Shed Permit Requirements in Soddy-Daisy, TN

City in Hamilton County, part of the Chattanooga metro area. Tennessee follows state-adopted building codes based on the IRC 2018 cycle.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 13,510 Code: 2018 Verified: 2026-03-29 3 local rules

When you don’t need a Shed permit in Soddy-Daisy

Exempt·Rule 1

Sheds 120 sq ft or less are generally exempt from a building permit per Tennessee State Building Code / 2021 IRC Section R105.2.

SourceTennessee State Building Code / 2021 IRC · view source

When you need a Shed permit in Soddy-Daisy

Required·Rule 1

Sheds over 120 sq ft require a building permit.

Estimated Fee$55 – $225
Typical Timeline5 business days
SourceTennessee State Building Code / 2021 IRC · view source
Required·Rule 2

Sheds with electrical wiring require an electrical permit regardless of size.

Estimated Fee$40 – $110
Typical Timeline5 business days
SourceTennessee State Building Code / 2021 IRC · view source

Shed Permit Costs: Soddy-Daisy vs. Nearby

Soddy-Daisy comes in on the low side for Tennessee. You're looking at $40 – $225 here, compared to the state average of $52 – $187.

CityEstimated Fee
Soddy-Daisy $40 – $225
Nashville $50 – $300
Memphis $50 – $300
Knoxville $50 – $300

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Soddy-Daisy permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Soddy-Daisy

Here's a typical timeline for a shed project in Soddy-Daisy, TN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Soddy-Daisy's building department, apply online here.
Week 4
Plan review & approval
Typical processing time in Soddy-Daisy: 5 business days. Plan review examiner checks drawings for code compliance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Soddy-Daisy's typical 5 business days permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Soddy-Daisy, TN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameSoddy-Daisy Building & Permits
Address9835 Dayton Pike, Soddy-Daisy, TN 37379
HoursMon-Fri 8am-4pm

Frequently Asked Questions

Estimated permit fees for Shed projects in Soddy-Daisy, TN range from $40 – $225. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Soddy-Daisy can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits in Soddy-Daisy is 5 business days. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.