels inside Justin city limits, this department is the AHJ. Practical notes for homeowners: vicinity to DFW International Airport and Alliance/Fort Worth Meacham airspace means FAA Part 77 notice may be triggered for tall accessory structures (towers, large flagpoles, antennas) depending on parcel location; the area is in TDLR / Texas-administered seismic and wind territory with ASCE 7 wind design for North Texas (DFW tornado-alley periphery) and expansive (shrink-swell) North Texas clay soils that drive foundation and pier design for residential additions, pools, and retaining walls. TxDOT FM-156 / SH-114 corridor parcels may require a TxDOT driveway/right-of-way permit in addition to the city permit.
By Joey, Founder · Last verified May 23, 2026 · How we research →
When you don’t need a Concrete Slab permit in Justin
Small concrete slabs on grade (walkways or patios) 200 sq ft or less that do not support a structure are exempt from a building permit per 2018 IRC R105.2. Drainage and impervious cover limits under Justin zoning still apply.
When you need a Concrete Slab permit in Justin
Concrete slabs over 200 sq ft, any slab that supports a structure, or a slab poured in a drainage easement requires a building permit.
Concrete Slab Permit Costs: Justin vs. Nearby
| City | Estimated Fee |
|---|---|
| Justin | N/A |
| Houston | $75 – $600 |
| San Antonio | $75 – $600 |
| Dallas | $75 – $600 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Justin permit costs →
Zoning Considerations
Concrete slabs contribute to impervious surface coverage. Austin, Portland, Seattle, and many coastal cities cap impervious cover at 40-65% of lot area. Sidewalks and curb cuts in the public right-of-way always require a separate Public Works encroachment permit.
Estimated Project Timeline in Justin
Here's a typical timeline for a concrete slab project in Justin, TX:
Timeline is based on Justin's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Concrete Slab permit in Justin, TX?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact Justin's building department for current Concrete Slab permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Concrete Slab projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit in Justin can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Concrete Slab permits in Justin is about 2 weeks. More complex projects may take longer if plan review is required.
Learn More About Concrete Slab Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Concrete Slab Guide →