Driveway Permit Requirements in Humble, TX
CORRECTION: AHJ changed from Harris County to the City of Humble. Inside Humble city limits the City of Humble Building & Inspection Department (114 W. Higgins St, Chief Building Official Ray Pearson, 281-446-6228) is the correct AHJ; Harris County's Office of the County Engineer Permits Division regulates only unincorporated areas. Texas has no statewide residential code; Humble adopted the 2018 IRC (Code of Ordinances Ch. 4, Art. 4.02) plus 2018 IBC/IPC/IMC/IFC, 2017 NEC, and 2018 Energy Code. Permits filed via the iWorq portal, though most plan-review permits must be submitted in person. Residential fees from the official Oct 1, 2024 fee schedule: Building Permit $50.00 + $0.32/sq ft of roof-covered floor space; Fence $50.00 + $1.00/25 LF; Electrical $50-$150; Plumbing $50-$100.
By Joey, Founder · Last verified May 31, 2026 · How we research →
When you need a Driveway permit
Inside the City of Humble, a new driveway or a culvert/approach connecting to a city street typically requires a permit from the City of Humble, and work in the public right-of-way needs City approval. If the connection is to a TxDOT roadway, a TxDOT access-driveway permit is required instead. Confirm the driveway/right-of-way fee with the Building & Inspection Department.
Driveway Permit Costs: Humble vs. Nearby
| City | Estimated Fee |
|---|---|
| Humble | N/A |
| Houston | $75 – $500 |
| San Antonio | $75 – $500 |
| Dallas | $75 – $500 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Humble permit costs →
Zoning & HOA Considerations
Driveways that require a new curb cut involve public right-of-way work and always need a permit. Driveway width and impervious surface limits vary by city.
If you live in an HOA community: hOAs often regulate driveway materials, width, and appearance. Widening a driveway or changing from concrete to gravel (or vice versa) may need architectural review approval.
Estimated Project Timeline
Here's a typical timeline for a driveway project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Driveway permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Driveway permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Driveway projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Driveway permits is about 2 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About Driveway Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Driveway Guide →