Shed Permit Requirements in Maryville, TN

Uses TN state default 2018 IRC with state amendments.

By Joey, Founder · Last verified March 29, 2026 · How we research →

Population: 32,436 Code: 2018 Verified: 2026-03-29 4 local rules 1 people checked this

When you don’t need a Shed permit in Maryville

Exempt·Rule 1

Residential sheds 200 square feet or smaller are exempt from a building permit when on a permanent foundation. Pre-manufactured sheds without a permanent foundation are exempt up to 400 square feet. (Maryville amends IRC R105.2 Item 1 in its 2024 IRC local modifications.)

SourceCity of Maryville Local Modifications to 2024 IRC, Section R105.2 Item 1 · view source

When you need a Shed permit in Maryville

Required·Rule 1

A shed between 201 and 400 square feet on a permanent foundation requires a building permit. The exemption only applies to pre-manufactured buildings without a permanent foundation in this size range. (Maryville IRC R105.2 Item 1, 2024 IRC local modifications.)

SourceCity of Maryville Local Modifications to 2024 IRC, Section R105.2 Item 1 · view source
Required·Rule 2

Sheds over 400 square feet always require a building permit. Sheds between 201 and 400 square feet require a permit if they sit on a permanent foundation; pre-manufactured sheds in that size range without a permanent foundation remain exempt. (Maryville amends IRC R105.2 Item 1 in its 2024 IRC local modifications.)

Estimated Fee$60 – $240
Typical Timelineabout 1 week
SourceCity of Maryville Local Modifications to 2024 IRC, Section R105.2 Item 1 · view source
Required·Rule 3

Sheds with electrical wiring require an electrical permit regardless of size.

Estimated Fee$40 – $120
Typical Timeline4 business days
SourceCity of Maryville Code / 2018 IRC with TN state amendments

Shed Permit Costs: Maryville vs. Nearby

Maryville comes in on the low side for Tennessee. You're looking at $40 – $240 here, compared to the state average of $52 – $187.

CityEstimated Fee
Maryville $40 – $240
Nashville $50 – $300
Memphis $50 – $300
Knoxville $50 – $300

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Maryville permit costs →

Zoning & HOA Considerations

Zoning

Sheds may be subject to zoning setback requirements and lot coverage limits. Placement near property lines or in front yards may require zoning approval.

HOA Communities

If you live in an HOA community: many HOAs restrict or prohibit outbuildings. Check your CC&Rs for rules on shed size, placement, materials, and appearance before purchasing or building.

Estimated Project Timeline in Maryville

Here's a typical timeline for a shed project in Maryville, TN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Maryville's building department, apply online here.
Week 4
Plan review & approval
Typical processing time in Maryville: about 1 week. Plan review examiner checks drawings for code compliance.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Maryville's typical about 1 week permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Shed permit in Maryville, TN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCodes Department
Address416 W. Broadway Avenue, Maryville, TN 37801
HoursMon-Fri 8am-5pm (closed 12-1pm)

Frequently Asked Questions

Estimated permit fees for Shed projects in Maryville, TN range from $40 – $240. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Shed projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Maryville can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Shed permits in Maryville is about 1 week. More complex projects may take longer if plan review is required.

If you live in an HOA community, you may need architectural review approval in addition to a building permit. HOA rules and city building codes are separate, you may need to satisfy both. Review your CC&Rs and submit to your HOA's architectural review committee before starting work.

Learn More About Shed Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Shed Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-29. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.