Tree Removal Permit Requirements in Horace, ND

Horace is a fast-growing Fargo metro suburb in Cass County (population ~3,085 in 2020, ~6,286 estimated 2024). The city operates its own Building Permits and Inspections department covering building permits, land use (fences/signs), right-of-way, and boulevard tree permits. Online applications and inspection requests via SmartGov citizen portal. Mailing address is PO Box 99; physical City Hall street address not surfaced on portal pages and left out rather than guessed. Fee schedule referenced as PDFs on the residential page but no stable absolute URL captured; left null.

By Joey, Founder · Last verified May 15, 2026 · How we research →

Population: 6,286 Code: 2021 Verified: 2026-05-15 1 local rules

When you don’t need a Tree Removal permit in Horace

Exempt·Rule 1

Tree removal permits are typically required for protected/heritage trees on private property, trees in the public right-of-way, and trees over a diameter threshold (commonly 6 to 12 inches DBH) in tree-protection-ordinance cities. Hazardous-tree removal often qualifies for an emergency administrative exemption. To confirm requirements for your specific project in Horace, ND, contact City of Horace Building Permits and Inspections at (701) 492-2972. Apply online: https://ci-horace-nd.smartgovcommunity.com/Public/Home.

SourceCity of Horace Building Permits and Inspections — phone (701) 492-2972 · view source

Tree Removal Permit Costs: Horace vs. Nearby

CityEstimated Fee
Horace N/A
Fargo $25 – $500
Bismarck $25 – $500
Grand Forks $25 – $500

Fees shown are estimates based on local building code data. Actual fees may vary based on project scope and valuation. See all Horace permit costs →

Zoning Considerations

Zoning

Many cities protect trees above a certain diameter at breast height (DBH), commonly 6", 12", 19", or 20", and some cities protect specific species (oak, sycamore) regardless of size. Portland, Atlanta, Austin, Seattle, and Los Angeles all have significant tree protection rules. Houston and most of Texas have none.

Estimated Project Timeline in Horace

Here's a typical timeline for a tree removal project in Horace, ND:

Week 1
Get quotes & finalize design
Contact licensed contractors, get 3+ quotes, finalize project scope and drawings.
Week 2
Submit permit application
Your contractor submits the application to Horace's building department, apply online here.
Week 3-4
Plan review & approval
Processing time varies, contact Horace's building department for current turnaround times.
Week 5+
Construction & inspections
Post the permit card on site. Work begins. Schedule inspections at required stages (varies by project). Final inspection required before closing the permit.

Need a Tree Removal permit in Horace, ND?

Answer a few quick questions for a personalized answer about your specific project.

Check Now, Free →

Building Department Contact

NameCity of Horace Building Permits and Inspections
AddressPO Box 99, Horace, ND 58047
HoursMon-Fri 8:00am-4:00pm

Frequently Asked Questions

Contact Horace's building department for current Tree Removal permit fee information. Fees typically vary based on project scope and valuation.

It depends on the specifics of your project. Some smaller Tree Removal projects may be exempt from permit requirements, while larger ones typically require a permit. Use our free lookup tool to check your specific situation.

Working without a required permit in Horace can result in fines, stop-work orders, being required to remove completed work, and complications when selling your home. It's always best to check first.

Contact Horace's building department for current processing times. Timelines vary based on project complexity and whether plan review is required.

Learn More About Tree Removal Permits

Read our complete guide covering permit requirements, costs, common exemptions, and the application process.

Read Tree Removal Guide →

Estimate your permit fees →

Disclaimer: This information was last verified on 2026-05-15. Building permit requirements may change. Zoning requirements (setbacks, lot coverage, height limits) are separate and vary by location. Always confirm with your local building and planning departments before starting your project. PermitMint provides general guidance, not legal advice.