Demolition Permit Requirements in Humble, TX
CORRECTION: AHJ changed from Harris County to the City of Humble. Inside Humble city limits the City of Humble Building & Inspection Department (114 W. Higgins St, Chief Building Official Ray Pearson, 281-446-6228) is the correct AHJ; Harris County's Office of the County Engineer Permits Division regulates only unincorporated areas. Texas has no statewide residential code; Humble adopted the 2018 IRC (Code of Ordinances Ch. 4, Art. 4.02) plus 2018 IBC/IPC/IMC/IFC, 2017 NEC, and 2018 Energy Code. Permits filed via the iWorq portal, though most plan-review permits must be submitted in person. Residential fees from the official Oct 1, 2024 fee schedule: Building Permit $50.00 + $0.32/sq ft of roof-covered floor space; Fence $50.00 + $1.00/25 LF; Electrical $50-$150; Plumbing $50-$100.
By Joey, Founder · Last verified May 31, 2026 · How we research →
When you need a Demolition permit
Inside the City of Humble, demolishing a structure requires a demolition permit from the City of Humble Building & Inspection Department. Water, sewer, gas, and electric services must be disconnected and documented before demolition begins. Texas asbestos survey and TCEQ/DSHS notification rules apply to demolition of regulated structures.
Demolition Permit Costs: Humble vs. Nearby
| City | Estimated Fee |
|---|---|
| Humble | N/A |
| Houston | $100 – $1,000 |
| San Antonio | $100 – $1,000 |
| Dallas | $100 – $1,000 |
Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Humble permit costs →
Zoning & HOA Considerations
Properties in historic districts may require historic review board approval before demolition. Some cities require a waiting period for demolition permits to allow for public comment.
If you live in an HOA community: demolition of visible structures (garages, sheds, accessory buildings) may require HOA notification or approval. Check your CC&Rs, some communities require maintaining certain structures or replacing them within a set timeframe.
Estimated Project Timeline
Here's a typical timeline for a demolition project:
Timeline is based on the typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.
Need a Demolition permit?
Answer a few quick questions for a personalized answer about your specific project.
Check Now, Free →Building Department Contact
Frequently Asked Questions
Contact the building department for current Demolition permit fee information. Fees typically vary based on project scope and valuation.
It depends on the specifics of your project. Some smaller Demolition projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.
Working without a required permit can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.
Typical approval time for Demolition permits is about 2 weeks. More complex projects may take longer if plan review is required.
If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.
Learn More About Demolition Permits
Read our complete guide covering permit requirements, costs, common exemptions, and the application process.
Read Demolition Guide →