Shed Permit Requirements in Humble, TX

CORRECTION: AHJ changed from Harris County to the City of Humble. Inside Humble city limits the City of Humble Building & Inspection Department (114 W. Higgins St, Chief Building Official Ray Pearson, 281-446-6228) is the correct AHJ; Harris County's Office of the County Engineer Permits Division regulates only unincorporated areas. Texas has no statewide residential code; Humble adopted the 2018 IRC (Code of Ordinances Ch. 4, Art. 4.02) plus 2018 IBC/IPC/IMC/IFC, 2017 NEC, and 2018 Energy Code. Permits filed via the iWorq portal, though most plan-review permits must be submitted in person. Residential fees from the official Oct 1, 2024 fee schedule: Building Permit $50.00 + $0.32/sq ft of roof-covered floor space; Fence $50.00 + $1.00/25 LF; Electrical $50-$150; Plumbing $50-$100.

By Joey, Founder · Last verified May 31, 2026 · How we research →

Population: 16,795 Code: 2018 IRC Verified: 2026-05-31 1 local rules

When you need a Shed permit

Required·Rule 1

Inside the City of Humble, an accessory building such as a storage shed requires a permit from the City of Humble Building & Inspection Department under the 2018 IRC. The structure is permitted under the Residential Building Permit at $50.00 plus $0.32 per square foot of roof-covered floor space, and adding power makes the accessory-building electrical permit $75.00 per the Oct 1, 2024 fee schedule. Confirm the exact accessory-structure category with the Building Department.

Estimated Fee$50 – $0
Typical Timelineabout 1 week
SourceCity of Humble Building & Inspection Dept / Code of Ordinances Ch. 4 Art. 4.02 (2018 IRC) / Permit Fee Schedule eff. Oct 1, 2024 · view source

Shed Permit Costs: Humble vs. Nearby

Humble comes in on the low side for Texas. You're looking at From $50 here, compared to the state average of $71 – $258.

CityEstimated Fee
Humble From $50
Houston $75 – $500
San Antonio $65 – $425
Dallas $75 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Humble permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline

Here's a typical timeline for a shed project:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Humble's building department, apply online here.
Week 3
Plan review & approval
Typical processing time: about 1 week. Application review and permit issuance.
Week 4+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on the typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Humble Building & Inspection Department
Address114 W. Higgins St, Humble, TX 77338
HoursMon-Fri 7:30am-4:30pm

Frequently Asked Questions

Estimated permit fees for Shed projects range from From $50. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits is about 1 week. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-31. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.