Swimming Pool, Hot Tub, or Spa Permit Requirements in Camden, TN

City of Camden (pop ~3,500, Benton County seat) runs its own Building & Codes Enforcement department out of City Hall. Building Inspector listed in the city directory is Bill Uchyn, reachable via the main City Hall line (731) 584-4656. Permits are not currently submitted online; applications are handled in person/by phone at City Hall. Benton County itself does not operate a residential building inspections department for unincorporated areas (TN State Fire Marshal residential program governs there).

By Joey, Founder · Last verified May 15, 2026 · How we research →

Population: 3,674 Code: 2018 Verified: 2026-05-15 1 local rules

When you need a Pool & Hot Tub permit in Camden

Required·Rule 1

In-ground and above-ground pools deeper than 24 inches require a building permit plus electrical permit (bonding) plus often a separate fence permit (pool barrier under IRC R326). Pool barriers, self-closing gates, and door alarms are non-negotiable life-safety requirements. To confirm requirements for your specific project in Camden, TN, contact City of Camden Building & Codes Enforcement at (731) 584-4656. Visit: https://www.cityofcamdentn.com/planning.html.

SourceCity of Camden Building & Codes Enforcement — phone (731) 584-4656 · view source

Swimming Pool, Hot Tub, or Spa Permit Costs: Camden vs. Nearby

CityEstimated Fee
Camden N/A
Nashville $100 – $1,500
Memphis $100 – $1,500
Knoxville $100 – $1,500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Camden permit costs →

Zoning Considerations

Zoning

Pools may require zoning approval for setback compliance. Many jurisdictions have minimum distance requirements from property lines and easements.

Estimated Project Timeline in Camden

Here's a typical timeline for a swimming pool, hot tub, or spa project in Camden, TN:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Camden's building department.
Week 4-5
Plan review & approval
Processing time varies, contact Camden's building department for current turnaround times.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Pool & Hot Tub permit in Camden, TN?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Camden Building & Codes Enforcement
Address110 Highway 641 South, P.O. Box 779, Camden, TN 38320
HoursMon-Fri 8:00am-4:00pm

Frequently Asked Questions

Contact Camden's building department for current Swimming Pool, Hot Tub, or Spa permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Swimming Pool, Hot Tub, or Spa projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Camden can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact Camden's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

Learn More About Swimming Pool, Hot Tub, or Spa Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Swimming Pool, Hot Tub, or Spa Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-15. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.