Swimming Pool, Hot Tub, or Spa Permit Requirements in Lincoln, ND

Small city near Bismarck in Burleigh County. Some permits handled by Burleigh County Building/Planning/Zoning. North Dakota adopted the 2024 IRC effective January 1, 2026.

By Joey, Founder · Last verified March 28, 2026 · How we research →

Population: 4,502 Code: 2024 Verified: 2026-03-28 4 local rules

When you don’t need a Pool & Hot Tub permit in Lincoln

Exempt·Rule 1

Small above-ground pools 24 inches deep or less are exempt from a permit.

SourceCity of Lincoln / 2024 IRC

When you need a Pool & Hot Tub permit in Lincoln

Required·Rule 1

Above-ground pools deeper than 24 inches require building and electrical permits.

Estimated Fee$140 – $420
Typical Timelineabout 2 weeks
SourceCity of Lincoln / 2024 IRC
Required·Rule 2

In-ground pools require building, electrical, and plumbing permits.

Estimated Fee$350 – $1,400
Typical Timelineabout 2 weeks
SourceCity of Lincoln / 2024 IRC
Required·Rule 3

Hot tubs with permanent electrical connections require building and electrical permits.

Estimated Fee$87 – $280
Typical Timelineabout 1 week
SourceCity of Lincoln / 2024 IRC

Swimming Pool, Hot Tub, or Spa Permit Costs: Lincoln vs. Nearby

Lincoln comes in on the low side for North Dakota. You're looking at $87 – $1,400 here, compared to the state average of $194 – $714.

CityEstimated Fee
Lincoln $87 – $1,400
Fargo $125 – $2,000
Bismarck $125 – $2,000
Grand Forks $125 – $2,000

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Lincoln permit costs →

Zoning Considerations

Zoning

Pools may require zoning approval for setback compliance. Many jurisdictions have minimum distance requirements from property lines and easements.

Estimated Project Timeline in Lincoln

Here's a typical timeline for a swimming pool, hot tub, or spa project in Lincoln, ND:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings (plan drawings required).
Week 2
Prepare permit documents
Contractor prepares site plan, construction drawings, and permit application. Gather required documents per your city's checklist.
Week 3
Submit permit application
Your contractor submits the application to Lincoln's building department, apply online here.
Week 4-5
Plan review & approval
Typical processing time in Lincoln: about 2 weeks. Plan review examiner checks drawings for code compliance.
Week 6+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Timeline is based on Lincoln's typical about 2 weeks permit processing time. Actual timelines vary by project complexity, completeness of application, and current department workload.

Need a Pool & Hot Tub permit in Lincoln, ND?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Lincoln Building Department
Address2090 E Main St, Lincoln, ND 58504
HoursMon-Fri 8:00am-5:00pm

Frequently Asked Questions

Estimated permit fees for Swimming Pool, Hot Tub, or Spa projects in Lincoln, ND range from $87 – $1,400. Fees vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Swimming Pool, Hot Tub, or Spa projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Lincoln can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Typical approval time for Swimming Pool, Hot Tub, or Spa permits in Lincoln is about 2 weeks. More complex projects may take longer if plan review is required.

Learn More About Swimming Pool, Hot Tub, or Spa Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Swimming Pool, Hot Tub, or Spa Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-03-28. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.