Shed Permit Requirements in Humble, TX
CORRECTION: AHJ changed from Harris County to the City of Humble. Inside Humble city limits the City of Humble Building & Inspection Department (114 W. Higgins St, Chief Building Official Ray Pearson, 281-446-6228) is the correct AHJ; Harris County's Office of the County Engineer Permits Division regulates only unincorporated areas. Texas has no statewide residential code; Humble adopted the 2018 IRC (Code of Ordinances Ch. 4, Art. 4.02) plus 2018 IBC/IPC/IMC/IFC, 2017 NEC, and 2018 Energy Code. Permits filed via the iWorq portal, though most plan-review permits must be submitted in person. Residential fees from the official Oct 1, 2024 fee schedule: Building Permit $50.00 + $0.32/sq ft of roof-covered floor space; Fence $50.00 + $1.00/25 LF; Electrical $50-$150; Plumbing $50-$100.
By Joey, Founder · Last verified May 31, 2026 · How we research →
When you need a Shed permit
Inside the City of Humble, an accessory building such as a storage shed requires a permit from the City of Humble Building & Inspection Department under the 2018 IRC. The structure is permitted under the Residential Building Permit at $50.00 plus $0.32 per square foot of roof-covered floor space, and adding power makes the accessory-building electrical permit $75.00 per the Oct 1, 2024 fee schedule. Confirm the exact accessory-structure category with the Building Department.
Shed Permit Costs: Humble vs. Nearby
Humble comes in on the low side for Texas. You're looking at From $50 here, compared to the state average of $71 – $258.
| City | Estimated Fee |
|---|---|
| Humble | From $50 |
| Houston | $75 – $500 |
| San Antonio | $65 – $425 |
| Dallas | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Humble permit costs →
Zoning & HOA Considerations
Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.
If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.
Estimated Project Timeline
Here's a typical timeline for a shed project:
Timeline is based on the typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Shed permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Estimated permit fees for Shed projects range from From $50. Fees vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Shed permits is about 1 week. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About Shed Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Shed Guide →